1408
|
Tuesday, November 29, 2016, 06:27 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS water pumps are stopped |
Argon venting on TCS and TM2 is processing |
|
1407
|
Friday, November 25, 2016, 09:04 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#35 | Spent Target move |
On November 24th 2016 the spent SiC#35 was moved from the south hot cell to the spent target vault. see attached pdf for details. |
Attachment 1: Vault_Storage_November_24_2016.pdf
|
|
|
1406
|
Thursday, November 24, 2016, 10:30 |
David Wang | Conditioning Station | Standard Operation | TM2 | | HV cover is installed on TM2 at TCS |
Interlock key are returned back to B2 level.TM2 is ready for HV conditioning and heating up at TCS. |
|
1405
|
Thursday, November 24, 2016, 09:33 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | UC#18 | Conditioning UC#18 |
Thursday, November 24, 2016, 09:33: Water package on
Thursday, November 24, 2016, 09:43: TCS:WPV1 shows only 12% open. A visual inspection confirms the valve is fully opened. Controls will be contacted to troubleshoot
|
|
1404
|
Wednesday, November 23, 2016, 16:21 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 and TCS vacuum system has been connected. |
All vacuum pumps have been started. Air ballast 50seconds on roughing pump. Everything is good so far. |
|
1403
|
Wednesday, November 23, 2016, 16:10 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. |
Chad and I leak checked TM2 HS line with new UCx target installed. Helium spray 2 seconds on each joint and 10seconds flushing around target in SHC. LD base LR: 0.0XE-9atm.cc/sec, base pressure:0.0XE-4 torr. No response has been found on LD during check. The line is leak free. |
|
1402
|
Wednesday, November 23, 2016, 14:25 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | UC#18 | Electrical Check |
Results of TM#2 with UC#18 electrical at the south hot cell. See attached PDF for details. |
Attachment 1: TM2_elechk_UC18_SHC.PDF
|
|
|
1401
|
Wednesday, November 23, 2016, 14:21 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | UC#18 | module moved |
TM#2 with UC#18 has been moved from the south hot cell to the conditioning station. |
|
1400
|
Tuesday, November 22, 2016, 14:26 |
David Wang | Conditioning Station | Standard Operation | | | TCS vacuum pumps are switched off |
TCS will be vented tomorrow morning for TM2 moving. |
|
1399
|
Tuesday, November 22, 2016, 11:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#35 | Electrical Check |
Electrical check of TM#2 with the SiC#35 post beam run. See attached PDF for details. |
Attachment 1: TM2_elechk_SiC35_postbeam.PDF
|
|
|
1398
|
Tuesday, November 22, 2016, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#35 | module moved |
TM#2 with the old SiC #35 has been moved from ITW to the south hot cell. |
|
1397
|
Tuesday, November 15, 2016, 07:53 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Target Hall schedule for beam schedule 131(Sep-Dec, 2016) |
Update TH schedules . See attachments |
Attachment 1: Target_Hall_shedule_131_Sep_to_Dec.pdf
|
|
Attachment 2: Target_Hall_shedule_131_Sep_to_Dec.mpp
|
Attachment 3: Target_Hall_shedule_131__Sep_to_Dec_2016.pdf
|
|
|
1396
|
Tuesday, November 08, 2016, 14:45 |
David Wang | ITE | Maintenance | TM4 | | TM4 has been moved to ITE and connected there. |
All ITE and TM4 turbo pumps are started. The east station pumping down is good so far. |
|
1395
|
Tuesday, November 08, 2016, 14:04 |
Isaac Earle | North Hot-Cell | Development | | | Interference check with TCS turbo pump and proposed NHC duct routing |
David Wang and I accessed the NHC today to check if the proposed duct routing (IRH1618) will interfere with servicing or replacement of the TCS turbo pump. A piece of plywood was placed in the future position of the NHC/TCS partition wall (IRH1609), and a ducting elbow was placed at the approximate position of the nearest elbow to the turbo pump.
David concluded that the ducting in the proposed location will not have any significant effect on replacement of the turbo pump, and he does not expect replacement will be difficult to perform after installation of the wall and NHC ducting. Standing at floor level towards the east side of the TCS space and reaching upwards seemed to be the best way to reach the turbo pump flange bolts. It was also noted that there was sufficient room in the TCS space for two workers to be in the area.
|
|
1394
|
Tuesday, November 08, 2016, 10:23 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#50 | module moved |
TM#4 with Ta#50 has been moved to the east target station. |
|
1393
|
Tuesday, November 08, 2016, 07:47 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS water and vacuum pumps are switched off |
TCS is vented. TM4 is disconnected and TCS. |
|
1392
|
Monday, November 07, 2016, 10:35 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#34 | Spent Target move |
Spent SiC#34 was moved on the 3rd of November and placed in the spent target vault. See attached pdf for details. |
Attachment 1: Vault_Storage_November_3_2016.pdf
|
|
|
1391
|
Thursday, November 03, 2016, 09:01 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS water system has been started for TM4. |
The system works fine. All water signals to TM4 at TCS are normal. HV cover is installed on to TM4 at TCS. |
|
1390
|
Thursday, November 03, 2016, 08:57 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Helium pressure test on TM4 HS line at TCS |
70 psi helium ,2minutes to TM4 HS line. LD base leak rate 0.0xE-9 atm.cc/sec. No leak. |
|
1389
|
Wednesday, November 02, 2016, 13:41 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been connected at TCS. |
All turbo-pumps are started. The pumping down is good so far. |