  1461   Friday, March 24, 2017, 11:12 Keith C NgSpent Target VaultStandard Operation  2A window transfer

Transfered the 2A window from the ISAC Storage Vault to the Cyclotron Vault Tunnel Storage area. RPG storage form attached.

Attachment 1: 2017mar24_vault_tunnel_storage_form(1).pdf
2017mar24_vault_tunnel_storage_form(1).pdf
  1460   Thursday, March 23, 2017, 11:42 David WangConditioning StationMaintenanceTM4 TM4 Sevice cap rust are cleaned out.

TM4 service cap rust are cleaned out at TCS. All top surface of TM4 are wiped and cleaned . The module looks good now. see attachments

Attachment 1: TM4_clean_up_at_TCS_006.JPG
TM4_clean_up_at_TCS_006.JPG
Attachment 2: TM4_clean_up_at_TCS_007.JPG
TM4_clean_up_at_TCS_007.JPG
Attachment 3: TM4_clean_up_at_TCS_002.JPG
TM4_clean_up_at_TCS_002.JPG
Attachment 4: TM4_clean_up_at_TCS_008.JPG
TM4_clean_up_at_TCS_008.JPG
Attachment 5: TM4_clean_up_at_TCS_005.JPG
TM4_clean_up_at_TCS_005.JPG
  1459   Thursday, March 23, 2017, 11:22 Grant MinorCraneMaintenance  Target Hall crane 20 ton hoist noise / smell - inspection by Gordon Crane & Hoist

Strange noise and a burning brake type smell was observed yesterday by David and Anders when running the main 20 ton hoist locally.  A service call was arranged today with Gordon Crane.  No major issues were found.  A more detailed summary is in the attached e-mail correspondence.  Gordon Crane will issue a formal report, but they recommend replacing both sets of brake disks and brake calipers. - Grant

Attachment 1: Target_Hall_crane_main_hoist_problem_-_A_Mjos_-_22_Mar_2017.pdf
Target_Hall_crane_main_hoist_problem_-_A_Mjos_-_22_Mar_2017.pdf
Attachment 2: Update_-_Target_Hall_20T_Hoist_Inspection_-_G_Minor_-_23_Mar_2017.pdf
Update_-_Target_Hall_20T_Hoist_Inspection_-_G_Minor_-_23_Mar_2017.pdf Update_-_Target_Hall_20T_Hoist_Inspection_-_G_Minor_-_23_Mar_2017.pdf Update_-_Target_Hall_20T_Hoist_Inspection_-_G_Minor_-_23_Mar_2017.pdf
Attachment 3: Re__Update__Target_Hall_20T_Hoist_Inspection_-_David_Wang_-_23_mar_2017.pdf
Re__Update__Target_Hall_20T_Hoist_Inspection_-_David_Wang_-_23_mar_2017.pdf Re__Update__Target_Hall_20T_Hoist_Inspection_-_David_Wang_-_23_mar_2017.pdf Re__Update__Target_Hall_20T_Hoist_Inspection_-_David_Wang_-_23_mar_2017.pdf Re__Update__Target_Hall_20T_Hoist_Inspection_-_David_Wang_-_23_mar_2017.pdf
  1458   Thursday, March 23, 2017, 09:30 Travis CaveSouth Hot-CellStandard OperationTM2test targetElectrical Check

Electrical check of the Ta test target on TM#2

Attachment 1: TM2_Ta_Dummytgt_Preandpost.PDF
TM2_Ta_Dummytgt_Preandpost.PDF TM2_Ta_Dummytgt_Preandpost.PDF
  1457   Wednesday, March 22, 2017, 14:05 Travis CaveSouth Hot-CellStandard OperationTM2test targetmodule moved

TM#2 has been moved from the east target station to the south hot cell.

  1456   Tuesday, March 21, 2017, 11:59 David WangConditioning StationRepairTM4 Rust inpsection on TM4 service cap inside surface and shielding plug surface.

Yasmine and I did a rust inpsection on TM4 service cap inide surface and shielding plug surface. No rust has been found. Also, all steel bolts on this surface look fine. The inside of silo held this module are rust free as well.  See attachments

Attachment 1: TM4_rust_inspection_003.JPG
TM4_rust_inspection_003.JPG
Attachment 2: TM4_rust_inspection_004.JPG
TM4_rust_inspection_004.JPG
Attachment 3: TM4_rust_inspection_005.JPG
TM4_rust_inspection_005.JPG
Attachment 4: TM4_rust_inspection_008.JPG
TM4_rust_inspection_008.JPG
Attachment 5: TM4_rust_inspection_009.JPG
TM4_rust_inspection_009.JPG
Attachment 6: TM4_rust_inspection_011.JPG
TM4_rust_inspection_011.JPG
Attachment 7: TM4_rust_inspection_019.JPG
TM4_rust_inspection_019.JPG
Attachment 8: TM4_rust_inspection_021.JPG
TM4_rust_inspection_021.JPG
Attachment 9: TM4_rust_inspection_022.JPG
TM4_rust_inspection_022.JPG
Attachment 10: TM4_rust_inspection_023.JPG
TM4_rust_inspection_023.JPG
Attachment 11: TM4_rust_inspection_024.JPG
TM4_rust_inspection_024.JPG
  1455   Tuesday, March 21, 2017, 10:06 Travis CaveConditioning StationStandard OperationTM4no targetmodule moved

TM#4 has been moved from the SW Silo to the conditioning station.

  1454   Tuesday, March 21, 2017, 10:05 Travis CaveSpent Target VaultStandard Operation  Spent target assay.

All target in the ISAC spent target vault have been either assayed or had their fields measured or both.

Attachment 1: Vault_Storage_March_20_2017.pdf
Vault_Storage_March_20_2017.pdf Vault_Storage_March_20_2017.pdf Vault_Storage_March_20_2017.pdf Vault_Storage_March_20_2017.pdf
  1453   Thursday, March 16, 2017, 12:24 chad fisherSouth Hot-CellMaintenance  West 'Z' motion cable replacement

The west 'Z' motion cable on the east manipulator has successfully been replaced. The job took slightly less than an hour (including inspection of the scissor table hoses) and I received 0.075mSv. Scissor table hoses appear to be fine and also didn't "shed" or flake at all when checked by hand.

  1452   Thursday, March 16, 2017, 10:32 David WangSpent Target VaultRepairTM4 TM4 and its silo rust photos

I watched rust on TM4 and its silo. Most of rust are on est side of module and silo. See attachments

Attachment 1: humidity_in_TH_and_rusty_TM4_006.JPG
humidity_in_TH_and_rusty_TM4_006.JPG
Attachment 2: humidity_in_TH_and_rusty_TM4_007.JPG
humidity_in_TH_and_rusty_TM4_007.JPG
Attachment 3: humidity_in_TH_and_rusty_TM4_008.JPG
humidity_in_TH_and_rusty_TM4_008.JPG
Attachment 4: humidity_in_TH_and_rusty_TM4_009.JPG
humidity_in_TH_and_rusty_TM4_009.JPG
Attachment 5: humidity_in_TH_and_rusty_TM4_010.JPG
humidity_in_TH_and_rusty_TM4_010.JPG
Attachment 6: humidity_in_TH_and_rusty_TM4_011.JPG
humidity_in_TH_and_rusty_TM4_011.JPG
Attachment 7: humidity_in_TH_and_rusty_TM4_012.JPG
humidity_in_TH_and_rusty_TM4_012.JPG
Attachment 8: humidity_in_TH_and_rusty_TM4_013.JPG
humidity_in_TH_and_rusty_TM4_013.JPG
Attachment 9: humidity_in_TH_and_rusty_TM4_014.JPG
humidity_in_TH_and_rusty_TM4_014.JPG
Attachment 10: humidity_in_TH_and_rusty_TM4_015.JPG
humidity_in_TH_and_rusty_TM4_015.JPG
Attachment 11: humidity_in_TH_and_rusty_TM4_016.JPG
humidity_in_TH_and_rusty_TM4_016.JPG
Attachment 12: humidity_in_TH_and_rusty_TM4_017.JPG
humidity_in_TH_and_rusty_TM4_017.JPG
Attachment 13: humidity_in_TH_and_rusty_TM4_018.JPG
humidity_in_TH_and_rusty_TM4_018.JPG
  1451   Wednesday, March 15, 2017, 07:45 chad fisherSouth Hot-CellMaintenance  South Hot Cell Fields

I have moved the suspected "hot" items in the hot cell and placed them under some lead bricks. I have re-measured the fields and it has been reducded to 90 uSv\h at the manipulator repair area and 110 uSv/h at the previous 1.82 mSv\h area.

  1450   Tuesday, March 14, 2017, 11:46 chad fisherSouth Hot-CellMaintenance  'Z' motion cable dry run

Did a dry run with the latest procedure with Dan Mcdonald. Elapsed time was approximately 30 min.

  1449   Tuesday, March 14, 2017, 07:34 chad fisherSouth Hot-CellMaintenance  Hot Cell Fields

I have re-measured the fields in the hot cell. Fields at shield door Al cover are 101 uSv\h, in cell at the east manipulator are 245 uSv\h, and the largest field is 1.84 mSv\h...this appears to be the high current fasteners removed from the last target.

  1448   Friday, March 10, 2017, 09:19 chad fisherSouth Hot-CellStandard Operation  South Hot Cell Field Measurements

The fields in the hot cell have been measured by means of a pole monitor through the tool port. Field was measured to be 25 uSv/h.

  1447   Wednesday, March 08, 2017, 14:09 David WangITEMaintenanceTM2 ITE IG1S increasing.

By retrieving data further, It has been found no directly relationship between IG1S surging and dump plug water opening. Vacuum surging is 10minutes ahead dump water supply to circuit. SEE attachment 1. Also, The ITE IG1S start to behavior unusual in middle of Feburary. See attachment 2. Today,  ITE IG1S is still slowly climbing up. I decide to leak check ITE vacuum vessel. Before  leak check, for more information and trouble shooting. I closed water supply to ITE to see if vacuum has response on it. I will return water supply to ITE  tomorrow morning.

Water supply to ITE is returned this afternoon at 2: 10 PM.  Everything works fine so far

I leak checked ITE secondary vessel vacuum. A leak have been found in March 09th noon which is located between entrance module and TM2 top tank flange o-ring seal( on tank flange). It could not be confirm on which side of the o-ring the leak is from.

During last night, ITE IG1S reading went back to normal low E-7 range and stays in this range now. So I leak checked same area again this morning. The leak disappeared now. The o-ring works sometime , but not all the time. The plan for this issue: Change ITE target module side o-ring when TM2 is move out., and watch on the ITE IG1s when TM4 is moved back to ITE and pumped down.

Attachment 1: ITE_IGIS_surge.png
ITE_IGIS_surge.png
Attachment 2: ITE_IG1S_and_PNG4.png
ITE_IG1S_and_PNG4.png
Attachment 3: ITE_IG1S_back_to_normal_overnight.png
ITE_IG1S_back_to_normal_overnight.png
Attachment 4: ITE_IG1S_behavior_from_Feb_08th_to_Mar_10th.png
ITE_IG1S_behavior_from_Feb_08th_to_Mar_10th.png
  1446   Tuesday, March 07, 2017, 14:41 David WangITEMaintenance  ITE dump plug water circuit is closed for ITE IG1S small surge.

It is closed @ 2:35PM by closing supply side valve first , the return side valve of ITE dump plug .

Opened ITE dump plug circuit valves @4:28PM. ITE IG1S still at 1XE-6. No change before and after of circuit closing and reopeneing.

  1445   Tuesday, March 07, 2017, 09:25 David WangITWRepair  ITW HALCW 2" return line ball valve seals replacement.

Leaking seals on ITW HALCW 2" return line ball valve have been replaced. 8 liter waters are drained out for this job. Water are drained into a thick plastic bag.  The bag is tie strapped , labeled, and put into a yellow garbage bin in MAA. Water sample is given to RPG. After analyzing, RPG will give instruction on how to deal with it. Since we just refilled NALCW to system before this job, the active level on sample is very low. We may dump them into active sump.  After seals change, The system is refilled . I started pump and set everything back to normal configuration. NO leak has been found on new seals. The HALCW system is operating good so far.

  1444   Monday, March 06, 2017, 08:01 David WangCoolingRepair  HALCW resin tank replacement.

HALCW resin tank has been replaced. The old tank is stored in middle-west silo now. The field on old resin tank bottom is about 3.5 msv/ hr(on contact). By shielding it into silo and putting two lead blankets on the top cover of the silo,The general field 1 feet above this silo is 25usv/hr. And, The field around the silo area are less affected. This old tank will stay there as long as possible.  For the new resin tank during preparation, It was found that on return line side, the 1.25" pipe thread plug with return line tube  was very difficult to be installed onto the female thread adapter which is welded onto to tank body. It was jammed in half way of threading onto tank at manufacturer. This plug was removed out first and inspected. The first and second male threads were galled.  Maico repaired the thread on a lathe. The female thread on the tank was tapped. A tight spot was found during the tap. After that, the return line plug could be installed onto the tank properly.  The new tank was installed into the vessel and connected back to HALCW system. Water are refilled into new tank. During refill air were trapped into the system. This caused  pump restarting problem. By Several times of starting up the pump, stopping the pump and venting,  Most air were breathed out of  system. Finally,The system was restarted by supply water to ITW( without module) only. ITE and resin can circuits were brought back to system after that without problem.

 Before removing the old tank, We drained water out of old tank to decay tank. Since the resin tank is largely filled with  resin, and water are soaked into resin, we only can drain out less than 10 liters water out of tank. Also, The drain caused some part of return line on pumps have to been drained. This is the main reason air was trapped in system during the new resin tank water refilling. For the future replacement, we should not drain water in old tank. It does not worth to do it. 

Attach TH HALCW resin tank replacement procedure here.

2022-02-17 reload replacement procedure and draining schematic.

Attachment 1: new_resin_tank_installation_004.JPG
new_resin_tank_installation_004.JPG
Attachment 2: new_resin_tank_installation_005.JPG
new_resin_tank_installation_005.JPG
Attachment 3: new_resin_tank_installation_006.JPG
new_resin_tank_installation_006.JPG
Attachment 4: new_resin_tank_installation_008.JPG
new_resin_tank_installation_008.JPG
Attachment 5: new_resin_tank_installation_010.JPG
new_resin_tank_installation_010.JPG
Attachment 6: new_resin_tank_installation_012.JPG
new_resin_tank_installation_012.JPG
Attachment 7: new_resin_tank_installation_013.JPG
new_resin_tank_installation_013.JPG
Attachment 8: HALCW_Resin_Tank_Replacement_Procedure..docx
Attachment 9: HALCW_Resin_Tank_Replacement_Procedure..pdf
HALCW_Resin_Tank_Replacement_Procedure..pdf HALCW_Resin_Tank_Replacement_Procedure..pdf HALCW_Resin_Tank_Replacement_Procedure..pdf
Attachment 10: HALCW_resin_can_replacement__procedure..pdf
HALCW_resin_can_replacement__procedure..pdf
Attachment 11: resin_tank_draining.pdf
resin_tank_draining.pdf
  1443   Thursday, March 02, 2017, 15:02 Isaac EarleNorth Hot-CellDevelopment  NHC roughing filter installed

 The roughing filter assembly (RFM0001D) has been installed at the ventilation exhaust hole on the NHC partition wall.  The filter used is Model # 332-528-002 supplied by BGE Service & Supply Ltd (see PO # TR123998).  Installation and removal of the filter using the manipulators will be tested after they have been installed.

 

IMG_8014.JPG

 

IMG_8018.JPG

 

IMG_8019.JPG

  1442   Tuesday, February 28, 2017, 17:51 Isaac EarleNorth Hot-CellDevelopment  NHC flanged ducting connection sealed

 The North Hot Cell ducting (IRH1617) has been sealed with a bead of Sikaflex 1a polyurethane construction sealant where the flanged connection bolts to the NHC/TCS partition wall.  When this sealant shows signs of aging it may be cut away and re-applied without unbolting the flange.

 

IMG_8012.JPG