  2591   Tuesday, May 14, 2024, 15:27 Carla BabcockITEDevelopmentTM3UCx#44TM3 conditioning and testing in ITETuesday, May 14, 2024, 10:26 :
Ramping up bias/EE/EL on ITE - will
see if the HV cage in the pit can hold 60kV
 Screenshot_from_2024-05-14_10-47-22.png 
  1347   Thursday, September 08, 2016, 16:28 David WangConditioning StationRepairTM3 TM3 blue insulators have been replaced.All TM3 blue insulators except Gas,EL,
and 60 KV common  on top of the module
have been replaced with new designed insulators.
  
  616   Friday, March 07, 2014, 12:45 David WangITEStandard OperationTM3 TM3 and ITE air to vacuum leak check and TM3 water lines helium test.With TM3 located in ITE, All air to vacuum
seals  on ITE primary and secondary
vacuum vessel have been leak  checked
 001.JPG002.JPG003.JPG010.JPG013.JPG 
  2611   Friday, June 14, 2024, 11:55 David WangSouth Hot-CellStandard OperationTM3UCx#44TM3 UCx#44 after operation electrical check at SHC TM3 UCx#44 after operation electrical check
at SHC . see attachment.
Carla: Looks like the short on the
 TM3_UCX#44_after_operation_electrical_check.pdf 
  769   Monday, October 20, 2014, 09:13 David WangConditioning StationDevelopmentTM3 TM3 TP2 failedTM3 TP2 stopped working this morning at
4:00 AM. I tried to start it but failed.
On normal start mode , It could not pass
  
  321   Wednesday, April 24, 2013, 11:48 chad fisherSouth Hot-CellRepairTM3 TM3 Source Tray RemovalWork on TM3 source tray removal started
at 10:40 am today.
The containment box has been removed,
  
  326   Tuesday, April 30, 2013, 07:47 chad fisherSouth Hot-CellRepairTM3 TM3 Source Tray RemovalThe source tray has sucessfully been removed
from TM3.
I will put a report in the TM3 rev
 IMG_1043[1].JPG 
  2648   Thursday, August 08, 2024, 13:58 David WangSouth Hot-CellStandard OperationTM3SiC #46TM3 SiC#46 electrical check at SHC with target on (After operation)ABCD is short to 60KV bias. Othjer are
ok.  see attachment.
Found afterwards that this short
 TM3_Sic_46_after_run_E_check.pdf 
  1510   Wednesday, April 26, 2017, 17:55 Aurelia LaxdalSouth Hot-CellRepairTM3no targetTM3 Schedule updates at the South Hot Cell and CSPlease see TM3's Updated Schedule (the
current schedule) at the SHC and TCS.
For the record I am uploading TM3's
 April_–_May_2107_TM3_Updated_Schedule_at_the_SHC_and_TCS.docxApril_–_May_2107_TM3_Initial_Schedule_at_the_SHC_and_TCS.docx 
  391   Tuesday, July 02, 2013, 09:37 chad fisherSouth Hot-CellDevelopmentTM3 TM3 Rev.2 Source Tray DisposalTm3 Rev.2 source tary has been transfered
to the vault tunnel storage.
  
  424   Thursday, August 22, 2013, 19:38 Grant MinorSouth Hot-CellRepairTM3 TM3 Rev 3 source tray - water blocks connected and torquedAfter a great struggle with the water block
jigs, the TM3 source tray was finally advanced
fully into the service tray and all water
 6x 
  431   Tuesday, August 27, 2013, 17:18 Grant MinorConditioning StationRepairTM3no targetTM3 Rev 3 source tray - prelminary leak check results at CSDavid Wang started a helium leak check
on TM3 at the CS this morning.
David will create an e-log once his
 TM3_leak_check_at_CS_27Aug2013.JPGsketch_TM3_water_feedthru_27Aug2013-1.pdf 
  425   Friday, August 23, 2013, 18:32 Grant MinorSouth Hot-CellRepairTM3 TM3 Rev 3 - steerer wire broken from connector on module sideWhile continuing on the TM3 Rev 3 source
tray installation, Chad noticed today that
one of the steerer wires is broken and has
 TM3_Broken_Steerer_Wire_Module_Side_23Aug2013.JPGTM3_Broken_Steerer_Wire_Module_Side_23Aug2013-001.JPGTM3_Broken_Steerer_Wire_Module_Side_23Aug2013-002.JPGITA2826D_RevD02_23Aug2013.pdfThermocouple-style_connector_23Aug2013.JPG 
  426   Monday, August 26, 2013, 18:22 Grant MinorSouth Hot-CellRepairTM3 TM3 Rev 3 - all connetions made except steerers, IMG, and entrance windowToday Chad finished making all connections
to the new source tray, except for:
- steerers - broken wire, must be
 8x 
  131   Thursday, June 21, 2012, 14:30 chad fisherSouth Hot-CellRepairTM3N/ATM3 Refurbishment StartStarted refurb of TM3.
Planned activities:
Inspection
  
  322   Wednesday, April 24, 2013, 14:09 chad fisherSouth Hot-CellRepairTM3 TM3 Refurbishment E.O.D. Optics tray has been removed from module.
Waterblock jig installation has commenced.
Of note, jig installation on TM3 has proven
  
  133   Monday, June 25, 2012, 07:53 chad fisherSouth Hot-CellRepairTM3N/ATM3 Refurb. WorkOn Friday, June 22 the following work was
carried out.

    Further inspection of
  
  299   Tuesday, April 16, 2013, 11:20 chad fisherSouth Hot-CellRepairTM3 TM3 Referb. startFront containment box cover has been removed
and heat shield circuit blank offs removed
in preparation for installation of dummy
 IMG_3523.JPGIMG_3524.JPG 
  1491   Wednesday, April 12, 2017, 12:51 David WangSouth Hot-CellRepairTM3 TM3 Ram readings @ SHC We have a ram installed on SHC pole
which is 0.5 meter to   module shielding
block surface. the readings we got today
  
  129   Wednesday, June 20, 2012, 11:39 Grant MinorSouth Hot-CellDevelopmentTM3N/ATM3 Planned Activites at South Hot Cell Jun 20 to 29 2012