ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1293   Thursday, July 28, 2016, 11:27 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 with no target has been moved from
the conditioning station to the NE silo.
  
  1312   Wednesday, August 10, 2016, 09:44 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 has been moved from the north east
silo to the conditioning station.
  
  1316   Thursday, August 11, 2016, 10:37 David WangConditioning StationRepairTM3  TM3 service tray cover plate ITA2108 has been removed.Requested by Aurelia, and approved by Friedhelm,
TM3 service tray cover plate ITA2108 has
been remove out of the module. The plated
  
  1318   Friday, August 12, 2016, 10:59 Anders MjosConditioning StationDevelopmentTM3 HV Test with Service Chase Panel removedWater cooling is performed manually with
CP1. RGA is ON since yesterday. EE is not
connected and in conditioning mode.
 TM3_HV_conditioning_2016-08-12.docxTCS-2016-08-11_TM3_Service_Chase_Panel_Removed.rga 
  1322   Tuesday, August 16, 2016, 12:35 David WangConditioning StationRepairTM3  CS vacuum pumps have been stoppedThe TCS is venting now. The TM3 blue insulator
replacement job will be started soon.
  
  1325   Thursday, August 18, 2016, 14:19 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 is now back in the the north east
silo.
  
  1346   Wednesday, September 07, 2016, 11:44 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 has been moved from the NE Silo to
the conditioning station.
  
  1347   Thursday, September 08, 2016, 16:28 David WangConditioning StationRepairTM3 TM3 blue insulators have been replaced.All TM3 blue insulators except Gas,EL,
and 60 KV common  on top of the module
have been replaced with new designed insulators.
  
  1348   Thursday, September 08, 2016, 16:30 David WangConditioning StationRepairTM3 TM3 vacuum system have been connected at TCS.start of roughing now.
 start of TCS and TM3 turbo-pumps.
Everything is good so far.
  
  1349   Monday, September 12, 2016, 09:25 David WangConditioning StationRepairTM3 TM3 leak checked at TCSAfter blue insulators replacement, TM3
service cap are leak checked. LD base leak
rate 0.0xe-9 atm.cc/sec. I sprayed lots helium
  
  1350   Tuesday, September 13, 2016, 13:52 Anders MjosConditioning StationStandard OperationTM3 HV Test with new insulators on Service Cap (vacuum to air)Tuesday, September 12, 2016, 10:00: RGA
on

Tuesday, September 13, 2016,
 TM3_HV_conditioning_2016-09-13.docxTCS-2016-09-11_TM3_New_Blue_Insulators.rga 
  1351   Wednesday, September 14, 2016, 11:54 David WangConditioning StationRepairTM3 TM3 is disconnected at TCS. TM3 is disconnected at TCS and ready
to be moved to silo.
  
  1352   Wednesday, September 14, 2016, 13:53 Travis CaveConditioning StationStandard OperationTM3no targetModule moveTM#3, no target, has been moved from the
conditioning station to the north east silo.
  
  1412   Wednesday, November 30, 2016, 16:31 David WangConditioning StationRepairTM3 TM3 vacuum system have been connected at TCS.All water circuits are by passed on the
top of TM3. Water pumps and vacuum turbo-
pumps are started. Everything is ready for
  
  1414   Monday, December 05, 2016, 10:04 Aurelia LaxdalConditioning StationRepairTM3 TM3 vacuum system have been connected at TCS.


   
        
            
  
  1417   Friday, December 09, 2016, 18:05 Aurelia LaxdalConditioning StationRepairTM3 TM3 vacuum system have been connected at TCS.


   
        
            
  
  1490   Wednesday, April 12, 2017, 09:20 Travis CaveSouth Hot-CellRepairTM3no targetModule move TM#3 is now in the south hot cell.   
  1491   Wednesday, April 12, 2017, 12:51 David WangSouth Hot-CellRepairTM3 TM3 Ram readings @ SHC We have a ram installed on SHC pole
which is 0.5 meter to   module shielding
block surface. the readings we got today
  
  1492   Wednesday, April 12, 2017, 13:03 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical CheckElectrical check of TM#3 with no target
at the south hot cell
 TM3_elec_chk_no_tgt.PDF 
  1493   Wednesday, April 12, 2017, 16:39 Aurelia LaxdalSouth Hot-CellRepairTM3no targetTM3 Inspection at the South Hot CellFound spark signs on TM3's containment
on the side of the water blocks. They may
be OLD or/and NEW sparking signs, but this
 DSC_0886.JPGDSC_0883.JPG 