Monday, November 17, 2014, 11:38, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module move
|
TM#3 with no target has been moved from the conditioning station to the north west silo. |
Wednesday, September 30, 2015, 08:50, Travis Cave, South Hot-Cell, Maintenance, TM3, no target, Module moved
|
TM#3 is in the south hot cell it was moved from the north west silo. |
Wednesday, September 30, 2015, 11:14, Travis Cave, South Hot-Cell, Repair, TM3, no target, Electrical Check
|
TM#3 electrical check at the south hot cell, no target, all value are done at 1000Volts. See the attached PDF for the results. |
Tuesday, October 06, 2015, 21:12, Aurelia Laxdal, South Hot-Cell, Repair, TM3, , TM3 service cap inspection in target hall
|
David Wang and I did the service cap inspection in target hall: see WP I2015-10-06-10.<br>
Signs of sparking were seen underneath 3 insulators: E ("Cavity"), A ("Oven+") and B ("Oven -") at the pair water lines coming out of the feed-through and going to the HV chase. Specifically one water line of E is very close to the feed-through insulator (2-3mm gap) and here the sparking sings are more prominent: see picture. |
Thursday, October 08, 2015, 14:08, David Wang, South Hot-Cell, Standard Operation, TM3, Dummy target febiad., TM3 has been moved from SHC to NW silo
|
Bill and I moved TM3 from SHC to NW silo with a dummy febiad target installed on it. The move is smooth. |
Thursday, November 05, 2015, 09:57, Travis Cave, Conditioning Station, Maintenance, TM3, no target, Module moved
|
TM#3 has been moved from the north west silo to the conditioning station. |
Friday, November 06, 2015, 14:36, Anders Mjos, Conditioning Station, Development, TM3, FEBIAD test target, Testing TM3
|
Friday, November 06, 2015, 14:35: Roughing
Turbos was started around 4pm. Later it was found that the manual valve for the two turbo pumps on the service cap was closed. The valve was open and pumping resumed. The roughing vacuum was high and increased into Saturday morning. The vacuum system was switched off on Saturday.
Purged MP1 using the purging function. Performance recovered. Started rouging.
Monday, November 09, 2015, 09:18: Started TP1S
Monday, November 09, 2015, 09:22: Started TP1 and TP2
Monday, November 09, 2015, 09:33: All 3 turbos at speed
Leak found on F/T for multipin connector
Tuesday, November 10, 2015, 09:53: stopped turbos |
Friday, November 06, 2015, 14:44, Anders Mjos, Conditioning Station, Repair, TM3, , O-rings replaced on service cap
|
O-rings were replaced on the service cap by Anders, Maico, Aurelia and Keith under work permit I2015-11-05-5
One of the wires for the steerers had come loose and was reattached by Maico. Photo on DocuShare
|
Monday, November 09, 2015, 16:47, Anders Mjos, Conditioning Station, Maintenance, TM3, FEBIAD Test Target, Leak check of Service Cap
|
Service cap leak checked this afternoon. Found multiple leaks of 10E-8 to 10E-7 range. Connected to the backing line with IG1 at ~4E-6 T, CG1A around 40 mT. Got responses around large round flange on top, rectangular side panels, water f/t on GND and water f/t on HV. Will resume leak checking tomorrow to attempt to pinpoint sources of leak more accurately. |
Tuesday, November 10, 2015, 10:23, Anders Mjos, Conditioning Station, Maintenance, TM3, , Air to vacuum leak on service cap
|
Conducted a more thorough leak check this morning with Edi. He found a leak on the base of the blue F/T insulator for the multi-pin connector (see attachment). I discovered that all the bolts could rotate freely in the threads as they were too small. The bolts were replaced. The leak rate was reduced but still significant. The o-ring will likely need to be replaced.
Tuesday, November 10, 2015, 17:00: Could not find new o-ring. Cleaned groove and o-ring and applied o-ring grease. Re-attached F/T. |
Tuesday, November 10, 2015, 16:53, Anders Mjos, Conditioning Station, Development, TM3, FEBIAD test target, Testing TM3
|
Tuesday, November 10, 2015, 16:53: Roughing
Tuesday, November 10, 2015, 18:24: TP1S started
Tuesday, November 10, 2015, 18:30: TP1 and TP2 started
Tuesday, November 10, 2015, 18:41: All 3 turbos at speed.
Thursday, November 12, 2015, 08:30: Purged backing pump using purging function. Vacuum in backing line recovered to previous value.
Module connected for HV testing. No target heating possible. All F/Ts tied together to HV common. EZL connected.
Friday, November 13, 2015, 11:20: Started water package
Friday, November 13, 2015, 11:52: 1kV on BIAS and 1 kV on EL
Friday, November 13, 2015, 12:54: BIAS/EL 10 / 5 kV
Friday, November 13, 2015, 12:59: BIAS/EL 15 / 7.5 kV
Friday, November 13, 2015, 13:04: BIAS/EL 20 / 10 kV
Friday, November 13, 2015, 13:08 : BIAS/EL 22 / 11 kV. Some sparks.
Friday, November 13, 2015, 13:17: Sparking at 22.5 kV. Had to return to 20 kV to recover. Back at 22.5
Friday, November 13, 2015, 13:21 : BIAS/EL 24 / 12 kV.
Friday, November 13, 2015, 13:27: Heavy spakring around 24.5 kV. Had to return to 20 kV to recover.
Friday, November 13, 2015, 13:31: Attempted to increase voltage again. Sparking started around 23 kV. Had to lower to 20 kV.
Friday, November 13, 2015, 13:36: 9 sparks for the last 5 min.
Friday, November 13, 2015, 13:45: Spark rate reduced, but multiple sparks encountered again at 20.5 kV. Reduced back to 20 kV
Friday, November 13, 2015, 13:50: Increased sparking at 20 kV. Had to lower to 18 kV
Friday, November 13, 2015, 14:07: Back at 20 kV
Friday, November 13, 2015, 14:13: BIAS and EL off
Monday, November 16, 2015, 08:18: Fault on chiller. Reset chiller unit on the roof. |
Thursday, November 12, 2015, 10:18, Anders Mjos, Conditioning Station, Maintenance, TM3, , Air to vacuum leak on service cap
|
Anders Mjos wrote: |
Conducted a more thorough leak check this morning with Edi. He found a leak on the base of the blue F/T insulator for the multi-pin connector (see attachment). I discovered that all the bolts could rotate freely in the threads as they were too small. The bolts were replaced. The leak rate was reduced but still significant. The o-ring will likely need to be replaced.
Tuesday, November 10, 2015, 17:00: Could not find new o-ring. Cleaned groove and o-ring and applied o-ring grease. Re-attached F/T.
|
Tuesday
Steerer wire had disconnected again. See DocuShare for photos.
Thursday, November 12, 2015
Leak checked the fixed F/T and the panel for steeerers. No leaks found. |
Thursday, November 12, 2015, 13:25, Anders Mjos, Conditioning Station, Standard Operation, TM3, FEBIAD Test Target, Electrical check and leak check
|
Target to Anode and target to Common showed ~ 500 kOhm values. No leaks above 3E-9 atm-cc/s seen. See attached. |
Monday, November 16, 2015, 10:09, Anders Mjos, Conditioning Station, Standard Operation, TM3, FEBIAD Test Target, Electrical check after HV conditioning
|
Problem found between ANODE (F) and chassis 90 kOhm. See attachment for details. |
Monday, November 16, 2015, 10:37, David Wang, Conditioning Station, Repair, TM3, , TM3 has been disconnected at TCS.
|
I stopped the TM3 and TCS vacuum pumps and water system. The TM3 is disconnected and vented. It will be moved to silo this afternoon. |
Monday, November 16, 2015, 13:59, Travis Cave, Conditioning Station, Maintenance, TM3, no target, Module moved
|
TM#3 has been moved back to the NW silo. |
Monday, May 09, 2016, 08:43, David Wang, Conditioning Station, Repair, TM3, , I reinstalled all the side panel on TM3 service cap.
|
They were moved for TM3 inspection job last week. All the bolts on the panel are hand tight only now since they will be removed out for camera installation during next stage inspection. |
Tuesday, May 31, 2016, 09:45, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module moved
|
TM#3 has been moved from the NE Silo to the south hot cell. |
Thursday, June 02, 2016, 08:44, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical Check
|
Electrical check of TM#3 no target at the south hot cell. see attached for results. |
Thursday, June 02, 2016, 11:59, David Wang, South Hot-Cell, Repair, TM3, , 5K mega test on TM3
|
I did a 5KV mega test on TM3. Only5Mohm @5kV between coli line PQ and chassis(ground). It confirmed the close gap between P,Q and GE. Other lines are ok. See attachment. |
|