1585
|
Monday, July 17, 2017, 17:50 |
Aurelia Laxdal | Conditioning Station | Development | TM3 | No target | Conditioning TM3 |
|
|
|
1587
|
Tuesday, July 18, 2017, 16:53 |
Anders Mjos | Conditioning Station | Development | TM3 | No target | Conditioning TM3 | Conditioning continues today with resistors
removed from the HV cable
Tuesday, July 18, 2017, 16:53: BIAS |
|
|
1842
|
Wednesday, December 19, 2018, 14:41 |
Anders Mjos | Conditioning Station | Standard Operation | | No target | Installed Shield Block on TCS | Frank and Anders installed lid on TCS and
started vacuum system yesterday. To run over
the Holidays. Retrieved dose badge from operational |
|
|
1936
|
Monday, June 10, 2019, 08:26 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Ramping voltage on TM4 w/o source tray | TM4 in conditioning station with no source
tray, extraction electrode set to HV bias.
Brought up to 30kV over the weekend by ISAC |
|
|
1938
|
Monday, June 10, 2019, 16:22 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Ramping V on TM4, no HV cover in TH | Ramped down the bias so David could remove
the HV cover and lock out the target hall.
Ramped back up to BIAS / EL = 50kV |
|
|
1939
|
Monday, June 10, 2019, 18:12 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Attempt to push bias > 56kV | Monday, June 10, 2019, 16:59 : TM4 back
up to BIAS / EL = 56.1kV / 29.5kV
Monday, June 10, 2019, 17:14 : After |
|
|
1940
|
Wednesday, June 12, 2019, 08:56 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | More TM4 conditioning without source tray | The conditioning station was ramped down
overnight and David ramped it back up this
morning. Currently trying to get it to sit |
|
|
2296
|
Thursday, January 20, 2022, 08:18 |
David Wang | North Hot-Cell | Standard Operation | TM4 | No target | TM4 was removed from NHC to S_W silo yesterday. | TM4 was removed from NHC to S_W silo yesterday.
The remove is smooth and successful. |
|
|
2745
|
Thursday, January 09, 2025, 11:46 |
David Wang | Safe Module Parking | Standard Operation | TM4 | No target | SMP is under vacuum for TM4 storage during shut down. | SMP:MP1 is started with SMP BV1 is
opened. SMP is under vacuum for TM4 storage
during shut down. |
|
|
2750
|
Thursday, January 16, 2025, 14:21 |
David Wang | Conditioning Station | Standard Operation | TM3 | No target | TM3 electrical check at TCS under good vacuum | A
complete TM3 electrical check at TCS under
good vacuum has been done. Pin 14 to 60KV |
 |
|
2755
|
Tuesday, January 28, 2025, 11:47 |
David Wang | Conditioning Station | Standard Operation | TM3 | No target | Tm3 has been moved from TCS to silo. | Tm3 has been moved from TCS to silo.
The move is successful. |
|
|
2766
|
Monday, February 10, 2025, 11:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | No target | TM2 has been moved from W_S silo to SHC. | Remotely removed TM2 from S-W silo to SHC
. Peter and I did the move. It is successful.
|
|
|
2769
|
Friday, February 14, 2025, 10:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | No target | TM2 has been moved from SHC to TCS. | TM2 has been moved from SHC to TCS successfully.
Travis and I did the move. |
|
|
2771
|
Tuesday, February 18, 2025, 10:41 |
David Wang | Conditioning Station | Standard Operation | TM3 | No target | TM2 at TCS annual electrical check and water lines helium pressure check . | TM2
has been moved to TCS and under good vacuum.
TP1/2 work fine. Electrical check: |
|
|
2773
|
Thursday, February 20, 2025, 10:12 |
David Wang | Safe Module Parking | Standard Operation | TM4 | No target | TM4 electrical check at SMP(vented) without target | TM4 electrical check at SMP(vented) without
target: PQ is dead short to RU. PQRU to 60kv
bias,750Kohm at250V. other things are good. |
|
|
2774
|
Thursday, February 20, 2025, 11:10 |
David Wang | Conditioning Station | Standard Operation | TM2 | No target | TM2 has been moved from TCS to west-south silo. | TM2 has been moved from TCS to west-south
silo. Travis and I did the job. The move
is successful. |
|
|
350
|
Wednesday, May 15, 2013, 18:12 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No source tray | HV test repeat | After discussion with Friedhelm it
was decided to continue trying to condition
the module today before moving it tomorrow. |
|
|
398
|
Friday, July 05, 2013, 10:02 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No source tray | TM3 module move to TCS | TM3 has been moved from the south hot cell
to the conditioning station. David and I
completed the move. All went well. |
|
|
85
|
Monday, April 16, 2012, 16:17 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | No Target | High Voltage Test | A high voltage test was completed
on a target free TM1 in the conditioning
station. Only the turbo pumps on the target |
|
|
1952
|
Monday, July 22, 2019, 14:51 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | No Target | TM4 Move | TM4 has been moved from the South West
silo to the South Hot Cell. New source tray,
no target. |
|