Thursday, February 14, 2019, 14:02, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move
|
TM#2 has been moved from the conditioning station to the south hot cell. |
Tuesday, February 26, 2019, 10:33, Travis Cave, Conditioning Station, Standard Operation, TM2, no target, Module move
|
TM#2 with no source tray has been moved from the south hot cell to the conditioning station. |
Friday, March 01, 2019, 10:23, Travis Cave, Spent Target Vault, Standard Operation, , , Source tray moved
|
The old TM#2 source tray and TM#4 optics tray have been removed from the vault and placed into the spent target storage on tray 9 which is meant for source trays. |
Friday, March 15, 2019, 08:51, Travis Cave, Conditioning Station, Standard Operation, TM2, no target, Module move
|
TM#2 has been moved from the south hot cell to the conditioning station. |
Wednesday, March 20, 2019, 11:19, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move
|
TM#2 has been moved from the conditioning station to the south hot cell. |
Tuesday, March 26, 2019, 09:32, Travis Cave, Conditioning Station, Standard Operation, TM2, Dummy Target, Module move
|
TM#2 with a new source tray and the dummy target has been moved from the south hot cell to the conditioning station. |
Tuesday, March 26, 2019, 11:10, Travis Cave, Conditioning Station, Standard Operation, TM2, Dummy Target, Electrical Check
|
Electrical Check of TM#2 with the dummy target attached. |
Tuesday, March 26, 2019, 11:17, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Checks of TM#2 during the source tray change.   
|
The four electrical check done on TM#2 during the source tray change. |
Thursday, April 18, 2019, 10:04, Travis Cave, South Hot-Cell, Maintenance, , Ta#50, SiC#34, Ta#46, Ta#47, and Ta#45, Target transfer from old pail to new pail.
|
Targets Ta#50 and SiC#34 have been transferred from their old pails to new ones. Ta#50 was done on April 12th 2019 it was moved from pail #148 to pail #200 and a new field measurement was done and found to be 3.57mSv/hr. SiC#34 was done on April 18th 2019 it was moved from pail #143 to pail # 206 and a new field measurement was done and found to be 2.20mSv/hr. Both measurements were done by the RAM that is mounted at the south hot cell.
April 24 2019
Target Ta#46 has now been transferred to a new pail with a number 207 from pail 143 it was 3.62 mSv/hr when removed from the south hot cell.
April 25 2019
Target Ta#47 has now been transferred to a new pail with a number 201 from pail 137 it was 2.25mSv/hr when removed from the south hot cell. The bag that the target was in has shown signs of degradation.
Target Ta#45 has now been transferred to a new pail with a number 202 from pail 124 it was 1.45mSv/hr when removed from the south hot cell. The bag that the target was in was destroyed. Also in the pail was a shutter, IMG Gauge, some altem parts, wire and bolts.
The extraction electrode from Ta#47 was added to this pail as it was left behind from last transfer. |
Monday, April 29, 2019, 09:32, Travis Cave, Spent Target Vault, Standard Operation, , SiC#31,32 and UC#19,20,21, Spent targets moved to mini vault.
|
The following targets have been moved from the spent target vault to the mini vault:
#127 - SiC#31 (front)
#132 - SiC#32
#145 - UC#19
#150 - UC#20
#159 - UC#21 (back) |
Tuesday, April 30, 2019, 08:59, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#26, Module move
|
TM#4 with UC#26 has been moved from ITE to the south hot cell. |
Tuesday, April 30, 2019, 11:19, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#26, Electrical Check
|
Electrical check of TM#4 with UC#26 post beam at the south hot cell. See attached. |
Wednesday, May 01, 2019, 09:34, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move
|
TM#4 has now been moved to the south west silo. |
Wednesday, May 01, 2019, 10:45, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Electrical Check
|
Electrical check of the TM#4 with no target attached at the south hot cell before being moved to the south west silo. |
Thursday, May 02, 2019, 09:37, Travis Cave, Spent Target Vault, Standard Operation, , UC#26, Spent Target Move
|
The spent UC#26 target was moved from the south hot cell to the spent target vault. It was place in pail #209 and put in spot 1A in the vault and was 2.42mSv/hr upon removal from the south hot cell. |
Wednesday, May 08, 2019, 10:29, Travis Cave, South Hot-Cell, Standard Operation, , , Entrance module move
|
The entrance module has been moved from the west station to the south hot cell. |
Monday, May 13, 2019, 09:55, Travis Cave, ITW, Standard Operation, , , Entrance module move
|
The West Entrance module has been moved from the south hot cell to the west target station. |
Thursday, May 16, 2019, 14:35, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#58, Electrical Check 
|
Results of the electrical check of TM#2 without target and with the new Ta#58 target. |
Friday, May 17, 2019, 10:47, Travis Cave, ITE, Standard Operation, TM2, Ta#58, Module move
|
TM#2 with Ta#58 has been moved from the south hot cell to the east target station. |
Wednesday, May 22, 2019, 08:33, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, Module move
|
TM#1 has been moved from the north west silo to the conditioning station for the day it will be moved back to the silo tomorrow morning. |
|