Monday, January 29, 2018, 06:51, David Wang, Conditioning Station, Maintenance, TM1, , TCS and TM1 vacuum pumps switched off
|
TCS and Tm1 vacuum pumps are switched off this morning. TM1 TP1and TP2 work fine during this test period. Tm1 will be moved back to silo this morning.
TM1 IG1 stopped work during the test period. It could be broken. We will only replace this gauge if TM1 is used in ITW again. |
Wednesday, January 24, 2018, 13:30, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 has been moved to TCS this morning
|
Tm1 has been moved to TCS this morning. All turbo-pumps are started successfully at TCS and TM1. |
Monday, January 22, 2018, 07:47, David Wang, Conditioning Station, Standard Operation, TM3, , Restarted TM3 vacuum sysytem after site power bump
|
All TCS and TM3 vacuum pumps are started successfully. |
Wednesday, January 17, 2018, 13:54, David Wang, Conditioning Station, Standard Operation, TM3, , Start TM3 turbo pumps at TCS.
|
TM3 turbo-pumps are started at TCS. We will keep pumps running until next Wednesday. |
Wednesday, January 17, 2018, 10:38, Anders Mjos, Spent Target Vault, Standard Operation, TM1, , Old TM1 Source Tray moved to Cyclotron basement
|
The old TM1 Source Tray from 2011 has been moved to Cyclotron basement this morning. Source tray was stored in location 10. The box was moved from
the vault to the ante-room yesterday. No contamination was found on the box. Photos |
Wednesday, January 17, 2018, 06:51, David Wang, Conditioning Station, Standard Operation, , , Stop TCS vacuum pumps
|
I stopped TCS vacuum pumps for coming TM3 move. |
Tuesday, January 16, 2018, 10:36, Anders Mjos, Spent Target Vault, Standard Operation, TM2, , Old TM2 Source Tray moved to Cyclotron basement
|
The old TM2 Source Tray from 2009 has been moved to Cyclotron basement this morning. Source tray was stored in location 9. The box was moved from the
vault to the ante-room yesterday. No contamination was found on the box. |
Tuesday, January 16, 2018, 06:50, David Wang, ITE/ITW Cooling, Standard Operation, , , Field measurement on old resin tank in silo
|
The old resin tank has been stored in silo since last year March. Without crane the tank up, We use the pole monitor measured the field around
the bottom of the tank in silo. The average contact field on the bottom is about 4.0msv/hr. @0.5meter , the field is about 900usv/hr. It is still
too hot to remove it. |
Thursday, January 04, 2018, 13:28, Anders Mjos, Conditioning Station, Maintenance, , , Troubleshooting IG1S
|
TCS:IG1S is reporting vacuum levels that seem to be too low (1E-10 to 1E-8 Torr). The gauge was connected to the controller for IG1, which showed the
same value. A degas was performed for ~5 min. |
Tuesday, January 02, 2018, 15:17, Anders Mjos, Conditioning Station, Maintenance, , , Tested chiller
|
Tested all 3 compressors and MP2 |
Tuesday, January 02, 2018, 14:47, Anders Mjos, Conditioning Station, Standard Operation, , , Pumping on secondary vacuum
|
Tuesday, January 02, 2018, 14:45: TP1S started |
Tuesday, January 02, 2018, 11:28, David Wang, ITE, Standard Operation, TM4, , ITE annual water interlock check.
|
Eric and I finished ITE annual water interlock check. Everything works properly. |
Tuesday, January 02, 2018, 10:46, David Wang, ITE/ITW Cooling, Standard Operation, , , Start High active water system.
|
High active water system was checked before restart. A small water leak on resin can supply valve was found. It is fixed. MP1 and MP2 were
started and checked separately. System pressure and flow rate are normal.MP1 is in operation now. |
Friday, December 22, 2017, 11:09, Anders Mjos, ITW, Standard Operation, TM2, , Shut down High Active Cooling water
|
Stopped MP1 today in preparation for the power outage over the holidays. both P-25 and P-26 breakers have been switched off to prevent inadvertent start
of system |
Thursday, December 21, 2017, 15:11, Anders Mjos, Conditioning Station, Maintenance, , , Powered down devices
|
Powered down mechanical pumps in ISAC-I Experimental hall, vacuum gauge and turbo pump controllers in ISAC-I B2 North Hot Cell service area |
Tuesday, December 19, 2017, 10:41, Anders Mjos, Crane, Maintenance, , , Crane powered down
|
The target hall crane has been powered down by Don today in preparation for the power shutdown over the Holidays. |
Tuesday, December 19, 2017, 10:40, Don Jackson, Crane, Maintenance, , , Crane Power during winter break
|
The power to the crane and controls were turned off using the power switch in the Crane Control room. The main disconnect switch in the target
hall was not touched.
All site power will be off for a period of time during the Christmas break and this removes the crane from any issues when power is restored. |
Wednesday, December 13, 2017, 15:32, Anders Mjos, Assembly/Bench Test, Maintenance, TM2, , Source Tray inspection
|
The Source tray was inspected in the RH shop today by Anders, Friedhelm and Jens. The routing of the lines are satisfactory, however a design proposal
to remove the ground electrode line will be made. This design will have to ensure a proper connection from the electrode to ground (using the window cooling
lines). All other lines are OK at this point. Some fine adjustments are expected after brazing and soldering to maintain high voltage separation. Photos |
Wednesday, December 06, 2017, 09:33, Anders Mjos, Conditioning Station, Maintenance, , , Running chiller for maintenance tech
|
Dakine is on site to do maintenance on the chiller. The tech requested the chiller to operate. |
Friday, December 01, 2017, 16:42, Isaac Earle, North Hot-Cell, Repair, , , NHC manipulator service visit
|
Pete Dudley, manipulator service technician from CRL, was on site from Nov 27-30 to service the NHC Model N manipulators (See E-log entry #1578 for background).
He began by evaluating the motion selection and electric drive of the manipulator installed on the blue service cart. This manipulator had
chip A0166R01, same as the right side manipulator which had the failure described in E-Log 1578. Pete noted that the arm was very slow to switch |
|