Entry  Friday, August 16, 2019, 08:46, David Wang, ITE, Standard Operation, TM4, ZrC #8., TM2 has been connected in ITE. 

TM2 has been connected in ITE. turbo pumps have been started. ITE  and TM2 vacuum are good.

Entry  Monday, October 07, 2019, 14:03, David Wang, ITE, Standard Operation, TM2, Ta 59, TM2 has been connected in ITE. Ta_59_TM2_ITE__connection_checklist..pdf

Tm2 with Ta 59 has eben connected in ITE. Turbo pumps are started. See checklist

Entry  Friday, October 04, 2019, 16:43, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 has been connected at TCS. 

TM2 has been connected at TCS this morning. helium pressure test on Tm2 HS line is done. No leak.

Entry  Friday, July 08, 2016, 08:20, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 has been connected at TCS 

I connected TM2 to TCS and started water system.

Entry  Wednesday, June 28, 2017, 10:00, David Wang, Conditioning Station, Standard Operation, TM4, Ta#52, TM2 has been connected at TCS 

I started TCS water system.

Entry  Thursday, November 09, 2017, 09:35, David Wang, Conditioning Station, Standard Operation, TM2, Ta#55, TM2 has been connected at TCS 

TCS vacuum system and water system have been started as well. Everything looks fine.

Entry  Tuesday, August 30, 2016, 13:17, David Wang, ITW, Standard Operation, TM2, , TM2 has been connected at ITW 

  ITW turbo pumps  have been started.

Entry  Tuesday, October 25, 2016, 15:10, David Wang, ITW, Standard Operation, TM2, , TM2 has been connected at ITW 

All turbo pumps are started. Two gas valves for Febiad run are opened. Pumping down is good so far.

Entry  Tuesday, September 01, 2015, 14:54, David Wang, ITW, Standard Operation, TM2, , TM2 has been connectec in ITW. 

TM2 has been connected in ITW. During the connection, Anders and I  found the TM2  high current cables used in ITE and CS are short in ITW.  Anders and Grant found the original TM2 ITE high current cables in target hall. We replaced them. They works fine. But, a little bit longer on cable length would be easy to connect them. All other connections and HV cover in ITW work for the TM2 so far.

Entry  Thursday, March 17, 2016, 14:57, David Wang, South Hot-Cell, Repair, TM2, , TM2 first round leak check in SHC 

Chad and I finished the first round check on Tm2 water lines. The lines and spots checked are: Target oven + and - (front side braze joints) , Tube heater+and -(front side braze joints and water blocks), coil2 and coil 1(front side braze joints and area close to water blocks),. No leak has been found on all above of them.  The last, we checked   the GE which has the biggest leak so far. The leak detector base leak rate only can get to 4XE-9 atm.cc/sec. Chad sprayed helium very close to GE water block, and I got a quick response on leak detector. The leak rate climbed from 4Xe-9 atm.cc/sec to 1.4 atm.cc/sec. We confirmed the GE is leaking now. The exact location need to be pinpointed later once the containment box is out after the module is back to SHC. The module will be moved to TCS tomorrow morning and pressurized again there. Anders will use RGA to monitor the helium response during the check.  

Entry  Friday, August 16, 2019, 14:23, Carla Babcock, ITE, Repair, TM2, ZrC#8, TM2 electrical checks in ITE 

Ramped voltage on TM2 up to 30kV with no problems. Bias current is at 29uA, same as original TM2 bias current (see archiver for ITE June 15th, before protons) and similar to 31uA right after protons went off on Aug. 6.

TGHT=0A

TBHT=0A

BIAS V=30kV

BIAS current = 29uA

EZL V= 15kV

EZL current= 51uA

EE V= 1kV

EE current= 0.952mA

IG1= 8.6e-7

protons=0

This seems ok despite poor electrical checks showing 300 MOhm resistance between HV and ground. These values indicate a resistance of 1 GOhm. Let's see what happens when protons are on.

For future (optimistic) reference when testing protons:

BIAS=35kV, 35uA

EZL-17.5kV, 60uA

BIAS=38kV, 37uA

EZL=18.5kV, 63uA

Entry  Monday, January 17, 2022, 10:44, Frank Song, South Hot-Cell, Standard Operation, TM2, UC#36 (the target removed), TM2 electrical check without Target. TM2_without_UCx36_at_SHC_(2).jpg

 An electric check was done right after module moving from SMP to SHC. 

Entry  Tuesday, January 10, 2023, 10:15, Frank Song, Safe Module Parking, Standard Operation, TM2, UCx40 removed, TM2 electrical check with no target attached on SW silo TM2_electrical_check_without_UCx40_on_SW_silo.png

 TM2 with no target on SW silo be electrical checked right after module moving.

Entry  Tuesday, July 26, 2022, 13:50, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#38, TM2 electrical check with Target and No external Connections TM2_with_UCx38_echeck_on_NHC.jpg

 A standard electrical check was done for TM2 after the short issue be fixed.

Entry  Tuesday, January 24, 2017, 15:24, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 electrical check and leack check. 

I did electrical check before and after Fefiad target installation on TM2. The RU (coil) Is till short to 60KV as before. Other result are good. After Febiad target is installed, Tm2 HS line is leak checked. On leak detector, base leak rate pumping down is much slow  than before.  The base pressure still could be pumped down to 0.0XE-4 torr.  After a long time wait, Chad and I leak checked at 2.2XE-8 atm.cc/sec base leak rate. Chad sprayed lots helium around the fittings and target. No any response has been found on LD. At this leak rate, the target and HS line is leak tight.  The Tm2 has been moved to THC so a heium pressure check will be fulfilled on HS line at TCS to confirm this leak check result.  

TM2 HS line is pressurized with 70 psi helium at TCS. LD base leak rate: 0.0 X E-9 atm.cc/sec. Base pressure 0.0XE-4 torr. 5 minutes test time. The leak rate slowly climed to 3.3XE-9 atm.cc/sec and stabled there( 3minutes). base pressure no change. The leak is too small to be concern. We will run this target as this condition.

 

Entry  Monday, October 19, 2020, 12:52, David Wang, South Hot-Cell, Standard Operation, TM2, C#2, TM2 electrical and leak check at SHC Tm3_bunker_set_up_018.JPG

TM2 electrical check and leak check are done at SHC with C#2 target installed. The results are good.  

Entry  Tuesday, July 14, 2015, 12:56, chad fisher, South Hot-Cell, Repair, TM2, , TM2 containment box removed 

Containment box was removed from Tm2 this morning  in preparation for installation of coil line and all the trimmings.

Entry  Monday, June 11, 2018, 11:30, chad fisher, South Hot-Cell, Repair, TM2, , TM2 containment box on 

Tm2 containment box has been re-installed onto TM2.

Entry  Friday, September 22, 2017, 14:15, chad fisher, South Hot-Cell, Repair, TM2, , TM2 containment box off 20170922_140546.jpg20170922_140927.jpg

TM2 containment box has been removed. Found a piece of capton tape or tubing under table (see picture).

Entry  Wednesday, June 09, 2021, 10:48, David Wang, South Hot-Cell, Standard Operation, TM2, , TM2 containment box leak check.  

Chad installed containment box back to TM2 yesterday. We leak checked VCR joints on window line.    No leak.