1900
|
Tuesday, March 26, 2019, 11:17 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Checks of TM#2 during the source tray change. |
The four electrical check done on TM#2 during the source tray change. |
Attachment 1: Elecrictal_Check_TM#2_Old_source_Tray_Jan_11_2019.pdf
|
|
Attachment 2: Electrical_Check_TM#2_No_Source_Tray_Feb_25_2019.pdf
|
|
Attachment 3: Electrical_Check_TM#_New_source_Tray_Mar_22_2019.pdf
|
|
Attachment 4: Electrical_Check_TM#2_new_source_tray_Mar_25_2019.pdf
|
|
1899
|
Tuesday, March 26, 2019, 11:10 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | Dummy Target | Electrical Check |
Electrical Check of TM#2 with the dummy target attached. |
Attachment 1: Electrical_Check_TM2_Dummy__Target_CS_Mar-26-2019.pdf
|
|
1898
|
Tuesday, March 26, 2019, 09:32 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | Dummy Target | Module move |
TM#2 with a new source tray and the dummy target has been moved from the south hot cell to the conditioning station. |
1897
|
Monday, March 25, 2019, 10:11 |
Aaron Schmidt | South Hot-Cell | Repair | TM2 | | LP-FEBIAD Test Target (empty) |
Link to previous target information: https://elog.triumf.ca/TIS/RH-ISAC/1039
Monday, March 25, 2019, 10:00: Target electrical checks (See Attachment 1)
Tested for TM2 |
Attachment 1: TM2_-_FEBIAD_target_-_Electrical_Test.pdf
|
|
1896
|
Thursday, March 21, 2019, 09:56 |
chad fisher | South Hot-Cell | Repair | TM2 | | Tray insertion |
This morning new water block fasteners and gas line capture nut fasteners were inserted into the hot cell. Window waterline blank off was removed from TM2, surfaces inspected and given a polish with Veltex (30 seconds, 70 psi) as there was a small bit of c seal residue. Transfer try with new source tray has been latched to the module. |
Attachment 1: 20190321_091833.jpg
|
|
Attachment 2: 20190321_094625.jpg
|
|
1895
|
Wednesday, March 20, 2019, 11:19 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move |
TM#2 has been moved from the conditioning station to the south hot cell. |
1894
|
Monday, March 18, 2019, 07:25 |
David Wang | Conditioning Station | Maintenance | TM3 | | TCS vacuum pumps have been stopped. |
The TCS will be vented soon for TM2 move. |
1893
|
Monday, March 18, 2019, 07:23 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 window line helium test |
New seals with a blank off cap are installed on TM2 window line water block. The seals are checked at TCS with 70 psi helium for 5 minutes with LD at 0.0xE-9atm/cc.sec. No response on LD during test. Seals are good. |
1892
|
Friday, March 15, 2019, 08:51 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | Module move |
TM#2 has been moved from the south hot cell to the conditioning station. |
1891
|
Thursday, March 14, 2019, 10:25 |
chad fisher | South Hot-Cell | Repair | TM2 | | Water Block Polishing status |
Phase 2 (intermediate) and Phase 3 (Final) polishing is complete on all water blocks on TM2 (minus ground electrode circuit which has only had a cursory cleaning). Phase 2 with 2000 grit wet sand paper and isopropynol for 1 minute with tool at 75 psi, Phase 3 with Veltex polishing cloth for 1 minute with tool at 75 psi. |
Attachment 1: Blocks_final_polished.jpg
|
|
1890
|
Tuesday, March 12, 2019, 09:13 |
chad fisher | South Hot-Cell | Repair | TM2 | | Water Block Polishing status |
Stage 1 polish has been achieved on all single seal water blocks using the single pad tool run at 75 psi, 2 3 minute cycles per block using red scotch brite. |
Attachment 1: Blocks_Stage_1_Polish.jpg
|
|
1889
|
Monday, March 11, 2019, 14:34 |
chad fisher | South Hot-Cell | Repair | TM2 | | Water Block Polishing status |
Stage 1 polishing (water scale and at least 99% of visual indium removed) has been achieved on all 2 seal water blocks that will be used (Ground electrode has not been polished). Process required 3-4 3minute cycles of the tool using scotch brite pads with the tool running at approximately 75 psi. |
1888
|
Friday, March 08, 2019, 14:10 |
chad fisher | South Hot-Cell | Repair | TM2 | | Water block polishing |
After trials with 2000 grid wet paper I have moved up to "red" scotch brite. This seems to have worked the best so far although it took two minutes to remove the ring that the other materials could not remove (see picture).
I have moved to next circuit. Currently at 3 minutes and 30 seconds with scotch brite but significant ring remains. |
Attachment 1: B_after_SB_(2).jpg
|
|
1887
|
Thursday, March 07, 2019, 13:59 |
chad fisher | South Hot-Cell | Repair | TM2 | | Polishing |
Polishing of the water block sealing surfaces has commenced. First attempt was on block B with low nap brown polishing pad (the least aggressive pad prepared) and isopropyl for 30 seconds. This cleaned a little but did not remove the "ring" which I believe is water scale. I will step up to 2000 grit wet sand paper and iso next. |
1886
|
Thursday, March 07, 2019, 12:20 |
chad fisher | South Hot-Cell | Repair | TM2 | | Pre-polishing pictures |
Pictures of the water blocks before polishing can be found on docushare, collection 24400 |
1885
|
Thursday, March 07, 2019, 12:02 |
chad fisher | South Hot-Cell | Repair | TM2 | | Box Off water block jig on |
The containment box has been removed from TM2 and the water block jig installed in preparation for water block polishing. |
Attachment 1: 20190307_113548.jpg
|
|
1884
|
Thursday, March 07, 2019, 09:12 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 move from TCS to SHC. |
TM2 has been moved from TCS to SHC. The move is smooth. |
1883
|
Tuesday, March 05, 2019, 14:29 |
chad fisher | South Hot-Cell | Repair | | | Tray Transfer Fixture Repair Complete |
Repair of the tray transfer fixture is complete (minus testing).
A distorted ball nut lock plate was replaced and thread loc added. to the ball nut/plate assembly. Testing will take place tomorrow once the thread lock has a chance to cure. |
Attachment 1: 20190305_130312.jpg
|
|
Attachment 2: 20190305_132303.jpg
|
|
Attachment 3: 20190305_133800.jpg
|
|
Attachment 4: 20190305_141346.jpg
|
|
1882
|
Tuesday, March 05, 2019, 09:38 |
chad fisher | South Hot-Cell | Repair | | | Transfer Fixture Repair |
Transfer fixture has been remotely disassembled to the point where the ball nut lock plate assembly can be inserted into the tool port and the plate replaced by hand in the tool port without having to enter the hot cell. Straight head screws will be replaced with SHCS to facilitate easier re-assembly and future disassembly. |
Attachment 1: 20190305_092228.jpg
|
|
Attachment 2: 20190305_092231.jpg
|
|
Attachment 3: 20190305_092326.jpg
|
|
Attachment 4: 20190305_092558.jpg
|
|
1881
|
Tuesday, March 05, 2019, 07:20 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 HV test at TCS |
Spark between HV cover vertical mesh plate and HS 60KV bias connecting clamp 90degree angle at 55 KV on TM2 top. HV cover is removed to test above 55KV. The spark triggered TH and SHC ventilation secondary alarm. |