Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 49 of 140  Not logged in ELOG logo
ID Date Authordown Category Type Module Target/Number Subject
  2259   Wednesday, October 13, 2021, 11:54 Travis CaveNorth Hot-CellStandard Operation SiC#41Spent Target Move

 The spent SiC#41 target has been placed in pail #260 and placed in spot 5B of that spent target vault. See attached PDF for details. 

Attachment 1: Target_Index_2021-10-13.pdf
Target_Index_2021-10-13.pdf Target_Index_2021-10-13.pdf Target_Index_2021-10-13.pdf
  2261   Friday, October 29, 2021, 12:27 Travis CaveSpent Target VaultStandard Operation Ta#56Repacking of the target.

 Ta#56 in pail #169 was repacked and placed into #269 and was placed in the mini vault at the back. It was 3.86mSv/hr upon removal from the NHC. See attached files for details.

Attachment 1: Target_Index_2021-10-29.pdf
Target_Index_2021-10-29.pdf Target_Index_2021-10-29.pdf Target_Index_2021-10-29.pdf
Attachment 2: Target_Index_2021-10-29_mini_vault.pdf
Target_Index_2021-10-29_mini_vault.pdf Target_Index_2021-10-29_mini_vault.pdf
  2266   Wednesday, November 10, 2021, 11:06 Travis CaveSpent Target VaultStandard Operation C#3Spent Target Move

 The spent C#3 target has been moved from the south hot cell to the spent target vault it was placed in pail #270 and put in spot 2C of the vault. See attached PDF for more details.

Attachment 1: Target_Index_2021-11-10.pdf
Target_Index_2021-11-10.pdf Target_Index_2021-11-10.pdf Target_Index_2021-11-10.pdf
  2267   Monday, November 15, 2021, 12:00 Travis CaveSpent Target VaultStandard Operation Ta#53Repacking of the target.

 Ta#53 was repacked and placed in the mini vault it was changed from pail#164 to pail#262. See attached PDF for further details.

Attachment 1: Target_Index_2021-11-15.pdf
Target_Index_2021-11-15.pdf Target_Index_2021-11-15.pdf Target_Index_2021-11-15.pdf
Attachment 2: Target_Index_2021-11-15_mini_vault.pdf
Target_Index_2021-11-15_mini_vault.pdf Target_Index_2021-11-15_mini_vault.pdf
  2269   Wednesday, November 17, 2021, 11:42 Travis CaveSpent Target VaultStandard Operation Ta#57Repacking of the targets.

 Ta#57 was repacked and placed in the mini vault. The pail was changed from #174 to #263. See attached PDF for more details.

Attachment 1: Target_Index_2021-11-17.pdf
Target_Index_2021-11-17.pdf Target_Index_2021-11-17.pdf Target_Index_2021-11-17.pdf
Attachment 2: Target_Index_2021-11-17_mini_vault.pdf
Target_Index_2021-11-17_mini_vault.pdf Target_Index_2021-11-17_mini_vault.pdf
  2270   Thursday, November 18, 2021, 09:47 Travis CaveSpent Target VaultStandard Operation SiC#38 and UC#29Spent Target Move

 The spent targets SiC#38 and UC#29 have been removed from the spent target vault and placed into the mini storage. See attached PDF for details.

Attachment 1: Target_Index_2021-11-18.pdf
Target_Index_2021-11-18.pdf Target_Index_2021-11-18.pdf Target_Index_2021-11-18.pdf
Attachment 2: Target_Index_2021-11-18_mini_vault.pdf
Target_Index_2021-11-18_mini_vault.pdf Target_Index_2021-11-18_mini_vault.pdf
  2290   Wednesday, January 12, 2022, 14:09 Travis CaveSpent Target VaultStandard Operation UC#36Spent Target Move

 The spent UC#36 target in the north hot cell has been removed and placed in the spent target vault. See attached PDF for detail note that the PDF does not show that spot 2B is occupied by the 2A3M20 pail.

Attachment 1: Target_Index_2022-01-12.pdf
Target_Index_2022-01-12.pdf
  2297   Thursday, January 20, 2022, 11:09 Travis CaveSpent Target VaultStandard Operation Ta#63Spent Target Move
The spent Ta#63 has been moved from the north hot cell to the spent target vault. It was place in pail#266 and 
placed in spot #3B of the vault. see attached PDF for more details.
Attachment 1: Target_Index_2022-01-20.pdf
Target_Index_2022-01-20.pdf
  2322   Thursday, May 19, 2022, 11:42 Travis CaveSpent Target VaultStandard Operation Sic#39, Ta#59, C#2, UC# 32 & 30Targets moved to the mini vault.

 Sic#39, Ta#59, C#2, UC# 32 & 30 have been moved from the spent target vault to the mini vault. See the attached pdf for details of the vaults.

Attachment 1: Target_Index_2022-05-19.pdf
Target_Index_2022-05-19.pdf
Attachment 2: Mini_Vault_Target_Index_2022-05-19.pdf
Mini_Vault_Target_Index_2022-05-19.pdf Mini_Vault_Target_Index_2022-05-19.pdf
  2339   Thursday, June 23, 2022, 10:22 Travis CaveSpent Target VaultStandard Operation UC#37Spent Target Move

 UC#37 was placed in pail #228 and place in spot 1B it was removed the north hot cell. See attached PDF for more details of it and the vault.

Attachment 1: Target_Index_2022-06-23.pdf
Target_Index_2022-06-23.pdf
  2345   Wednesday, July 06, 2022, 10:30 Travis CaveSpent Target VaultStandard Operation SiC#42Spent Target Move

 The spent SiC#42 was moved from the north hot cell to the spent target vault, it was placed in pail #271 and put in spot 2B. see attached PDF for more details.

Attachment 1: Target_Index_2022-07-06.pdf
Target_Index_2022-07-06.pdf
  2351   Thursday, July 28, 2022, 10:47 Travis CaveSpent Target VaultStandard Operation SiC#43Spent Target Move

 The spent target SiC#43 was moved from the north hot cell in pail #272 and place in 5A of the spent target vault. See attached PDF for details.

Attachment 1: Target_Index_2022-07-28.pdf
Target_Index_2022-07-28.pdf
  2357   Thursday, August 18, 2022, 10:13 Travis CaveSpent Target VaultStandard Operation Ta#64Spent Target Move

 The spent Ta#64 target in the north hot cell has been packaged and placed in the spent target vault. Pail#273 spot #5C 86.6mSv/hr upon removal from the north hot cell. For detail on the vault see attached PDF.

Attachment 1: Target_Index_2022-08-18.pdf
Target_Index_2022-08-18.pdf
  2367   Thursday, September 15, 2022, 11:25 Travis CaveSpent Target VaultStandard Operation UC#38Spent Target Move

 The spent target UC#38 was packed into pail #274 and placed in spot 1A of the vault. It was 33.3mSv/hr when removed from the north hot cell. See attached PDF for more vault details.

Attachment 1: Target_Index_2022-09-15.pdf
Target_Index_2022-09-15.pdf
  2377   Thursday, October 13, 2022, 09:32 Travis CaveSpent Target VaultStandard Operation SiC#44Spent Target Move

 Spent target move done. The SiC#44 was moved from the north hot cell to the spent target vault. It was placed in pail#275 and placed in spot#4A. It was 42.6mSv/hr when removed from the north hot cell. See attached PDF for further details about the vault.

Please note we will only have two free spots in the vault at the start of the running period after the winter shutdown 2023.

Attachment 1: Target_Index_2022-10-13.pdf
Target_Index_2022-10-13.pdf
  2384   Thursday, November 03, 2022, 10:08 Travis CaveSpent Target VaultStandard Operation UC#39Spent Target Move

 The spent UC#39 target (pail #276) was removed from the north hot cell and place in the spent target vault (spot 4B) it was 14.4 mSv/hr when removed from the north hot cell. See attached PDF for further details. 

Attachment 1: Target_Index_2022-11-03.pdf
Target_Index_2022-11-03.pdf
  2404   Wednesday, January 11, 2023, 11:34 Travis CaveSpent Target VaultStandard Operation UC#40Spent Target Move

 UC#40 was moved from the north hot cell to the spent target vault. It was placed in pail #278 put in spot 1B and was 15.6 mSv/hr when removed from the north hot cell.

Also Ta#62 in pail #256 was moved from spot 7B back to 7A where it was originally located. This pail in the future will have to be repacked due to the fact it lacks a reinforcing disc in the bottom of the pail.

attached is vault details.

Attachment 1: Target_Index_2023-01-11.pdf
Target_Index_2023-01-11.pdf
  2415   Monday, January 30, 2023, 11:30 Travis CaveSpent Target VaultStandard Operation UC#41Spent Target Move

 The spent UC#41 was moved from the south hot cell to the spent target vault, placed in spot 1C, in pail #231. See attached PDF for details. 

Attachment 1: Target_Index_2023-01-30.pdf
Target_Index_2023-01-30.pdf
  2461   Wednesday, June 21, 2023, 09:51 Travis CaveSpent Target VaultStandard Operation TiC#5Spent Target Move

 TiC#5 moved to the spent target vault from the north hot cell. Placed in pail#279 in spot 3A, 40mSv/h when removed from NHC. See attached PDF for further details.

Attachment 1: Target_Index_2023-06-21.pdf
Target_Index_2023-06-21.pdf
  2478   Wednesday, August 23, 2023, 10:45 Travis CaveSpent Target VaultStandard Operation TiC#6Spent Target Move

 TiC #6 moved from north hot cell to spent target vault placed in pail #232 put in spot 6A and the field was 151mSv/hr when removed from the north hot cell. See attached PDF for details about spent target vault.

Attachment 1: Target_Index_2023-08-23.pdf
Target_Index_2023-08-23.pdf
ELOG V2.9.2-2455