  2769   Friday, February 14, 2025, 10:48 David WangSouth Hot-CellStandard OperationTM2No targetTM2 has been moved from SHC to TCS.

TM2 has been moved from SHC to TCS successfully. Travis and I did the move.

  2289   Tuesday, January 11, 2022, 11:51 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from NHC to SMP.

TM2( no target ) has been moved  from NHC to SMP.  The moving is smooth and successful.

  1099   Wednesday, October 14, 2015, 12:44 David WangITWStandard OperationTM2ZrC#7TM2 has been moved from ITW to SHC

Bill and I remotely removed TM2 from ITW to SHC. The move is smooth.

  2287   Monday, January 10, 2022, 12:38 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from ITW to NHC.

Travis and Nadia moved TM2 from ITW to NHC this morning. The move is smooth and successful.

  2696   Tuesday, October 01, 2024, 10:55 David WangSouth Hot-CellStandard OperationTM2 TM2 has been moved from ITE to SHC.

TM2 has been moved from ITE to SHC. Peter did the move with Travis on help.  The move is smooth.

  1846   Friday, January 04, 2019, 08:48 David WangITWStandard OperationTM2 TM2 has been disconnected in ITW.

TP1, TP2 are still connected for next week leak check. All water lines in TM2 are purged with 80 psi air, each for 5 minutes.

TP1 and TP2 had been disconnected. TM2 with UCx 25  disconnection checklist, See attachment.

Attachment 1: UCx25_TM2_disconnection_checklist.pdf
UCx25_TM2_disconnection_checklist.pdf UCx25_TM2_disconnection_checklist.pdf
  1961   Wednesday, August 14, 2019, 08:55 David WangITEStandard OperationTM2 TM2 has been disconnected in ITE.

TM2 has been disconnected in ITE. The bias jumper between U and T was burned out during the last beam time.

  1341   Monday, August 29, 2016, 13:34 David WangConditioning StationStandard OperationTM2 TM2 has been disconnected at TCS

I stopped TCS water pumps and vacuum pumps also.   TM2 and TCS will be vented tomorrow morning.

  1750   Tuesday, July 03, 2018, 14:42 David WangITWStandard OperationTM2Nb#8TM2 has been connected to ITW.

TM2 has been connected to ITW. All turbo pumps are started. See attachment for connection checklist.

Attachment 1: Nb#4_Module_connection_checklist.pdf
Nb#4_Module_connection_checklist.pdf Nb#4_Module_connection_checklist.pdf Nb#4_Module_connection_checklist.pdf
  2229   Tuesday, June 22, 2021, 15:35 David WangITWStandard OperationTM2UCX33#TM2 has been connected it ITW.

TM2 has been connected it ITW.  All turbo pumps are started.

  1559   Tuesday, June 13, 2017, 13:41 David WangITWStandard OperationTM2 TM2 has been connected in ITW.

Yasmine and I connected TM2 in ITW today. the control page is set to febiad mode. Both gas line in ITW are opened for febiad run. All connections are double checked. Module connection checklist is finished.  All turbo pumps are started now. Everything is good so far. The TM2 is ready for conditioning when the ITW vacuum is good enough.

  1662   Tuesday, November 14, 2017, 14:34 David WangITWStandard OperationTM2Ta#55TM2 has been connected in ITW.

TM2 has been connected in ITW. All turbo-pumps are started. Everything works fine.

  1282   Tuesday, July 12, 2016, 12:40 David WangITWStandard OperationTM2 TM2 has been connected in ITW

All turbo-pumps are started. Everything is good so far.

  2169   Tuesday, November 24, 2020, 12:56 David WangITWStandard OperationTM2Nb#9TM2 has been connected in ITW

TM2 has been connected to ITW. Turbo pumps are stared. ITW pumping down is fine so far.

Attachment 1: TM2_Nb#9_module_connection_checklist.pdf
TM2_Nb#9_module_connection_checklist.pdf TM2_Nb#9_module_connection_checklist.pdf TM2_Nb#9_module_connection_checklist.pdf TM2_Nb#9_module_connection_checklist.pdf
  1432   Wednesday, February 01, 2017, 12:23 David WangITEStandard OperationTM2 TM2 has been connected in ITE.

TM2 has been connected in ITE. The SST window water lines in ITE can not be connected properly to TM2. The water line connector on TM2 window is 90 degree CCW installed in direction comparing to TM4.This caused the problem. Solution: Two piece of flexible lines and extra male QC adapters have been used to fix this issue.  HV cover and HV fence in ITE work  with TM2. Other connections are good as well.

  1927   Wednesday, May 22, 2019, 11:50 David WangITEStandard OperationTM4 TM2 has been connected in ITE.

TM2 has been connected in ITE. high active water system and vacuum pumps are started. The pumping down on TM2 and ITE is good  so far.

See attachment for connection checklist.

Attachment 1: Ta58#TM2ITE_2019_June_._Conenction_checklist.pdf
Ta58#TM2ITE_2019_June_._Conenction_checklist.pdf Ta58#TM2ITE_2019_June_._Conenction_checklist.pdf Ta58#TM2ITE_2019_June_._Conenction_checklist.pdf
  1965   Friday, August 16, 2019, 08:46 David WangITEStandard OperationTM4ZrC #8.TM2 has been connected in ITE.

TM2 has been connected in ITE. turbo pumps have been started. ITE  and TM2 vacuum are good.

  2003   Monday, October 07, 2019, 14:03 David WangITEStandard OperationTM2Ta 59TM2 has been connected in ITE.

Tm2 with Ta 59 has eben connected in ITE. Turbo pumps are started. See checklist

Attachment 1: Ta_59_TM2_ITE__connection_checklist..pdf
Ta_59_TM2_ITE__connection_checklist..pdf Ta_59_TM2_ITE__connection_checklist..pdf Ta_59_TM2_ITE__connection_checklist..pdf
  2000   Friday, October 04, 2019, 16:43 David WangConditioning StationStandard OperationTM2 TM2 has been connected at TCS.

TM2 has been connected at TCS this morning. helium pressure test on Tm2 HS line is done. No leak.

  1278   Friday, July 08, 2016, 08:20 David WangConditioning StationStandard OperationTM2 TM2 has been connected at TCS

I connected TM2 to TCS and started water system.