Entry  Thursday, November 22, 2018, 14:38, Isaac Earle, North Hot-Cell, Development, , , NHC design approved by High Voltage Engineer NHCHV.pdf
To satisfy RS 101 from the NHC requirements specification (Document-131915) Tomislav Hurskovec was consulted regarding high voltage safety.  After
a verbal discussion on various aspects of the NHC design he confirmed that the design satisfies high voltage safety concerns.
A copy of his confirmation e-mail is attached in PDF format.
Entry  Thursday, November 22, 2018, 08:55, Anders Mjos, ITW, Repair, TM2, UC#25, ITW:FC5 safety signal limit switch installed FC5_limit_switch.jpg
Yesterday Diagnostics group installed a temporary external limit switch to provide the in signal to the safety system.
Entry  Thursday, November 22, 2018, 08:53, Anders Mjos, ITW, Standard Operation, TM2, UC#25, Block move 
Frank and Anders moved blocks from ITE to ITW yesterday
Entry  Thursday, November 22, 2018, 08:52, Anders Mjos, ITE, Standard Operation, TM4, Ta#57, Closed ITE dump water 
Paddle wheel signal was tripping proton beam in ITW. Valved off ITE dump to divert flow to ITW. Field around valve was about 600 uSv/h
Entry  Wednesday, November 14, 2018, 16:10, Anders Mjos, ITW, Repair, TM2, UC#25, ITW:FC5 safety signal troubleshooting 2018-11-13_FC5.pdf
Measured resistance on safety limit switches for FC5 on Exit Module 2. Determined that the in connected signal did not work (shows not connected irregardless
of FC position). Confirmed proper operation of the OUT limit. See attachment for details. The Harp 5 x and y signal connectors were checked and reconnected.
Entry  Thursday, November 08, 2018, 09:27, chad fisher, South Hot-Cell, Maintenance, , , South East Manipulator cable replacement 
The handle cable on the east manipulator of the south hot cell has been replaced. Old cable showed signs of wear but had no broken strands. Manipulator
is back together but still needs to be re-tensioned.
Entry  Wednesday, November 07, 2018, 09:50, Anders Mjos, ITW, Standard Operation, TM2, UC#25, TM2 connected in ITW 
TM2 was connected yesterday by Frank and Anders. The West side panel with IG1S on Exit Module 2 was replaced with a new SST panel with 1 CF flange only
(dwg). Link to check list on DocuShare.
Entry  Tuesday, November 06, 2018, 10:59, Travis Cave, ITW, Standard Operation, TM2, UC#25, Module move 
 TM#2 with UC#25 has been moved from the conditioning station to the west target station.
Entry  Monday, November 05, 2018, 14:27, Anders Mjos, Conditioning Station, Standard Operation, TM2, UC#25, Target module disconnected 
Frank and Anders disconnected the water and electrical connections this afternoon after the target was conditioned over the weekend. The heater ramping
program ran with the wrong gauge selected, causing the vacuum to go higher than planned. The module will be moved to ITW tomorrow.
Entry  Monday, November 05, 2018, 08:24, Travis Cave, Spent Target Vault, Standard Operation, , nSiC#1, Spent Target Move Target_Index_2018-11-02.pdf
 The spent nSiC#1 target has been moved from the south hot cell to the spent target vault. It was placed in pail #172 and placed in spot 7B. See
attached PDF for vault details.
Entry  Thursday, November 01, 2018, 11:42, David Wang, Conditioning Station, Standard Operation, TM2, UCx 25., TM2 HS line helium pressure test at TCS and helium spray at SHC.. 
Chad and I did  leak check on TM2 HS line at SHC yesterday. Base LR 0.0XE-9 atm.cc/sec.   No response on LD. during helium spray.  
Today , I did helium pressure test at TCS. base LR 0.0xe-9atm.cc/sec. applied 70psi helium for 3 minute. leak rate slowly climbed to2.2 Xe-7 atm.cc/sec
ate stopped there.  The result is close to before.
Entry  Wednesday, October 31, 2018, 14:23, Travis Cave, South Hot-Cell, Standard Operation, TM2, nSiC#1 and UC#25, Electrical Check Electrical_Chk__TM#2_nSiC#1_SHC_Post_Beam_Oct-31-2018.pdfElectrical_Chk_TM#2_UC#25_SHC_Oct-31-2018.pdf
 TM#2 with targets nSiC#1 (old target) and UC#25 (new target) electrical check results. See attached for details.
Entry  Wednesday, October 31, 2018, 14:20, Travis Cave, Conditioning Station, Standard Operation, TM2, UC#25, Module move 
TM#2 with UC#25 has been moved from the south hot cell to the conditioning station.
Entry  Tuesday, October 30, 2018, 10:50, Travis Cave, ITW, Standard Operation, TM2, nSiC#1, Modules moved 
 Modules were moved, ITW EX2 was moved from the conditioning station to the west target station and TM#2 ,with nSiC#1,  was moved from the
west target station to the south hot cell.
Entry  Monday, October 29, 2018, 10:43, David Wang, Conditioning Station, Repair, , , ITW exit 2 leak check at TCS. 
I did a leak check this morning on exit 2 module at TCS. LD base  leak rate is 4.00XE-9atm.cc/sec, Base pressure is 0.00 X E-4 torr. All seals,
bellows, and flanges are checked. The new FC5 bellow is good. There is a big leak up to 2X E-6 atm.c/sec has been found on IG1S side panel . The panel
itself  will be replaced this time. Machine shop is working on it.. Two small leaks in E-9  atm.cc/sec range have been found on the  o-ring
Entry  Friday, October 26, 2018, 09:44, Travis Cave, Conditioning Station, Standard Operation, , , Exit Module moved 
The west exit #2 module has been moved from the south hot cell to the conditioning station.
Entry  Thursday, October 25, 2018, 11:03, chad fisher, South Hot-Cell, Repair, , , Exit 2 West 8x
Actuator arms, lemos, lemos and banana plug block have been disconnected in preparation for raising of the service tray. Aaron has pictures
Entry  Tuesday, October 23, 2018, 11:32, David Wang, South Hot-Cell, Maintenance, , , ITW RV4S leak check. 
ITW RV4S (A and B) are leak checked. They are good.  
Entry  Tuesday, October 23, 2018, 10:53, chad fisher, South Hot-Cell, Repair, , , Exit 2 East 20181023_104541.jpg
Cover 1 was removed from the exit module. Confirmed with David that the actuator rod that needed to be disconnected was the far left )as viewed by the
hot cell operator). The fastener for this rod was un-accessible from this side. Cover 1 was re-installed (two bolts left loose) and cover 2 was removed.
fastener holding the actuator together was removed and luckily it does have a remote start.
Entry  Tuesday, October 23, 2018, 10:45, David Wang, ITW, Standard Operation, TM2, SiC nano, TM2 was disconnected in ITW. TM2_SiC_nano_disconnection_in_ITW.pdf
TM2(SiC nano) has been disconnected in ITW. See attachment