1374
|
Thursday, October 20, 2016, 14:17 |
Anders Mjos | ITE | Repair | TM4 | SiC#34 | HV enclosure inspection | The HV enclosure and module connections
were inspected by David and Anders on Wednesday
19th in an attempt to find any HV problems |
 |
1392
|
Monday, November 07, 2016, 10:35 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#34 | Spent Target move | Spent SiC#34 was moved on the 3rd of November
and placed in the spent target vault.
See attached pdf for details. |
|
1273
|
Wednesday, July 06, 2016, 09:16 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#33 | Ta#48 removed SiC#33 installed | Ta#48 has been removed from TM2 and SiC#33
installed. |
|
1275
|
Wednesday, July 06, 2016, 13:38 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | SiC#33 | module moved | TM#2 with SiC#33 has been moved from the
south hot cell to the conditioning station. |
|
1277
|
Wednesday, July 06, 2016, 15:23 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | SiC#33 | Conditioning SiC#33 | Wednesday, July 06, 2016, 15:23:
RGA on. IGs on
Friday, July 08, 2016, 17:07: |
 |
1281
|
Tuesday, July 12, 2016, 09:59 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#33 | module moved | TM#2 with SiC#33 has been moved from the
conditioning station to the west target station. |
|
1327
|
Tuesday, August 23, 2016, 10:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#33 | module moved | TM#3 with SiC#33 has been moved from the
west station to the south hot cell. |
|
1328
|
Tuesday, August 23, 2016, 13:31 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#33 | SiC#33 Removed | SiC#33 has been removed from TM2. |
|
1335
|
Wednesday, August 24, 2016, 14:37 |
Anders Mjos | South Hot-Cell | Standard Operation | | SiC#33 | PIE | The target was inspected by Anders
and Chad. The target was in good condition
as can be seen on the photos on DocuShare. |
|
1340
|
Thursday, August 25, 2016, 14:25 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#33 | Spent Target move | SiC#33 was placed into pail #141 which
in turn was placed into slot 2B of the vault.
I was 295mS/hr upon removal from the south |
|
1105
|
Monday, October 19, 2015, 11:53 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#32 | SiC#32 installed on TM2 | SiC#32 has been installed on TM2. High
current fasteners torqued to 130 in lbs. |
|
1106
|
Monday, October 19, 2015, 15:52 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | SiC#32 | Electrical and leak check | An electrical check was completed
by Travis C and Anders M. Note ~250 kOhm
between Target and 60 kV common. Leak check |
|
1107
|
Tuesday, October 20, 2015, 10:18 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#32 | Module moved | TM#2 with SiC#32 has been moved from the
south hot cell to the west target station. |
|
1108
|
Tuesday, October 20, 2015, 12:49 |
Dan McDonald | ITW | Standard Operation | | SiC#32 | Tm2 hook up In ITW | Lower and disconnect TM2 from crane in
ITW, proceed with hooking up TM2 as per checklist
with Anders. Double check flow meters and |
|
1166
|
Wednesday, March 16, 2016, 09:20 |
Travis Cave | ITE | Standard Operation | TM2 | SiC#32 | module moved | TM#2 with SiC#32 has been moved from the
west station to the south hot cell. |
|
1167
|
Wednesday, March 16, 2016, 14:23 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#32 | SiC#32 removal Target Module Inspection | SiC#32 has been removed from TM2. Quick
inspection shows some troubling discoloration
on the water cooled connection blocks of |
 |
1173
|
Friday, March 18, 2016, 13:13 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | SiC#32 | Electrical Check | Electrical checks of the TM#2 with the
old SiC#32 and without the target. See attached
PDFs. |
 |
1177
|
Tuesday, March 22, 2016, 10:27 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#32 | Spent Target move | SiC#32 has been moved from the south hot
cell to the spent target storage. See attached
PDF for details. |
|
1910
|
Monday, April 29, 2019, 09:32 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#31,32 and UC#19,20,21 | Spent targets moved to mini vault. | The following targets have been moved
from the spent target vault to the mini vault:
#127 - SiC#31 (front) |
|
2008
|
Thursday, October 17, 2019, 11:49 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#31,32 and UC#19,20,21 | Loading F-308 | The targets in the mini storage have
been loaded into the F-308. |
|