  590   Monday, February 03, 2014, 14:45 Travis CaveSpent Target VaultStandard Operation  Spent targets to mini storage and the F-308s to the Target HallTargets NiO#1(101), Nb#5(85), TaC#1(92),
and ZrC#5(81) have been moved from the storage
vault and placed in the mini storage. The
 Vault_Storage_February_3_2014.pdfMini_Vault_Storage_February_3_2014.pdf 
  69   Thursday, January 12, 2012, 08:43 Travis CaveSpent Target VaultStandard Operation  Spent targets to F-308sAll targets in the mini storage have been
moved to F-308s and those flasks have been
moved over to rad waste. The transfer of
  
  1910   Monday, April 29, 2019, 09:32 Travis CaveSpent Target VaultStandard Operation SiC#31,32 and UC#19,20,21Spent targets moved to mini vault. The following targets have been moved
from the spent target vault to the mini vault:
#127 - SiC#31 (front)
  
  1152   Wednesday, January 13, 2016, 09:57 Travis CaveSpent Target VaultStandard Operation Ta#35, Ta#39, SiC#27, UC#12, ThO#1Spent targets moved to mini storage.Five spent targets have been moved from
the Spent Target Vault to Mini Storage in
preparation for transfer to F-308s in February.
  
  802   Wednesday, November 26, 2014, 11:11 Travis CaveSpent Target VaultStandard Operation Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29Spent targets moved to mini storageThe following targets have been moved to
the mini storage from the target storage
vault:
  
  811   Thursday, December 04, 2014, 09:57 Travis CaveSpent Target VaultStandard Operation  Spent target placed in F-308.Spent targets in the mini storage were
placed into the F-308s yesterday, all F-308
have been removed from the the target hall
  
  975   Thursday, July 02, 2015, 11:51 Travis CaveSpent Target VaultStandard Operation UC#12Spent target movedUC#12 has been moved from the south hot
cell and placed into storage. It is in pail
#125 and in spot 1C of the vault it had a
 Vault_Storage_July_2_2015.pdf 
  1027   Thursday, July 30, 2015, 14:05 Travis CaveSpent Target VaultStandard Operation SiC#31Spent target movedSiC#31 has been moved to the spent target
vault. It is in pail #127 and placed in spot
3C of the vault is was 489mSv/hr when removed
 Vault_Storage_July_30_2015.pdf 
  1114   Friday, October 23, 2015, 11:40 Travis CaveSpent Target VaultStandard Operation ZrC #7Spent target movedThe spent ZrC#7 target has been moved from
the south hot cell to the spent target vault.
The target was placed in pail #129 and then
 Vault_Storage_October_23_2015.pdf 
  2734   Thursday, December 05, 2024, 12:00 Adam NewsomeSpent Target VaultStandard Operation Ta#68Spent target move - Ta#68 in Pail 300Ta#68 spent target was moved in Pail 300
to storage vault location 5A. The dose rate
measured at the South Hot Cell was 429 mSv/h
 Storage_Vault_Contents_2024-12-05.pdf 
  13   Monday, July 25, 2011, 14:49 Travis CaveSpent Target VaultStandard Operation Ta#35Spent target moveTa#35, in pail #88, has been place into
spent target storage, in spot 6C. Upon removal
from the South Hot Cell it was 411mSv/hr
  
  27   Wednesday, September 14, 2011, 10:32 Travis CaveSpent Target VaultStandard Operation Ta#37Spent target moveTa#37 has been moved from the south hot
cell into the storage vault. The target is
in pail #89 and in spot 6A in the vault.
  
  31   Thursday, September 29, 2011, 11:11 Travis CaveSpent Target VaultStandard Operation Ta#36Spent target moveThe spent Ta#36 has been moved to the storage
vault. It was placed in pail #90, and placed
into slot 3B, it was 111mSv/hr upon removal
  
  36   Wednesday, October 05, 2011, 09:41 Travis CaveSpent Target VaultStandard Operation UCx#2Spent target moveThe spent UCx #2 target has been moved
into storage. It was placed in tray 5A and
is in Pail #91, it was 8.91mSv/hr upon removal
  
  54   Thursday, November 17, 2011, 11:51 Travis CaveSpent Target VaultStandard Operation TaC#1Spent target moveTaC#1 was moved from the south hot cell
to the storage vault. It was placed in pail#92
and put in vault slot 7B. It was 239mSv/hr
  
  103   Wednesday, May 16, 2012, 10:35 Travis CaveSpent Target VaultStandard Operation SiC#26Spent target moveSiC #26 was moved from the south hot cell
into storage today. The target was is in
pail # 94 and was placed in slot 1B in the
 Vault_Storage_May_16_2012.pdf 
  124   Monday, June 11, 2012, 10:52 Travis CaveSpent Target VaultStandard Operation Nb#6Spent target moveThe Nb#6 target has been moved from the
south hot cell into storage. It was place
in pail #95 and is in slot 5C of the vault.
 Vault_Storage_June_11_2012.pdf 
  142   Friday, July 06, 2012, 11:34 Travis CaveSpent Target VaultStandard Operation SiC#27Spent target moveSiC#27 has been moved from the south hot
cell to the spent target vault. Target was
placed in pail #96, placed in slot 3A, the
 Vault_Storage_July_6_2012.pdf 
  158   Thursday, August 02, 2012, 11:48 Travis CaveSpent Target VaultStandard Operation Ta#38Spent target moveTa#38 was moved from the south Hot Cell
to the Spent Target Vault. Target is in pail
#97, and was placed into tray 6 slot B of
 Vault_Storage_August_2_2012.pdf 
  173   Friday, September 07, 2012, 09:47 Travis CaveSpent Target VaultStandard Operation UO#3Spent target moveThe spent UO#3 was moved from the south
hot cell to the storage vault. It was in
pail 98 and placed in spot 1A of the vault,
 Vault_Storage_September_6_2012.pdf 