1235
|
Monday, May 16, 2016, 13:26 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | Ta#48 | Conditioning Ta#48 |
Monday, May 16, 2016, 13:20: BIAS/EL/EE 30 / 15 / 1.5 kV
Monday, May 16, 2016, 13:20: Ramping TGHT / TBHT to 580 / 220 A at 2 A/min. IG2 1E-6 / 2E-6 T
Monday, May 16, 2016, 15:45: Paused ramping.
Monday, May 16, 2016, 15:00: Resumed ramping
Monday, May 16, 2016, 16:23: Stopped ramping for the day. TGHT / TBHT at 310 / 220 A. FC at 6.2E-7 A
Tuesday, May 17, 2016, 08:00: Continue ramping.
Wednesday, May 18, 2016, 09:40: BIAS / EL / EE to 35 / 17.5 1.7 kV
Thursday, May 19, 2016, 04:07: BIAS dropped to 0. Likely caused by a power bump.
Thursday, May 19, 2016, 08:05: BIAS returned to 35 kV. Increased EL to 22 kV to maximize FC current.
Thursday, May 19, 2016, 08:11: TBHT to 230 A
Thursday, May 19, 2016, 08:22: Ramping down TGHT / TBHT
Thursday, May 19, 2016, 10:41: BIAS / EL / EE off
Thursday, May 19, 2016, 14:00: TGHT / TBHT off
Friday, May 20, 2016, 14:39: RGA off. |
Attachment 1: Ta#48.docx
|
1240
|
Friday, May 20, 2016, 08:13 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#48 | I switched off TCS and TM2 water system |
Disconnected TM2 at TCS(vacuum system still on). Purged all TM2 water lines for helium pressure test. |
1241
|
Friday, May 20, 2016, 10:38 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#48 | Helium pressure test on TM2 with new Lp Ta target |
LD base LR: 0.0 X E-9. Base pressure:0.0 X E-4. 70 psi helium. 5 minutes each circuit.
window |
0.0X E-9 |
|
HS |
0.0X E-9 |
|
EE |
0.0X E-9 |
|
Ta+ |
0.0X E-9 |
|
Ta- |
0.0X E-9 |
|
coil1 R-U |
0.0X E-9 |
|
Coil2 P-Q |
5.0X E-9 |
|
Tube- |
5.1X E-9 |
|
Tube+ |
1.1X E-8 |
|
MSP |
3.5X E-9 |
|
The bigger leak found on MSP before was gone. Leak rate are smaller on all circuits comparing to before.
The leak rate on 1 hour total lines test at 70 psi is better also which is 6.6 XE-8 atm.cc/sec this time. |
1242
|
Tuesday, May 24, 2016, 10:39 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#48 | TM2 and TCS turbo-pumps have been switched off this morning. |
The TCS and TM2 are still under vacuum without venting |
1243
|
Tuesday, May 24, 2016, 10:42 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall schedule for beam schedule 130 (Apr- Sep) |
Weekly update the TH schedules. See attachments 1, 2,3. |
Attachment 1: Target_Hall_shedule_130_Apr_to_Sep_2016.xlsx
|
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep.mpp
|
Attachment 3: Target_Hall_shedule_130_Apr_to_Sep.pdf
|
|
1245
|
Wednesday, May 25, 2016, 10:57 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#48 | module moved |
TM#2 with Ta#48 has been moved from conditioning station to the west target station. |
1246
|
Wednesday, May 25, 2016, 14:08 |
David Wang | ITW | Standard Operation | TM2 | Ta#48 | TM2 has been connected in ITW |
TM2 has been connected in ITW by Dan.M and David.W. All turbo-pumps have been started. Everything is good so fine. |
1271
|
Wednesday, July 06, 2016, 07:03 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was connected in ITW. |
TM2 was disconnected in ITW and moved to SHC. |
1273
|
Wednesday, July 06, 2016, 09:16 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#33 | Ta#48 removed SiC#33 installed |
Ta#48 has been removed from TM2 and SiC#33 installed. |
1274
|
Wednesday, July 06, 2016, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#48 and SiC#33 | Electrical Check |
Electrical check done on TM#2 with Ta#48, no target and SiC#33 the short on the coils to 60kV is still present it is on the R-U coil line. See attached PDFs for details. |
Attachment 1: TM2_elechk_Ta48_SHC_postbeam.PDF
|
|
Attachment 2: TM2_elechk_SiC33_SHC.PDF
|
|
Attachment 3: TM2_elechk_notgt_SHC.PDF
|
|
1275
|
Wednesday, July 06, 2016, 13:38 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | SiC#33 | module moved |
TM#2 with SiC#33 has been moved from the south hot cell to the conditioning station. |
1276
|
Wednesday, July 06, 2016, 14:25 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS and TM2 turbo-pumps have been started. |
The TCS and TM2 are pumping down. |
1277
|
Wednesday, July 06, 2016, 15:23 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | SiC#33 | Conditioning SiC#33 |
Wednesday, July 06, 2016, 15:23: RGA on. IGs on
Friday, July 08, 2016, 17:07: Stopped cooling system due to a problem with the chiller. Will continue with HV conditioning on Monday.
Monday, July 11, 2016, 08:08: Cooling system started. Operating CP1 manually to control temperature
Monday, July 11, 2016, 09:38: BIAS / EL / EE to 10 / 5 / 1 kV
Monday, July 11, 2016, 09:41: BIAS / EL / EE to 20 / 10 / 1.5 kV
Monday, July 11, 2016, 09:47: BIAS / EL / EE to 30 / 15 / 1.5 kV
Monday, July 11, 2016, 10:01: BIAS / EL / EE to 40 / 20 / 2.0 kV - one spark at 40 kV
Monday, July 11, 2016, 10:38: BIAS / EL / EE to 45 / 22.5 / 2.0 kV - conditioning from 40 kV
Monday, July 11, 2016, 10:40: BIAS / EL / EE to 45 / 22.5 / 2.3 kV
Monday, July 11, 2016, 12:21 : No sparks for the last 60 min.
Monday, July 11, 2016, 12:21: BIAS / EL / EE off to investigate TGHT / TBHT PS problem (power surge this morning)
Monday, July 11, 2016, 13:07: Power cycled TGHT / TBHT PS. Alarm cleared. Tested both to 10 A |
Attachment 1: SiC#33.docx
|
Attachment 2: TCS-2016-07-06-SiC#33.rga
|
1278
|
Friday, July 08, 2016, 08:20 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been connected at TCS |
I connected TM2 to TCS and started water system. |
1281
|
Tuesday, July 12, 2016, 09:59 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#33 | module moved |
TM#2 with SiC#33 has been moved from the conditioning station to the west target station. |
1282
|
Tuesday, July 12, 2016, 12:40 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected in ITW |
All turbo-pumps are started. Everything is good so far. |
1285
|
Thursday, July 14, 2016, 10:54 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) |
Update TH schedule 130 according to mini-shut down change.See attachment 1,2,3,4 |
Attachment 1: Target_Hall_shedule_130_Apr_to_Sep.pdf
|
|
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep.mpp
|
Attachment 3: Target_Hall_shedule_130_Apr_to_Sep_2016.pdf
|
|
Attachment 4: Target_Hall_shedule_129_Sep_to_Dec.xlsx
|
1327
|
Tuesday, August 23, 2016, 10:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#33 | module moved |
TM#3 with SiC#33 has been moved from the west station to the south hot cell. |
1328
|
Tuesday, August 23, 2016, 13:31 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#33 | SiC#33 Removed |
SiC#33 has been removed from TM2. |
1329
|
Wednesday, August 24, 2016, 09:17 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | | Ta#49 |
Ta#49 has been installed on TM2 and tested. All high current fasteners torqued to 130 in lbs. |