  2157   Tuesday, October 20, 2020, 10:14 Travis CaveITWStandard OperationTM2C#2Module move TM#2 with C#2 has been moved from
the south hot cell to the West Target Station.
  
  2159   Friday, October 30, 2020, 09:02 Travis CaveSpent Target VaultStandard Operation Ta#48,51,54 SiC#35, and UC#25Repacking of the targets. Targets Ta#48,51,54 SiC#35,
and UC#25 were repacked and placed in the
mini vault. In the following order back to
 Target_Index_2020-10-30.pdf 
  2160   Tuesday, November 03, 2020, 10:52 Travis CaveSouth Hot-CellStandard OperationTM4UC#31Module move TM#4 with UC#31 has been moved from
the east target station to the south hot
cell.
  
  2162   Thursday, November 05, 2020, 10:48 Travis CaveITEStandard OperationTM4Ta#61Module move TM#4 with Ta#61 has been moved from
the south hot cell to the east target station.
  
  2163   Thursday, November 12, 2020, 10:02 Travis CaveSpent Target VaultStandard Operation UC#31Spent Target Move UC#31 has been moved from the south
hot cell to the spent target vault. It is
in spot 8B of the vault in pail # 224 and
  
  2177   Friday, January 08, 2021, 09:40 Travis CaveSouth Hot-CellStandard OperationTM4Ta#61Module move TM#4 with Ta#61 has been moved from
the east target station to the south hot
cell.
  
  2179   Tuesday, January 19, 2021, 11:32 Travis CaveSafe Module ParkingStandard OperationTM2Nb#9Module move TM#2 with Nb#9 was moved from ITW
to SHC and then with no target it was moved
from the SHC to the SMP.
  
  2199   Friday, March 12, 2021, 11:36 Travis CaveSouth Hot-CellMaintenance East Entrance ModuleEntrance module move The East Entrance Module has been
moved from the East Target Station to the
South Hot Cell.
  
  2201   Wednesday, March 17, 2021, 09:10 Travis CaveITEStandard Operation  Entrance module move The east entrance module is now back
at the east target station.
  
  2224   Wednesday, June 09, 2021, 09:16 Travis CaveNorth Hot-CellStandard OperationTM2no targetModule move TM#2 has been moved from the SHC
to the NHC.
  
  2239   Friday, August 06, 2021, 11:52 Travis CaveNorth Hot-CellStandard Operation UC#33Spent Target MoveUC#33 has been packed and moved from the north
hot cell to the spent target vault. See attached
PDF for 
 Target_Index_2021-08-06.pdf 
  2243   Tuesday, September 14, 2021, 09:18 Travis CaveSouth Hot-CellRepairTM4SiC#40Module moveTM#4 with SiC#40 has been moved from the east
target station to the south hot cell.
  
  2244   Wednesday, September 15, 2021, 08:39 Travis CaveITEStandard OperationTM4SiC#41Module moveTM#4 with SiC#41 has been moved from the
NHC to ITE.
  
  2247   Friday, September 17, 2021, 14:28 Travis CaveSpent Target VaultStandard Operation Ta#62Spent Target Move The spent Ta#62 target along with
2A2M19 were placed in pail #256 and placed
in spot 7A of the spent target vault. See
 Target_Index_2021-09-17.pdf 
  2248   Tuesday, September 21, 2021, 13:47 Travis CaveNorth Hot-CellStandard OperationTM2UC#34Module move TM#2 with UC#34 has been moved from
ITW to the north hot cell had the target
removed and then moved to the south west
  
  2249   Wednesday, September 22, 2021, 11:13 Travis CaveSpent Target VaultStandard Operation UC#34Spent Target Move The spent UC#34 target was moved
from the north hot cell to the spent target
vault. See attached PDF for details.
 Target_Index_2021-09-22.pdf 
  2251   Monday, September 27, 2021, 14:29 Travis CaveITWStandard OperationTM2Graphite #3Module move TM#2 with C#3 has been moved from
the north hot cell to ITW. Also for the up
coming site wide power outage, the ISAC Target
  
  2255   Monday, October 04, 2021, 10:52 Travis CaveNorth Hot-CellStandard OperationTM4SiC#41Module move TM#2 moved from ITE to NHC SiC#41
removed and then moved back to ITE.
  
  2259   Wednesday, October 13, 2021, 11:54 Travis CaveNorth Hot-CellStandard Operation SiC#41Spent Target Move The spent SiC#41 target has been
placed in pail #260 and placed in spot 5B
of that spent target vault. See attached
 Target_Index_2021-10-13.pdf 
  2261   Friday, October 29, 2021, 12:27 Travis CaveSpent Target VaultStandard Operation Ta#56Repacking of the target. Ta#56 in pail #169 was repacked and
placed into #269 and was placed in the mini
vault at the back. It was 3.86mSv/hr upon
 Target_Index_2021-10-29.pdfTarget_Index_2021-10-29_mini_vault.pdf 