Thursday, August 03, 2017, 15:02, Travis Cave, Spent Target Vault, Standard Operation, , SiC#36, Spent Target Move
|
The spent SiC#36 has been moved from the south hot cell to the spent target vault. |
Tuesday, August 15, 2017, 09:27, Anders Mjos, South Hot-Cell, Standard Operation, TM2, SiC#36, Electrical Check of target in SHC
|
Travis Cave wrote:
The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results |
Monday, October 24, 2016, 14:44, chad fisher, South Hot-Cell, Standard Operation, TM2, SiC#35, SiC#35 installed
|
Sic#35 has been installed onto TM2. High current fasteners torqued to 130 in lbs.
Mating of the 9 pin connector was extremely problematic but in the end I was able to get it to mate properly. Noticed left (when facing module
in hot cell) febiad coil left twisted a bit when torqued up. |
Monday, October 24, 2016, 14:56, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#35, Electrical Checks 
|
Results of the electrical check of TM#2 with no target after the repair and with the SiC#35 mounted on the module. |
Tuesday, November 22, 2016, 10:45, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#35, module moved
|
TM#2 with the old SiC #35 has been moved from ITW to the south hot cell. |
Tuesday, November 22, 2016, 11:56, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#35, Electrical Check
|
Electrical check of TM#2 with the SiC#35 post beam run. See attached PDF for details. |
Friday, November 25, 2016, 09:04, Travis Cave, Spent Target Vault, Standard Operation, , SiC#35, Spent Target move
|
On November 24th 2016 the spent SiC#35 was moved from the south hot cell to the spent target vault. see attached pdf for details. |
Thursday, September 06, 2018, 10:25, Travis Cave, Spent Target Vault, Standard Operation, , SiC#34, Ta#45,46,47, 50, Spent Target Move
|
Targets SiC#34 , Ta#45,46,47,50 have been moved from the spent target vault to the mini vault. |
Friday, September 23, 2016, 08:55, Travis Cave, Conditioning Station, Standard Operation, TM4, SiC#34, Electrical Checks
|
The bundle of electrical checks, first one is the Iglis that failed, the second is the everything passed at the hot cell and the third is a the conditioning
station under vacuum. |
Saturday, September 24, 2016, 11:23, Anders Mjos, Conditioning Station, Standard Operation, TM4, SiC#34, Conditioning SiC#34  
|
Conditioning by ISAC operations
Saturday, September 24, 2016, 11:15: RGA on for heater conditioning. (kept off during HV conditioning)
Sunday, September 25, 2016, 07:44: TGHT and TBHT voltage jumps during heater ramping. Likely contact between target and heat shield. Contacted |
Tuesday, September 27, 2016, 09:13, Travis Cave, ITE, Standard Operation, TM4, SiC#34, module moved
|
TM#4 with SiC #34 has been moved to the east target station. |
Thursday, October 20, 2016, 14:17, Anders Mjos, ITE, Repair, TM4, SiC#34, HV enclosure inspection 
|
The HV enclosure and module connections were inspected by David and Anders on Wednesday 19th in an attempt to find any HV problems causing the
high leakage current. One cable was cable tied to a copper conductor in the chase. Some small pieces of loose material were removed. No obvious problems
could be detected. |
Monday, November 07, 2016, 10:35, Travis Cave, Spent Target Vault, Standard Operation, , SiC#34, Spent Target move
|
Spent SiC#34 was moved on the 3rd of November and placed in the spent target vault. See attached pdf for details. |
Wednesday, July 06, 2016, 09:16, chad fisher, South Hot-Cell, Standard Operation, TM2, SiC#33, Ta#48 removed SiC#33 installed
|
Ta#48 has been removed from TM2 and SiC#33 installed. |
Wednesday, July 06, 2016, 13:38, Travis Cave, Conditioning Station, Standard Operation, TM2, SiC#33, module moved
|
TM#2 with SiC#33 has been moved from the south hot cell to the conditioning station. |
Wednesday, July 06, 2016, 15:23, Anders Mjos, Conditioning Station, Standard Operation, TM2, SiC#33, Conditioning SiC#33 
|
Wednesday, July 06, 2016, 15:23: RGA on. IGs on
Friday, July 08, 2016, 17:07: Stopped cooling system due to a problem with the chiller. Will continue with HV conditioning on Monday.
Monday, July 11, 2016, 08:08: Cooling system started. Operating CP1 manually to control temperature |
Tuesday, July 12, 2016, 09:59, Travis Cave, ITW, Standard Operation, TM2, SiC#33, module moved
|
TM#2 with SiC#33 has been moved from the conditioning station to the west target station. |
Tuesday, August 23, 2016, 10:39, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#33, module moved
|
TM#3 with SiC#33 has been moved from the west station to the south hot cell. |
Tuesday, August 23, 2016, 13:31, chad fisher, South Hot-Cell, Standard Operation, TM2, SiC#33, SiC#33 Removed
|
SiC#33 has been removed from TM2. |
Wednesday, August 24, 2016, 14:37, Anders Mjos, South Hot-Cell, Standard Operation, , SiC#33, PIE
|
The target was inspected by Anders and Chad. The target was in good condition as can be seen on the photos on DocuShare.
Only minor accumulation of material on the EE. |
|