2518
|
Wednesday, January 10, 2024, 11:24 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#66 | Spent Target Move | The spent Ta#66 was moved from the
south hot cell to the spent target vault,
it was placed in pail#285 and placed in spot |
|
2582
|
Friday, May 03, 2024, 12:20 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#66 | Target repacked | The Ta#66 target was repacked after
the parasitic target was removed it was place
in a new pail (#290) and place back in spot |
|
2592
|
Wednesday, May 15, 2024, 10:06 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#38,40 Ta#62,63 SiC#44 | Targets moved to the mini vault. | Targets UC#38,40 Ta#62,63 SiC#44
have been moved from the spent target vault
to the mini vault in preparation for F-308 |
 |
2644
|
Thursday, July 18, 2024, 11:22 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#45 | Spent Target Move | The UC#45 target was moved from the
south hot cell to the spent target vault.
It was place in Pail#292 spot 1A of the vault, |
|
2660
|
Friday, August 16, 2024, 08:47 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#46 | Spent Target Move | SiC#46 (pail 293) was placed in the
vault (spot 3B) on Wednesday the 14th
of August. It was 111 mSv/hr when removed |
|
2669
|
Wednesday, August 21, 2024, 10:53 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#7 | Spent Target Move | TIC#7 was placed in pail #294 and
then moved from the south hot cell to the
spent target vault spot 4B. It was 82.3mSv/hr |
|
2670
|
Monday, August 26, 2024, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#10 | Spent Target Move | Nb#10 was placed in pail#295 and
moved from the south hot cell to the spent
target vault, spot 4A, it was 230uSv/hr when |
|
2707
|
Tuesday, October 15, 2024, 13:44 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#8 and Ta#67 | Spent Target Move | On Friday October 11th TiC#8 and
Ta#67 were place in the spent target vault
in Tray 8. See attached PDF for details. |
|
2709
|
Thursday, October 24, 2024, 10:42 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#44 | Target repacked moved to the mini vault. | On October 22 2024 the spent SIC#44
returned from CNL was repacked in a new pail
it was in pail 275 and repacked into pail |
|
2714
|
Friday, November 08, 2024, 10:39 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#9 | Spent Target Move | TiC#9 was placed in Pail 299 in spot
8A of the vault and was 92.1mSv/hr when removed
from the south hot cell. See attached pdf |
|
2746
|
Monday, January 13, 2025, 10:02 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#46 | Spent Target Move | UC#46 was placed in pail# 301 in spot 1B and
was 26.3mSv/hr when removed from the SHC.
See attached PDF for vault
|
|
2749
|
Thursday, January 16, 2025, 10:03 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#47 | Spent Target Move | The spent UC#47 was moved from the
south hot cell to the spent target vault
placed in pail #302 in spot 1C of the vault, |
|
2772
|
Wednesday, February 19, 2025, 10:07 |
Travis Cave | Spent Target Vault | Standard Operation | | SHC Active Trash | SHC Active Trash | Active trash was placed into an unmarked
pail and place in spot 7C of the vault the
pail measured 321uSv/hr when removed from |
|
2778
|
Tuesday, February 25, 2025, 09:42 |
Travis Cave | Spent Target Vault | Standard Operation | | SHC Active Trash | SHC Active Trash | Another pail of active trash was
move to the spent target vault from the south
hot cell. 800uSv/hr, place in spot 7A see |
|
718
|
Monday, July 28, 2014, 17:26 |
Ron Kuramoto | ITW | Repair | | | ITW:IV5 Air leak repair | Air leak
was found at the Solenoid control valve located
in the Pre-Separator & DB0 room. The |
  |
2588
|
Thursday, May 09, 2024, 13:52 |
Riley Sykes | Waste Package/Ship | Standard Operation | | | F308 Service/Inspection | F308 Inspection and service complete
on #06, #08, #13, #15, #16, #19, #20, #21,
#22. |
|
2638
|
Wednesday, July 10, 2024, 10:44 |
Riley Sykes | South Hot-Cell | Maintenance | | | Spring idler install | New spring idlers were installed
onto rotational chain drive for SHC roof.
Operation ran smoothly in both directions |
 |
2639
|
Friday, July 12, 2024, 08:51 |
Riley Sykes | Safe Module Parking | Maintenance | | | SMP chain guard | SS washers were added to all slotted
holes on SMP chainguard cover plate |
|
4
|
Thursday, June 30, 2011, 16:04 |
Pierre Bricault | Conditioning Station | Repair | TM1 | | TM1 status | Friday June 24 2011
The target module has been moved
to the Conditioning Station (CS) |
|
17
|
Tuesday, August 02, 2011, 09:41 |
Pierre Bricault | Conditioning Station | Repair | TM1 | ITW-TM1-Ta#37-LP-SIS | Test high voltage on TM1 | TM1 has received the Ta#37-LP and
has been pumping since thursday. This morning
the pressure gauges read, IMG1: 1.6x10^-6 |
|