Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC, Page 59 of 138
Not logged in
Back
|
Find
|
Select
|
Help
|
Login
Full
|
Summary
| Threaded | Collapse |
Expand
2760 Entries
Goto page
Previous
1
,
2
,
3
...
58
, 59,
60
...
136
,
137
,
138
Next
Wednesday, June 12, 2019, 08:56, Carla Babcock, Conditioning Station, Maintenance, TM4, No target, More TM4 conditioning without source tray
Thursday, January 20, 2022, 08:18, David Wang, North Hot-Cell, Standard Operation, TM4, No target, TM4 was removed from NHC to S_W silo yesterday.
Thursday, January 09, 2025, 11:46, David Wang, Safe Module Parking, Standard Operation, TM4, No target, SMP is under vacuum for TM4 storage during shut down.
Thursday, January 16, 2025, 14:21, David Wang, Conditioning Station, Standard Operation, TM3, No target, TM3 electrical check at TCS under good vacuum
Tuesday, January 28, 2025, 11:47, David Wang, Conditioning Station, Standard Operation, TM3, No target, Tm3 has been moved from TCS to silo.
Wednesday, May 15, 2013, 18:12, Bevan Moss, Conditioning Station, Standard Operation, TM3, No source tray, HV test repeat
Friday, July 05, 2013, 10:02, Bevan Moss, Conditioning Station, Standard Operation, TM3, No source tray, TM3 module move to TCS
Monday, April 16, 2012, 16:17, Bevan Moss, Conditioning Station, Standard Operation, TM1, No Target, High Voltage Test
Monday, July 22, 2019, 14:51, Adam Newsome, South Hot-Cell, Standard Operation, TM4, No Target, TM4 Move
Wednesday, July 31, 2019, 08:57, Adam Newsome, South Hot-Cell, Standard Operation, TM4, No Target, TM4 Move
Friday, May 10, 2013, 11:28, Bevan Moss, Conditioning Station, Standard Operation, TM3, No Source Tray, Roughing Started
Friday, May 10, 2013, 14:05, Bevan Moss, Conditioning Station, Standard Operation, TM3, No Source Tray, Turbo Pumps On
Wednesday, May 15, 2013, 10:17, Bevan Moss, Conditioning Station, Standard Operation, TM3, No Source Tray, Preliminary Results from HV testing
Wednesday, May 15, 2013, 16:51, Bevan Moss, Conditioning Station, Standard Operation, TM3, No Source Tray, Repeat of HV Test
Tuesday, May 21, 2013, 11:52, Bevan Moss, Conditioning Station, Standard Operation, TM3, No Source Tray, May 16th Long HV conditioning
Monday, July 22, 2013, 15:52, Bevan Moss, Conditioning Station, Standard Operation, TM3, No Source Tray, HV testing update
Wednesday, September 25, 2013, 10:00, Travis Cave, South Hot-Cell, Standard Operation, TM3, NiO#2, module move
Wednesday, September 25, 2013, 11:08, Travis Cave, South Hot-Cell, Standard Operation, TM3, NiO#2, Electrical check
Wednesday, September 25, 2013, 13:48, Travis Cave, Conditioning Station, Standard Operation, TM3, NiO#2, Electrical check
+
Thursday, September 26, 2013, 14:31, Bevan Moss, South Hot-Cell, Repair, TM3, NiO#2, Activities September 24 - 25
Goto page
Previous
1
,
2
,
3
...
58
, 59,
60
...
136
,
137
,
138
Next
ELOG V2.9.2-2455