ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
1554
|
Thursday, June 08, 2017, 08:35 |
David Wang | Conditioning Station | Development | TM2 | | TM2 gas line reconfiguration on the module top. |
Reconfigured TM2 gas line on the module top. It matches with the febiad gas line we are using on service tray now. Facing the module, both of them should be that right side line of two SST lines on feed-through. The gas line on TM2 was leak checked with a blind cap installed on service tray side and LD connected on module top this Tuesday. It is leak free with helium spray on the top of module and service tray. |
Attachment 1: TM2_gas_line_on_the_top_002.JPG
|
|
1553
|
Thursday, June 08, 2017, 07:37 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Helium pressure test on TM2 water llines at TCS. |
The helium pressure test on HS line is done at TCS this morning. I got the same result as last time when we helium pressure it it with first target in April. The leak rate on this line is 1.8 XE-7atm.cc/sec. So, we know this leak is mostly on the line, but not on the VCR joints connecting the target. See attachment for last time(April) checking e-log. The leak could be from water block which is same as other lines. I do not think this leak rate will affect the operation.
The attachment can not be opened for some reasons. Please check TM2 leak check 2017-03-13 e- log for last time test result and comment. |
Attachment 1: TM2_helium_pressure_test..png
|
|
1552
|
Wednesday, June 07, 2017, 13:34 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 and TCS vacuum system has been connected. |
I started all turbo pumps. |
1551
|
Wednesday, June 07, 2017, 13:33 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 SiC#36 leakc check and electrical check. |
The results are good. See attachment. |
Attachment 1: TM2_SiC_36#_leak_check_an_delectrical_check..pdf
|
|
1550
|
Tuesday, June 06, 2017, 13:42 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Ta#51 removed SiC#36 installed |
This afternoon Ta#51 was removed from TM2 and SiC#36 installed.
All new fasteners used. High current fasteners torqued to 130 in lbs.
|
1549
|
Wednesday, May 24, 2017, 08:11 |
David Wang | ITW | Standard Operation | TM2 | | TH schedule 132 update weekly |
See attachments. |
Attachment 1: Target_Hall_shedule_132_Apr_to_Sep.mpp
|
Attachment 2: Target_Hall_shedule_132_Apr_to_Sep.pdf
|
|
1548
|
Tuesday, May 23, 2017, 14:10 |
David Wang | ITE | Standard Operation | | | ITE water interlock check is done. |
We do this check once a year now. Rene found a target oven reset issue during the check . He will consult with Friedhelm. The interlock check is good. |
1547
|
Tuesday, May 23, 2017, 13:30 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected in ITE |
Yasmine and I connected TM4 in ITE . All turbo pumps are started. |
1546
|
Tuesday, May 23, 2017, 10:41 |
Travis Cave | ITE | Standard Operation | TM4 | UC#20 | Module move |
TM#4 with UC#20 has been moved from the conditioning station to the east target station. |
1545
|
Friday, May 19, 2017, 13:49 |
David Wang | Conditioning Station | Repair | TM4 | | TM4 TP1 at TCS |
TM4 TP1 is replaced. TCS and TM4 was argon vented before the job.The job took about 30minutes. I started the all turbo pumps after job. All pumps work fine. The TCS vacuum is good. |
1544
|
Friday, May 19, 2017, 12:25 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS and TM4 water flow measurement. |
|
TCS(LPM) |
Freq(HZ) |
TCS+TM4(LPM) |
Freq(HZ) |
Ta |
5.5 |
106 |
3.7 |
68 |
Tu |
5.6 |
107 |
4.3 |
79 |
Coil(RU only) |
5.8 |
112 |
4.6 |
92 |
HS |
7.0 |
13 |
6.6 |
12 |
MSP |
6.4 |
21 |
5.8 |
21 |
EE |
5.6 |
112 |
3.8 |
77 |
Window |
4.5 |
81 |
4.3 |
78 |
|
1543
|
Thursday, May 18, 2017, 11:36 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#20 | Electrical Check |
Electrical check of TM#4 with UC#20 at the conditioning station under vacuum. See attached for details. |
Attachment 1: TM4_UC20_Elec_chk_CS_vac.PDF
|
|
1542
|
Thursday, May 18, 2017, 10:41 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#19 | Spent Target move |
The spent UC#19 target has been moved from the south hot cell into the spent target storage. It was placed in pail #145 and put in tray one spot C. See attached PDF for all vault details. |
Attachment 1: Vault_Storage_May_18_2017.pdf
|
|
1541
|
Thursday, May 18, 2017, 10:08 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 TP1 at TCS |
TM4 TP1 was found making some noise during operation this morning. The current draw was check then. It was 1.8 A which is higher than 1.0A normal range. The pump body temperature was higher by hand feeling. But,1.0 hour later when checking again, everything on the pump goes back to normal. It is still fine so far. I will watch on this pump closely.
2017-05-19,morning. The TM4 TP1 stopped running last night. I tried to start it this morning. But, It can't pass 6KRMP even. I think we have to replace it. E- fault will be issued as well. |
1540
|
Wednesday, May 17, 2017, 08:35 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS turbo pumps was started yesterday |
Anders started TCS turbo-pumps yesterday. The TCS and TM4 pumping down is good so far. I started TCS water pumps this morning for TCS water flow check.
2017-05-17 morning: Stopped the water pumps. The field around the TM4 is high because of spent target in SHC. The water flow measurement will be delayed to this Friday. |
1539
|
Wednesday, May 17, 2017, 08:31 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check on TM4 HS line at SHC |
Chad and I finished leak check on HS line with UCx target installed on it. Base Leak rate:0.0X 10^-9 atm.cc/sec, Base pressure 0.0X 10 ^-4 torr. Sprayed helium to VCR joints. No leak has been found . The line will be pressurized with helium at TCS.
Helium pressure test on TM4 HS line is done at TCS. BLR 0.0XE-9 atm.cc/sec. 70psi helium , 2 minutes. No response. The line is leak free. |
1538
|
Tuesday, May 16, 2017, 14:19 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#20 | module moved |
TM#4 with UC#20 has been moved from the south hot cell to the conditioning station. |
1537
|
Tuesday, May 16, 2017, 14:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#20 | Electrical Check |
TM#4 with UC#20 has had the electrical check done on it at the south hot cell, see attached for details |
Attachment 1: TM4_UC20_Elec_chk_SHC.PDF
|
|
1536
|
Tuesday, May 16, 2017, 13:23 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UC#20 | UC#20 Installed |
UCx#19 has been removed from TM4 and UCx#20 installed.
UCx#19 still had water in it at pressure and sprayed when the VCR was undone. It was quickly re-tightened but not before significant water pooled beside the main Mykroy standoff and table. Contacted Anders would suggested to soak it up with some wipes and continue, which I did.
New target fasteners including high current. High current fasteners torqued to 130 in lbs. |
1535
|
Tuesday, May 16, 2017, 10:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#19 | module moved |
TM#4 with UC#19 has been moved from ITE to the south hot cell. |