1940
|
Wednesday, June 12, 2019, 08:56 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | More TM4 conditioning without source tray | The conditioning station was ramped down
overnight and David ramped it back up this
morning. Currently trying to get it to sit |
|
2296
|
Thursday, January 20, 2022, 08:18 |
David Wang | North Hot-Cell | Standard Operation | TM4 | No target | TM4 was removed from NHC to S_W silo yesterday. | TM4 was removed from NHC to S_W silo yesterday.
The remove is smooth and successful. |
|
2745
|
Thursday, January 09, 2025, 11:46 |
David Wang | Safe Module Parking | Standard Operation | TM4 | No target | SMP is under vacuum for TM4 storage during shut down. | SMP:MP1 is started with SMP BV1 is
opened. SMP is under vacuum for TM4 storage
during shut down. |
|
2750
|
Thursday, January 16, 2025, 14:21 |
David Wang | Conditioning Station | Standard Operation | TM3 | No target | TM3 electrical check at TCS under good vacuum | A
complete TM3 electrical check at TCS under
good vacuum has been done. Pin 14 to 60KV |
|
2755
|
Tuesday, January 28, 2025, 11:47 |
David Wang | Conditioning Station | Standard Operation | TM3 | No target | Tm3 has been moved from TCS to silo. | Tm3 has been moved from TCS to silo.
The move is successful. |
|
350
|
Wednesday, May 15, 2013, 18:12 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No source tray | HV test repeat | After discussion with Friedhelm it
was decided to continue trying to condition
the module today before moving it tomorrow. |
|
398
|
Friday, July 05, 2013, 10:02 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No source tray | TM3 module move to TCS | TM3 has been moved from the south hot cell
to the conditioning station. David and I
completed the move. All went well. |
|
85
|
Monday, April 16, 2012, 16:17 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | No Target | High Voltage Test | A high voltage test was completed
on a target free TM1 in the conditioning
station. Only the turbo pumps on the target |
|
1952
|
Monday, July 22, 2019, 14:51 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | No Target | TM4 Move | TM4 has been moved from the South West
silo to the South Hot Cell. New source tray,
no target. |
|
1957
|
Wednesday, July 31, 2019, 08:57 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | No Target | TM4 Move | TM4 has been moved from the Conditioning
Station to the South Hot Cell. No target.
|
|
339
|
Friday, May 10, 2013, 11:28 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | Roughing Started | Roughing on TM3 was started at 11:26am
today |
|
340
|
Friday, May 10, 2013, 14:05 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | Turbo Pumps On | The turbo pumps are on. TP1 and TP2 once
again timed out and had to be restarted before
they would stay on. |
|
344
|
Wednesday, May 15, 2013, 10:17 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | Preliminary Results from HV testing | Testing on TM3 without a source tray
was completed on 13/05.2013. All items were
tied to common and the water blocks were |
|
348
|
Wednesday, May 15, 2013, 16:51 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | Repeat of HV Test | The HV test completed on Monday was
repeated today over a much longer time period.
By taking longer there was slightly less |
|
354
|
Tuesday, May 21, 2013, 11:52 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | May 16th Long HV conditioning | On May 16th 2013 the module was HV conditioned
all day. As a result the maximum stable voltage
has been increased to about 47kV (~4kV more |
|
404
|
Monday, July 22, 2013, 15:52 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | HV testing update | I have fallen behind on the
HV testing that has been completed on TM3.
Data can be found on docushare in the TM3 |
|
464
|
Wednesday, September 25, 2013, 10:00 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | NiO#2 | module move | TM#3 with NiO#2 has been moved from the
south hot cell to the conditioning station. |
|
465
|
Wednesday, September 25, 2013, 11:08 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | NiO#2 | Electrical check | The module was checked electrically this
morning before the module move. See the attached
PDF for details. |
|
466
|
Wednesday, September 25, 2013, 13:48 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | NiO#2 | Electrical check | Electrical check of TM#3 in the conditioning
station under vacuum see attached PDF for
details. |
|
468
|
Thursday, September 26, 2013, 14:31 |
Bevan Moss | South Hot-Cell | Repair | TM3 | NiO#2 | Activities September 24 - 25 | September 24
After the manipulator repair
Maico installed the NiO#2 onto the target |
|