ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  1585   Monday, July 17, 2017, 17:50 Aurelia LaxdalConditioning StationDevelopmentTM3No targetConditioning TM3


   
        
            
 2017-07-17-16_53_03.grab.LWYG0y.png 
  1587   Tuesday, July 18, 2017, 16:53 Anders MjosConditioning StationDevelopmentTM3No targetConditioning TM3Conditioning continues today with resistors
removed from the HV cable
Tuesday, July 18, 2017, 16:53: BIAS
  
  1842   Wednesday, December 19, 2018, 14:41 Anders MjosConditioning StationStandard Operation No targetInstalled Shield Block on TCSFrank and Anders installed lid on TCS and
started vacuum system yesterday. To run over
the Holidays. Retrieved dose badge from operational
  
  1936   Monday, June 10, 2019, 08:26 Carla BabcockConditioning StationMaintenanceTM4No targetRamping voltage on TM4 w/o source trayTM4 in conditioning station with no source
tray, extraction electrode set to HV bias.
Brought up to 30kV over the weekend by ISAC
  
  1938   Monday, June 10, 2019, 16:22 Carla BabcockConditioning StationMaintenanceTM4No targetRamping V on TM4, no HV cover in THRamped down the bias so David could remove
the HV cover and lock out the target hall.
Ramped back up to BIAS / EL = 50kV
  
  1939   Monday, June 10, 2019, 18:12 Carla BabcockConditioning StationMaintenanceTM4No targetAttempt to push bias > 56kVMonday, June 10, 2019, 16:59 : TM4 back
up to BIAS / EL = 56.1kV / 29.5kV
Monday, June 10, 2019, 17:14 : After
 Screenshot_-_06102019_-_06_43_17_PM.png 
  1940   Wednesday, June 12, 2019, 08:56 Carla BabcockConditioning StationMaintenanceTM4No targetMore TM4 conditioning without source trayThe conditioning station was ramped down
overnight and David ramped it back up this
morning. Currently trying to get it to sit
  
  2296   Thursday, January 20, 2022, 08:18 David WangNorth Hot-CellStandard OperationTM4No targetTM4 was removed from NHC to S_W silo yesterday. TM4 was removed from NHC to S_W silo yesterday. 
The remove is smooth and successful. 
  
  2745   Thursday, January 09, 2025, 11:46 David WangSafe Module ParkingStandard OperationTM4No targetSMP is under vacuum for TM4 storage during shut down.  SMP:MP1 is started with SMP BV1 is
opened. SMP is under vacuum for TM4 storage
during shut down.
  
  2750   Thursday, January 16, 2025, 14:21 David WangConditioning StationStandard OperationTM3No targetTM3 electrical check at TCS under good vacuum A
complete TM3 electrical check at TCS under
good vacuum has been done. Pin 14 to 60KV
 TM3_electrical_check_@TCS_page_1.pdfTM3_electrical_check_@TCS_page_2.pdf 
  2755   Tuesday, January 28, 2025, 11:47 David WangConditioning StationStandard OperationTM3No targetTm3 has been moved from TCS to silo.Tm3 has been moved  from TCS to silo.
The move is successful.
  
  2766   Monday, February 10, 2025, 11:48 David WangSouth Hot-CellStandard OperationTM2No targetTM2 has been moved from W_S silo to SHC.Remotely removed TM2 from S-W silo to SHC
. Peter and I did the move. It is successful.
  
  2769   Friday, February 14, 2025, 10:48 David WangSouth Hot-CellStandard OperationTM2No targetTM2 has been moved from SHC to TCS. TM2 has been moved from SHC to TCS successfully.
Travis and I did the move. 
  
  2771   Tuesday, February 18, 2025, 10:41 David WangConditioning StationStandard OperationTM3No targetTM2 at TCS annual electrical check and water lines helium pressure check .TM2
has been moved to TCS and under good vacuum.
TP1/2 work fine.  Electrical check:
 TM2_at_TCS_annual_electrical_chheck_and_leak_check.pdf 
  2773   Thursday, February 20, 2025, 10:12 David WangSafe Module ParkingStandard OperationTM4No targetTM4 electrical check at SMP(vented) without targetTM4 electrical check at SMP(vented) without
target: PQ is dead short to RU. PQRU to 60kv
bias,750Kohm at250V. other things are good.
 TM2_electrical_check_at_SMP.pdf 
  2774   Thursday, February 20, 2025, 11:10 David WangConditioning StationStandard OperationTM2No targetTM2 has been moved from TCS to west-south silo.TM2 has been moved from TCS to west-south
silo. Travis and I did the job. The move
is successful. 
  
  350   Wednesday, May 15, 2013, 18:12 Bevan MossConditioning StationStandard OperationTM3No source trayHV test repeat After discussion with Friedhelm it
was decided to continue trying to condition
the module today before moving it tomorrow.
 15052013_TM3_HV_test_repeat.xlsx 
  398   Friday, July 05, 2013, 10:02 Bevan MossConditioning StationStandard OperationTM3No source trayTM3 module move to TCSTM3 has been moved from the south hot cell
to the conditioning station. David and I
completed the move. All went well.
  
  85   Monday, April 16, 2012, 16:17 Bevan MossConditioning StationStandard OperationTM1No TargetHigh Voltage Test A high voltage test was completed
on a target free TM1 in the conditioning
station. Only the turbo pumps on the target
  
  1952   Monday, July 22, 2019, 14:51 Adam NewsomeSouth Hot-CellStandard OperationTM4No TargetTM4 MoveTM4 has been moved from the South West
silo to the South Hot Cell. New source tray,
no target.
  