1554
|
Thursday, June 08, 2017, 08:35 |
David Wang | Conditioning Station | Development | TM2 | | TM2 gas line reconfiguration on the module top. | Reconfigured TM2 gas line on the module
top. It matches with the febiad gas line
we are using on service tray now. Facing |
|
|
162
|
Tuesday, August 14, 2012, 14:27 |
David Wang | ITW | Standard Operation | TM1 | UCx | TM1connection in ITW | Connected TM1 in ITW,started 6 turbo pumps,
and finished TM1 water interlock check .
Every thing is good so far. |
|
|
128
|
Tuesday, June 19, 2012, 16:18 |
David Wang | ITW | Standard Operation | TM1 | Ta38 | TM1connected in ITW |
Normal
0
|
|
|
188
|
Tuesday, September 25, 2012, 14:33 |
David Wang | ITW | Standard Operation | TM1 | Nb#7 | TM1connected in ITW | TM 1 is in ITW now. All connections are
done. The turbo pumps had been started this
afternoon. The vacuum looks good so far. |
|
|
214
|
Wednesday, November 14, 2012, 10:57 |
David Wang | ITW | Standard Operation | TM1 | | TM1connected in ITW | I connected TM1 in ITW yesterday. Everything
is good so far. Travis was with me when i
did the job. |
|
|
892
|
Monday, April 20, 2015, 10:22 |
David Wang | Conditioning Station | Standard Operation | TM1 | UCx12 | TM1 with UCx12 has been connected to CS and ready for conditioing. | The TH will be locked during the TM1 conditioning
time due to an interference issue between
CS HV cover and a gas analysis valve on top |
|
|
1071
|
Thursday, September 17, 2015, 11:50 |
David Wang | Spent Target Vault | Repair | TM1 | | TM1 window circuit leak check | Leak check TM1 window circuit soldering
stems inside service cap when module is located
at NE silo. LD base LR 0.0xE-9atm.cc/sec. |
|
|
1182
|
Tuesday, March 29, 2016, 08:38 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 water lines helium pressure check at TCS | TM1 water lines helium pressure check at
TCS is done. 70 psi helium was applied to
water circuits. Leak detector base leak rate |
|
|
762
|
Tuesday, October 14, 2014, 12:19 |
David Wang | ITW | Standard Operation | TM1 | | TM1 was disconnected in ITW. | TM1 was disconnected in ITW this morning.
Heat shield circuit is purged. |
|
|
971
|
Tuesday, June 30, 2015, 15:41 |
David Wang | ITW | Standard Operation | TM1 | | TM1 was disconnected in ITW this morning. | TM1 was disconnected in ITW this
morning. The ITW was vented with argon last
night. |
|
|
779
|
Tuesday, November 04, 2014, 13:17 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | ThO#1 | TM1 w/ ThO#1 ready | Tm1 with ThO#1 is buttoned up and ready
for transport. |
|
|
1192
|
Tuesday, April 05, 2016, 12:36 |
David Wang | ITW | Standard Operation | TM1 | | TM1 vacuum system has been connected in ITW. | All turbo -pumps are started. |
|
|
231
|
Tuesday, January 15, 2013, 10:49 |
David Wang | ITW | Standard Operation | TM1 | no target | TM1 vacuum system connection in ITW | I connected TM 1 vacuum system in ITW.
The TM1 and ITW will be pumped out for shut
down routine leak check. |
|
|
4
|
Thursday, June 30, 2011, 16:04 |
Pierre Bricault | Conditioning Station | Repair | TM1 | | TM1 status | Friday June 24 2011
The target module has been moved
to the Conditioning Station (CS) |
|
|
1481
|
Thursday, April 06, 2017, 12:33 |
David Wang | Conditioning Station | Repair | TM1 | | TM1 rust inpsection and removal | TM1 inside service cap surface and shielding
plug surface are visually inspected yesterday.
No rust has been found. I cleaned all rust |
|
|
19
|
Wednesday, August 17, 2011, 13:09 |
Bevan Moss | ITW | Standard Operation | TM1 | Ta #37 | TM1 move from ITW to Hot Cell | TM1 with Ta #37 target was moved
from ITW to the south hot cell. The rotation
of TM1 may have been off slightly during |
|
|
990
|
Thursday, July 09, 2015, 14:02 |
David Wang | Conditioning Station | Development | TM1 | | TM1 is pumping down at CS | TM1 and CS vacuum system are connected.
All turbo-pumps are started. The new TP1S
works fine also. The pumping down looks good |
|
|
743
|
Monday, September 08, 2014, 13:44 |
David Wang | Conditioning Station | Standard Operation | TM1 | ZrC#6 | TM1 is disconnected at CS. | Stopped TM1 and CS turbo pumps. Disconnected
TM1 at CS. The CS and TM1 are under vacuum
and naturally leak up. I will vent it on |
|
|
740
|
Thursday, September 04, 2014, 11:19 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 is connected in CS. | TM1 is connected in CS. All turbo pumps
are started. |
|
|
1928
|
Wednesday, May 22, 2019, 11:52 |
David Wang | Conditioning Station | Maintenance | TM1 | | TM1 inpsection. | TM1 shielding plates and their holding
bolts are inspected. No corrosion.
TM1 is located at TCS now. Both TP1 and TP2 |
|