ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1226   Tuesday, May 10, 2016, 13:54 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on window line and HS line.Chad and I leak checked the TM2 HS and
window lines after new target installation. 
The window line was very easy pumped down
  
  1227   Tuesday, May 10, 2016, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#48Electrical CheckElectrical check of TM#2 with Ta#48 attached.
See the attached PDF for details.
 TM2_elec_chk_Ta48_SHC.PDF 
  1228   Wednesday, May 11, 2016, 09:44 Travis CaveConditioning StationStandard OperationTM2Ta#48module movedTM#2 with Ta#48 has been moved from the
south hot cell to the conditioning station.
  
  1229   Wednesday, May 11, 2016, 13:15 David WangConditioning StationMaintenanceTM2 TCS tank top flange seal is changed this morningI changed TCS tank top flange seal(o-ring
42.00"ID X 0.275" DIA) this morning
before TM2 was moved to TCS.
  
  1230   Wednesday, May 11, 2016, 13:16 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.TM2 and TCS vacuum system has been connected.
I started all turbo pumps. Everything is
good so far.
  
  1231   Friday, May 13, 2016, 10:08 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 HS and window line at CS with new Lp Ta targetThese two lines are passed helium pressure
test this morning. The LD base leak rate
0.0 X E-9 atm.cc/sec. The base pressure 0.0
  
  1232   Friday, May 13, 2016, 10:12 David WangConditioning StationStandard OperationTM2 TM2 water lines, heaters, EE, and EL are connected at TCS.The HV  cover is installed on to TM2
after the connections. The HV key is returned
back to B2 level. The TCS Faraday cage is
  
  1235   Monday, May 16, 2016, 13:26 Anders MjosConditioning StationStandard OperationTM2Ta#48Conditioning Ta#48 Monday, May 16, 2016, 13:20: BIAS/EL/EE
30 / 15 / 1.5 kV
Monday, May 16, 2016, 13:20: Ramping
 Ta#48.docx 
  1240   Friday, May 20, 2016, 08:13 David WangConditioning StationStandard OperationTM2Ta#48I switched off TCS and TM2 water systemDisconnected  TM2 at TCS(vacuum system
still on). Purged all TM2 water lines for
helium pressure test.
  
  1241   Friday, May 20, 2016, 10:38 David WangConditioning StationStandard OperationTM2Ta#48Helium pressure test on TM2 with new Lp Ta targetLD base LR: 0.0 X E-9. Base pressure:0.0
X E-4. 70 psi helium. 5 minutes each circuit.
  
  1242   Tuesday, May 24, 2016, 10:39 David WangConditioning StationStandard OperationTM2Ta#48TM2 and TCS turbo-pumps have been switched off this morning.The TCS and TM2 are still under vacuum
without venting
  
  1243   Tuesday, May 24, 2016, 10:42 David WangConditioning StationStandard OperationTM2 Target Hall schedule for beam schedule 130 (Apr- Sep)Weekly update the TH schedules. See attachments
1, 2,3.
 Target_Hall_shedule_130_Apr_to_Sep_2016.xlsxTarget_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf 
  1245   Wednesday, May 25, 2016, 10:57 Travis CaveITWStandard OperationTM2Ta#48module movedTM#2 with Ta#48 has been moved from conditioning
station to the west target station.
  
  1246   Wednesday, May 25, 2016, 14:08 David WangITWStandard OperationTM2Ta#48TM2 has been connected in ITWTM2 has been connected in ITW by Dan.M
and David.W. All turbo-pumps have been started.
Everything is good so fine.
  
  1271   Wednesday, July 06, 2016, 07:03 David WangITWStandard OperationTM2 TM2 was connected in ITW.TM2 was disconnected in ITW and moved to
SHC.
  
  1273   Wednesday, July 06, 2016, 09:16 chad fisherSouth Hot-CellStandard OperationTM2SiC#33Ta#48 removed SiC#33 installedTa#48 has been removed from TM2 and SiC#33
installed.
  
  1274   Wednesday, July 06, 2016, 09:59 Travis CaveSouth Hot-CellStandard OperationTM2Ta#48 and SiC#33Electrical CheckElectrical check done on TM#2 with Ta#48,
no target and SiC#33 the short on the coils
to 60kV is still present it is on the R-U
 TM2_elechk_Ta48_SHC_postbeam.PDFTM2_elechk_SiC33_SHC.PDFTM2_elechk_notgt_SHC.PDF 
  1275   Wednesday, July 06, 2016, 13:38 Travis CaveConditioning StationStandard OperationTM2SiC#33module movedTM#2 with SiC#33 has been moved from the
south hot cell to the conditioning station.
  
  1276   Wednesday, July 06, 2016, 14:25 David WangConditioning StationStandard OperationTM2 TCS and TM2 turbo-pumps have been started.The TCS and TM2 are pumping down.   
  1277   Wednesday, July 06, 2016, 15:23 Anders MjosConditioning StationStandard OperationTM2SiC#33Conditioning SiC#33 Wednesday, July 06, 2016, 15:23:
RGA on. IGs on

Friday, July 08, 2016, 17:07:
 SiC#33.docxTCS-2016-07-06-SiC#33.rga 