2062
|
Wednesday, February 05, 2020, 11:03 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx 29 | UCx 29 post run electrical check | UCx 29 TM4 post run electrical check is
done before target is removed. Everything
is normal on measurements. |
|
2064
|
Thursday, February 06, 2020, 13:32 |
Adam Newsome | South Hot-Cell | Maintenance | TM4 | | TM4 moved from Conditioning Station to South Hot Cell | TM4 was moved from conditioning station
to south hot cell in preparation for wiring
replacement. No target. |
|
2065
|
Friday, February 07, 2020, 08:05 |
chad fisher | South Hot-Cell | Development | TM4 | | Containment box off for IGLIS | The containment box has been removed from
TM4 in prep for the IGLIS wiring job. |
|
2068
|
Friday, February 14, 2020, 14:13 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | SIS dummy target for IGLIS TM4 electrical check | Electrical check and HS, window leak check
result at SHC. See attachment. |
|
2077
|
Thursday, March 05, 2020, 07:16 |
David Wang | South Hot-Cell | Standard Operation | TM2 | SiC #39 | TM2 SiC #39 post run electrical checklist | Electrical check result is fine.
See attachment. |
|
2079
|
Friday, March 06, 2020, 09:51 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | TM2 was moved from SHC to SMP yesterday. | TM2 was moved from SHC to SMP yesterday.
The move is successful. TM2 is located at
SMP. There is no hot target on module so |
|
2085
|
Monday, March 16, 2020, 09:25 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move | TM#4 has been moved from the silo
to the south hot cell. |
|
2087
|
Tuesday, March 17, 2020, 12:58 |
David Wang | South Hot-Cell | Development | TM4 | | P2N target electrical check and leak check at SHC. | See attachment. Everything looks good.
|
|
2102
|
Tuesday, June 16, 2020, 09:37 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM#2 with no target has been moved
from the south west silo to the south hot
cell. |
|
2103
|
Wednesday, June 17, 2020, 09:49 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | C#1 | C#1 installed | Target C#1 has been installed on TM4 with
new high current fasteners torqued to 130in
lbs. |
|
2104
|
Wednesday, June 17, 2020, 09:53 |
David Wang | South Hot-Cell | Standard Operation | TM2 | C#1 | C#1 target electrical check and leak check at SHC. | Target to HS is 400 ohm. The rest check
is good. See attachment. |
|
2114
|
Tuesday, June 30, 2020, 10:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Test Proton to Neutron Target | Module move | TM#4 has been moved from the east
target station to the south hot cell. |
|
2116
|
Friday, July 03, 2020, 07:03 |
David Wang | South Hot-Cell | Standard Operation | TM4 | BEFORE TARGET INSTALLATION | ELECTRICAL CHECK BEFORE TARGET INSTALLATION. | PQ SHORT TO RU. A TO PQ 1.8 M OHM AT 500
V. THE REST ARE OL |
|
2117
|
Friday, July 03, 2020, 08:46 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UcX#30 | UCx#30 installed onto tm4 | UCx#30 has been installed onto TM4 with
new high current fasteners torqued to 130
in lbs. |
|
2118
|
Friday, July 03, 2020, 13:23 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#30 | TM4 UCx#30 Electrical check and HS leak check | Electrical and leak check are good. See
attachment. |
|
2128
|
Monday, July 27, 2020, 10:00 |
Travis Cave | South Hot-Cell | Maintenance | | | Entrance module move | The West Entrance module has been
moved from the west target station to the
south hot cell for repairs. |
|
2129
|
Tuesday, July 28, 2020, 09:26 |
chad fisher | South Hot-Cell | Repair | | | Entrance Module Wire Scanner | Entrance module wire scanner has been replaced.
Pictures to follow. |
|
2135
|
Wednesday, August 19, 2020, 10:17 |
Adam Newsome | South Hot-Cell | Standard Operation | | | ITW Entrance Module moved to SHC | ITW Entrance Module was moved from west
station to South Hot Cell. |
|
2137
|
Tuesday, August 25, 2020, 09:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Graphite #1 | Module move | TM#2 with Graphite #1 has been moved
from the conditioning station to the south
hot cell. |
|
2138
|
Wednesday, August 26, 2020, 09:52 |
David Wang | South Hot-Cell | Standard Operation | TM2 | Ta#60 | Ta#60 target electrical check and leak check at SHC. | Electrical check and leak check at SHC.
NO leak. electrical check ok.
Before target on, A is short to PQ, RU is |
|