  2415   Monday, January 30, 2023, 11:30 Travis CaveSpent Target VaultStandard Operation UC#41Spent Target Move The spent UC#41 was moved from the
south hot cell to the spent target vault,
placed in spot 1C, in pail #231. See attached
 Target_Index_2023-01-30.pdf 
  2461   Wednesday, June 21, 2023, 09:51 Travis CaveSpent Target VaultStandard Operation TiC#5Spent Target Move TiC#5 moved to the spent target vault
from the north hot cell. Placed in pail#279
in spot 3A, 40mSv/h when removed from NHC.
 Target_Index_2023-06-21.pdf 
  2478   Wednesday, August 23, 2023, 10:45 Travis CaveSpent Target VaultStandard Operation TiC#6Spent Target Move TiC #6 moved from north hot cell
to spent target vault placed in pail #232
put in spot 6A and the field was 151mSv/hr
 Target_Index_2023-08-23.pdf 
  2494   Friday, October 06, 2023, 10:47 Travis CaveSpent Target VaultStandard Operation Nb#11Spent Target Move The spent Nb#11 target was removed
from the south hot cell and place in the
spent target vault. It was placed in pail
 Target_Index_2023-10-06.pdf 
  2497   Tuesday, October 31, 2023, 12:12 Travis CaveSpent Target VaultStandard Operation  Spent target measurements All 20 targets in the vault were
measured. The target spread sheet updated.
See attached PDF for details.
 Target_Index_2023-10-31.pdf 
  2518   Wednesday, January 10, 2024, 11:24 Travis CaveSpent Target VaultStandard Operation Ta#66Spent Target Move The spent Ta#66 was moved from the
south hot cell to the spent target vault,
it was placed in pail#285 and placed in spot
 Target_Index_2023-01-10.pdf 
  2582   Friday, May 03, 2024, 12:20 Travis CaveSpent Target VaultStandard Operation Ta#66Target repacked The Ta#66 target was repacked after
the parasitic target was removed it was place
in a new pail (#290) and place back in spot
 Target_Index_2024-05-03.pdf 
  2592   Wednesday, May 15, 2024, 10:06 Travis CaveSpent Target VaultStandard Operation UC#38,40 Ta#62,63 SiC#44Targets moved to the mini vault. Targets UC#38,40 Ta#62,63 SiC#44
have been moved from the spent target vault
to the mini vault in preparation for F-308
 Mini_Vault_Index_2024-05-15.pdfTarget_Index_2024-05-15.pdf 
  2644   Thursday, July 18, 2024, 11:22 Travis CaveSpent Target VaultStandard Operation UC#45Spent Target Move The UC#45 target was moved from the
south hot cell to the spent target vault.
It was place in Pail#292 spot 1A of the vault,
 Target_Index_2024-07-18.pdf 
  2660   Friday, August 16, 2024, 08:47 Travis CaveSpent Target VaultStandard Operation SiC#46Spent Target Move SiC#46 (pail 293) was placed in the
vault (spot 3B) on Wednesday the 14th
of August. It was 111 mSv/hr when removed
 Target_Index_2024-08-16.pdf 
  2669   Wednesday, August 21, 2024, 10:53 Travis CaveSpent Target VaultStandard Operation TiC#7Spent Target Move TIC#7 was placed in pail #294 and
then moved from the south hot cell to the
spent target vault spot 4B. It was 82.3mSv/hr
 Target_Index_2024-08-21.pdf 
  2670   Monday, August 26, 2024, 09:57 Travis CaveSpent Target VaultStandard Operation Nb#10Spent Target Move Nb#10 was placed in pail#295 and
moved from the south hot cell to the spent
target vault, spot 4A, it was 230uSv/hr when
 Target_Index_2024-08-26.pdf 
  2707   Tuesday, October 15, 2024, 13:44 Travis CaveSpent Target VaultStandard Operation TiC#8 and Ta#67Spent Target Move On Friday October 11th TiC#8 and
Ta#67 were place in the spent target vault
in Tray 8. See attached PDF for details. 
 Target_Index_2024-10-15.pdf 
  2709   Thursday, October 24, 2024, 10:42 Travis CaveSpent Target VaultStandard Operation SiC#44Target repacked moved to the mini vault. On October 22 2024 the spent SIC#44
returned from CNL was repacked in a new pail
it was in pail 275 and repacked into pail
 Mini_Vault_Index_2024-10-24.pdf 
  2714   Friday, November 08, 2024, 10:39 Travis CaveSpent Target VaultStandard Operation TiC#9Spent Target Move TiC#9 was placed in Pail 299 in spot
8A of the vault and was 92.1mSv/hr when removed
from the south hot cell. See attached pdf
 Target_Index_2024-11-08.pdf 
  2746   Monday, January 13, 2025, 10:02 Travis CaveSpent Target VaultStandard Operation UC#46Spent Target MoveUC#46 was placed in pail# 301 in spot 1B and
was 26.3mSv/hr when removed from the SHC.
See attached PDF for vault 
 Target_Index_2025-01-13.pdf 
  2749   Thursday, January 16, 2025, 10:03 Travis CaveSpent Target VaultStandard Operation UC#47Spent Target Move The spent UC#47 was moved from the
south hot cell to the spent target vault
placed in pail #302 in spot 1C of the vault,
 Target_Index_2025-01-16.pdf 
  2772   Wednesday, February 19, 2025, 10:07 Travis CaveSpent Target VaultStandard Operation SHC Active TrashSHC Active Trash Active trash was placed into an unmarked
pail and place in spot 7C of the vault the
pail measured 321uSv/hr when removed from
 Target_Index_2025-02-19.pdf 
  2778   Tuesday, February 25, 2025, 09:42 Travis CaveSpent Target VaultStandard Operation SHC Active TrashSHC Active Trash Another pail of active trash was
move to the spent target vault from the south
hot cell. 800uSv/hr, place in spot 7A see
 Target_Index_2025-02-25.pdf 
  2793   Thursday, April 24, 2025, 11:33 Travis CaveConditioning StationStandard Operation UC#48Module move TM4 with UC48 went on a long trip
from the north hot cell to the conditioning
station.
  