  RH-ISAC, Page 49 of 141  Not logged in ELOG logo
IDdown Date Author Category Type Module Target/Number Subject
  1864   Thursday, January 31, 2019, 14:16 Isaac EarleNorth Hot-CellDevelopment  NHC grounding approval

 Franco Mammarella was consulted regarding electrical grounding of the NHC design (RS103 of Document-131915).  After discussing the design, and having grounding inspected by Randy Boehm, Franco approved the design and advised that the grounding system should be inspected periodically.  This task has been added to the Remote Handling inspection index on an annual schedule.  A PDF copy of the e-mail correspondence with Franco is attached.

Attachment 1: NHC_grounding.pdf
NHC_grounding.pdf NHC_grounding.pdf
  1863   Monday, January 28, 2019, 10:41 David WangConditioning StationRepairTM2 TM2 water lines helium pressure test at TCS

leak detector base LR: 0.0Xe-9atm.cc/sec. helium 70 psi. test time : 3 minutes for each circuit.The results in atm.cc/sec are Ta+(A):1.8  XE-8. TA-(B):0.0xE-9. Tu-(C):1.2XE-7. TU+(D):1.6XE-7. Coil 2 (PQ):0.0XE-9. Coil 1 (RU):0.0XE-9. MSP:2.2XE-7. EE:1.0XE-7. HS:N/A. Window:5.8XE-9

  1862   Thursday, January 24, 2019, 10:34 David WangITWMaintenance  Changed 24VDC plugs of TP solenoid valves in ITW

3 damaged 24VDC plugs of TP solenoid valves are replaced. Inspected other plugs. All of them are in good condition now.

  1861   Tuesday, January 22, 2019, 09:56 David WangITWMaintenanceTM2 ITW water system maintenance.

ITW water system maintenance is done. All working paddle wheels and coils are replaced. ITW water system polyurethane tubes are replaced as well. Two 3/8" leak small valves on return lines are replaced. 85 liters of tritium water are transferred from storage tank to B2 level holding tank. LALC water are refilled into S-tank. Restarted pump and checked system. Everything works fine now. No water leak has been found so far.  

  1860   Monday, January 21, 2019, 16:27 Isaac EarleNorth Hot-CellDevelopment  NHC in-cell camera wired to right side monitor

 The NHC right side monitor has been wired to display the signal from the in-cell camera.  This was tested using a snake camera on both of the CPC-4 connectors.

20190121_154407.jpg

  1859   Friday, January 18, 2019, 10:26 Isaac EarleNorth Hot-CellDevelopment  NHC sealing improvements and repeat of RH test for LED lights

The following NHC development work was completed under WP I2019-01-09-4:

  • Location of RH feature on operator level LED lighting updated to match IRH1800 Rev B design
  • Remote Handling test of the LED fixtures was repeated using a 9' pole with hook attachment through the manipulator slave hatch from the Target Hall: both LED fixtures were removed and reinstalled successfully with relative ease
  • Tool port seal replaced to address an audible air leak: the 1/4" foam seal was removed and replaced with adhesive backed 5/8" wide hollow foam rubber seal (McMaster Carr PN: 93085K81). Prior to the change DPG4 was at 0.63"wc, after the change wit was 0.73"wc with all system variables constant.
  • NHC manipulator access block seal was replaced, likewise to address an audible air leak: the 1/4" foam seal was removed and replaced with adhesive backed 1/2" thick BunA-N rubber strip (McMaster Carr PN: 9023K85).  DPG4 was at 0.94"wc prior to the change, and 1.07"wc after with all system variables constant
  1858   Monday, January 14, 2019, 07:07 David WangConditioning StationMaintenanceTM2 Restarted TCS vacuum system .

No issue.

  1857   Friday, January 11, 2019, 13:59 Isaac EarleSafe Module ParkingDevelopment  SMP motor selection decision

SMP drivetrain design work is currently underway.  Alejandro has selected a suitable 1200:1 reducer which will give a vessel rotation speed of 0.21rpm with a 1725rpm motor (deemed sufficiently close to the SHC rotation speed of 0.17rpm).  The reducer however is only rated for 0.33hp, and Allon's analysis recommended we use a motor of at least 0.4hp

 
From his calculations the expected power required to turn the loaded vessel is 0.2hp (see Document-161943, p3).  The higher figure of 0.4hp in his final recommendations comes from the power rating of a 40 tooth sprocket (the driver sprocket) with a No. 50 roller chain operating at 10rpm (the lowest speed shown on the table) - meaning this driver sprocket arrangement can handle up to 0.4hp.  We discussed this on the phone on January 4th and agreed that a 1/3hp motor could be used which will match the reducer Alejandro selected, and will supply sufficient power given that calculations indicate only 0.2hp is required.
 
Once the vessel is installed in the shield box a test will be performed to determine the actual torque (and power) required to turn the vessel.  If the value differs significantly from the calculated value the design will be revisited.
  1856   Friday, January 11, 2019, 13:17 David WangConditioning StationStandard OperationTM2 TCS and TM2 vacuum system are switched off for this Sunday power outage.

I will restart all pumps Monday morning.  

  1855   Friday, January 11, 2019, 11:26 Travis CaveSpent Target VaultStandard Operation UC#25Spent Target Move

 The spent target in the south hot cell has been moved to the spent target vault. It was placed in pail 204 and placed in spot 6B. The pail is made of thicker steel and thus will not need to be repackaged later.  The ISAC spent target vault is full there is no more room for any more targets.

Attachment 1: Target_Index_2019-01-11.pdf
Target_Index_2019-01-11.pdf Target_Index_2019-01-11.pdf
  1854   Thursday, January 10, 2019, 10:45 David WangConditioning StationStandard OperationTM2 TM2 is under vacum at TCS.

TCS: TP1, TP2 and TP1S are started.

  1853   Thursday, January 10, 2019, 09:26 Travis CaveConditioning StationStandard OperationTM2no targetModule move

 TM#2 has been moved from the south hot cell to the conditioning station.

  1852   Wednesday, January 09, 2019, 13:29 David WangITWRepair  ITH:MP1

ITH: MP1 has been replaced due to its poor performance.  Its motor and power cable are taken out and reused on new pump. Vacuum group assembled them together, and installed the new pump. The new pump works fine.

  1851   Wednesday, January 09, 2019, 13:08 Travis CaveSouth Hot-CellStandard OperationTM2UC#25Electrical Check

 Electrical check of the target module with the UC#25 attached after the beam run.

Attachment 1: Electrical_Chk_TM#2_UC#25_post_beam_Jan-09-2019.pdf
Electrical_Chk_TM#2_UC#25_post_beam_Jan-09-2019.pdf
  1850   Wednesday, January 09, 2019, 10:47 Travis CaveSouth Hot-CellStandard OperationTM2UC#25Module move

 TM#4 with UC#25 has been moved from ITW to the south hot cell.

  1849   Wednesday, January 09, 2019, 06:26 David WangConditioning StationStandard Operation  TCS vacuum pumps have been stopped.

The tCS will be vented soon for TM2 move later this week.

  1848   Tuesday, January 08, 2019, 08:49 David WangITWStandard OperationTM2 TP1 TP1 have been disconnected in ITW

Started argon venting of ITW now.

  1847   Friday, January 04, 2019, 14:38 Isaac EarleNorth Hot-CellDevelopment  NHC cameras tested

The NHC module support flange cameras (4 total) as well as the NHCSA camera were tested today and confirmed to be working properly.  All cameras were angled and focused properly, and displaying clearly on the monitors in the ISAC RH Control Room.  Photos of the control room monitors are attached below.

 

NHC_flange_East_and_West_views.JPG

 

NHC_flange_North_and_South_views.JPG

 

 Camera_view_through_operator_viewing_window.JPG

  1846   Friday, January 04, 2019, 08:48 David WangITWStandard OperationTM2 TM2 has been disconnected in ITW.

TP1, TP2 are still connected for next week leak check. All water lines in TM2 are purged with 80 psi air, each for 5 minutes.

TP1 and TP2 had been disconnected. TM2 with UCx 25  disconnection checklist, See attachment.

Attachment 1: UCx25_TM2_disconnection_checklist.pdf
UCx25_TM2_disconnection_checklist.pdf UCx25_TM2_disconnection_checklist.pdf
  1845   Thursday, January 03, 2019, 13:41 David WangCraneRepair  Target hall crane PLC issue.

Target hall crane did not work properly after power outage during Christmas time. The only movement could be operated is crane rotation. Power is supplied crane. The control board on N-S, E-W and up-down movement showed  F51 error code which is tripped limit.. All these clues pointed to a PLC control problem.  Don dale was asked for help. He used the crane control PLC program on an old computer  in RH control room reset the PLC system. Everything works fine after his reset.