Entry  Wednesday, February 05, 2020, 11:03, David Wang, South Hot-Cell, Standard Operation, TM4, UCx 29, UCx 29 post run electrical check UCx29_post_run_electrical_check..pdf

UCx 29 TM4 post run electrical check is done before target is removed. Everything is normal on measurements.

Entry  Thursday, February 06, 2020, 13:32, Adam Newsome, South Hot-Cell, Maintenance, TM4, , TM4 moved from Conditioning Station to South Hot Cell 

 TM4 was moved from conditioning station to south hot cell in preparation for wiring replacement. No target.

Entry  Friday, February 07, 2020, 08:05, chad fisher, South Hot-Cell, Development, TM4, , Containment box off for IGLIS 

The containment box has been removed from TM4 in prep for the IGLIS wiring job.

Entry  Friday, February 14, 2020, 14:13, David Wang, South Hot-Cell, Standard Operation, TM4, , SIS dummy target for IGLIS TM4 electrical check Dumm_SIS_target_for_IGLIS_test_on_TM4.pdf

Electrical check and HS, window leak check result at SHC. See attachment.

Entry  Thursday, March 05, 2020, 07:16, David Wang, South Hot-Cell, Standard Operation, TM2, SiC #39, TM2 SiC #39 post run electrical checklist  SiC_#39_post_run_cheklist..pdf

 Electrical check result is fine.  See attachment.

Entry  Friday, March 06, 2020, 09:51, David Wang, South Hot-Cell, Standard Operation, TM2, , TM2 was moved from SHC to SMP yesterday. 

TM2 was moved from SHC to SMP yesterday.  The move is successful. TM2 is located at SMP. There is no hot target on module so SMP vacuum is not started.

Entry  Monday, March 16, 2020, 09:25, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move 

 TM#4 has been moved from the silo to the south hot cell.

Entry  Tuesday, March 17, 2020, 12:58, David Wang, South Hot-Cell, Development, TM4, , P2N target electrical check and leak check at SHC. P2N_target_electrical_chek_at_SHC.pdf

See attachment. Everything looks good.

Entry  Tuesday, June 16, 2020, 09:37, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move 

 TM#2 with no target has been moved from the south west silo to the south hot cell.

Entry  Wednesday, June 17, 2020, 09:49, chad fisher, South Hot-Cell, Standard Operation, TM4, C#1, C#1 installed C#1_Target.jpg

Target C#1 has been installed on TM4 with new high current fasteners torqued to 130in lbs.

 

 

Entry  Wednesday, June 17, 2020, 09:53, David Wang, South Hot-Cell, Standard Operation, TM2, C#1, C#1 target electrical check and leak check at SHC. C#1_target_electrical_and_leak_check.pdf

Target to HS is 400 ohm. The rest check is good. See attachment.

Entry  Tuesday, June 30, 2020, 10:18, Travis Cave, South Hot-Cell, Standard Operation, TM4, Test Proton to Neutron Target, Module move 

 TM#4 has been moved from the east target station to the south hot cell.

Entry  Friday, July 03, 2020, 07:03, David Wang, South Hot-Cell, Standard Operation, TM4, BEFORE TARGET INSTALLATION, ELECTRICAL CHECK BEFORE TARGET INSTALLATION. TM4_ELECTRICAL_CHECK_20220_07_02.pdf

PQ SHORT TO RU. A TO PQ 1.8 M OHM AT 500 V. THE REST ARE OL

Entry  Friday, July 03, 2020, 08:46, chad fisher, South Hot-Cell, Standard Operation, TM4, UcX#30, UCx#30 installed onto tm4 

UCx#30 has been installed onto TM4 with new high current fasteners torqued to 130 in lbs.

Entry  Friday, July 03, 2020, 13:23, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#30, TM4 UCx#30 Electrical check and HS leak check TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf

Electrical and leak check are good. See attachment.

Entry  Monday, July 27, 2020, 10:00, Travis Cave, South Hot-Cell, Maintenance, , , Entrance module move 

 The West Entrance module has been moved from the west target station to the south hot cell for repairs.

Entry  Tuesday, July 28, 2020, 09:26, chad fisher, South Hot-Cell, Repair, , , Entrance Module Wire Scanner 

Entrance module wire scanner has been replaced. Pictures to follow.

Entry  Wednesday, August 19, 2020, 10:17, Adam Newsome, South Hot-Cell, Standard Operation, , , ITW Entrance Module moved to SHC 

ITW Entrance Module was moved from west station to South Hot Cell.

Entry  Tuesday, August 25, 2020, 09:38, Travis Cave, South Hot-Cell, Standard Operation, TM2, Graphite #1, Module move 

 TM#2 with Graphite #1 has been moved from the conditioning station to the south hot cell.

Entry  Wednesday, August 26, 2020, 09:52, David Wang, South Hot-Cell, Standard Operation, TM2, Ta#60, Ta#60 target electrical check and leak check at SHC. Ta_60_electrical_checklist.pdf

Electrical check and leak check at SHC. NO leak. electrical check ok.   Before target on, A is short to PQ, RU is short to HS ( 60KV bias) as we measured before.