2297
|
Thursday, January 20, 2022, 11:09 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#63 | Spent Target Move | The spent Ta#63 has been moved from the north
hot cell to the spent target vault. It was
place in pail#266 and
|
|
2322
|
Thursday, May 19, 2022, 11:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Sic#39, Ta#59, C#2, UC# 32 & 30 | Targets moved to the mini vault. | Sic#39, Ta#59, C#2, UC# 32 &
30 have been moved from the spent target
vault to the mini vault. See the attached |
|
2339
|
Thursday, June 23, 2022, 10:22 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#37 | Spent Target Move | UC#37 was placed in pail #228 and
place in spot 1B it was removed the north
hot cell. See attached PDF for more details |
|
2345
|
Wednesday, July 06, 2022, 10:30 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#42 | Spent Target Move | The spent SiC#42 was moved from the
north hot cell to the spent target vault,
it was placed in pail #271 and put in spot |
|
2351
|
Thursday, July 28, 2022, 10:47 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#43 | Spent Target Move | The spent target SiC#43 was moved
from the north hot cell in pail #272 and
place in 5A of the spent target vault. See |
|
2357
|
Thursday, August 18, 2022, 10:13 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#64 | Spent Target Move | The spent Ta#64 target in the north
hot cell has been packaged and placed in
the spent target vault. Pail#273 spot #5C |
|
2367
|
Thursday, September 15, 2022, 11:25 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#38 | Spent Target Move | The spent target UC#38 was packed
into pail #274 and placed in spot 1A of the
vault. It was 33.3mSv/hr when removed from |
|
2377
|
Thursday, October 13, 2022, 09:32 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#44 | Spent Target Move | Spent target move done. The SiC#44
was moved from the north hot cell to the
spent target vault. It was placed in pail#275 |
|
2384
|
Thursday, November 03, 2022, 10:08 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#39 | Spent Target Move | The spent UC#39 target (pail #276)
was removed from the north hot cell and place
in the spent target vault (spot 4B) it was |
|
2404
|
Wednesday, January 11, 2023, 11:34 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#40 | Spent Target Move | UC#40 was moved from the north hot
cell to the spent target vault. It was placed
in pail #278 put in spot 1B and was 15.6 |
|
2415
|
Monday, January 30, 2023, 11:30 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#41 | Spent Target Move | The spent UC#41 was moved from the
south hot cell to the spent target vault,
placed in spot 1C, in pail #231. See attached |
|
2461
|
Wednesday, June 21, 2023, 09:51 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#5 | Spent Target Move | TiC#5 moved to the spent target vault
from the north hot cell. Placed in pail#279
in spot 3A, 40mSv/h when removed from NHC. |
|
2478
|
Wednesday, August 23, 2023, 10:45 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#6 | Spent Target Move | TiC #6 moved from north hot cell
to spent target vault placed in pail #232
put in spot 6A and the field was 151mSv/hr |
|
2494
|
Friday, October 06, 2023, 10:47 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#11 | Spent Target Move | The spent Nb#11 target was removed
from the south hot cell and place in the
spent target vault. It was placed in pail |
|
2497
|
Tuesday, October 31, 2023, 12:12 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target measurements | All 20 targets in the vault were
measured. The target spread sheet updated.
See attached PDF for details. |
|
2518
|
Wednesday, January 10, 2024, 11:24 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#66 | Spent Target Move | The spent Ta#66 was moved from the
south hot cell to the spent target vault,
it was placed in pail#285 and placed in spot |
|
2582
|
Friday, May 03, 2024, 12:20 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#66 | Target repacked | The Ta#66 target was repacked after
the parasitic target was removed it was place
in a new pail (#290) and place back in spot |
|
2592
|
Wednesday, May 15, 2024, 10:06 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#38,40 Ta#62,63 SiC#44 | Targets moved to the mini vault. | Targets UC#38,40 Ta#62,63 SiC#44
have been moved from the spent target vault
to the mini vault in preparation for F-308 |
|
2644
|
Thursday, July 18, 2024, 11:22 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#45 | Spent Target Move | The UC#45 target was moved from the
south hot cell to the spent target vault.
It was place in Pail#292 spot 1A of the vault, |
|
2660
|
Friday, August 16, 2024, 08:47 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#46 | Spent Target Move | SiC#46 (pail 293) was placed in the
vault (spot 3B) on Wednesday the 14th
of August. It was 111 mSv/hr when removed |
|