  RH-ISAC, Page 44 of 141  Not logged in ELOG logo
ID Date Authordown Category Type Module Target/Number Subject
  1867   Thursday, February 14, 2019, 14:02 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move

 TM#2 has been moved from the conditioning station to the south hot cell.

  1877   Tuesday, February 26, 2019, 10:33 Travis CaveConditioning StationStandard OperationTM2no targetModule move

 TM#2 with no source tray has been moved from the south hot cell to the conditioning station.

  1880   Friday, March 01, 2019, 10:23 Travis CaveSpent Target VaultStandard Operation  Source tray moved

 The old TM#2 source tray and TM#4 optics tray have been removed from the vault and placed into the spent target storage on tray 9 which is meant for source trays.

  1892   Friday, March 15, 2019, 08:51 Travis CaveConditioning StationStandard OperationTM2no targetModule move

 TM#2 has been moved from the south hot cell to the conditioning station.

  1895   Wednesday, March 20, 2019, 11:19 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move

 TM#2 has been moved from the conditioning station to the south hot cell.

  1898   Tuesday, March 26, 2019, 09:32 Travis CaveConditioning StationStandard OperationTM2Dummy TargetModule move

 TM#2 with a new source tray and the dummy target has been moved from the south hot cell to the conditioning station.

  1899   Tuesday, March 26, 2019, 11:10 Travis CaveConditioning StationStandard OperationTM2Dummy TargetElectrical Check

 Electrical Check of TM#2 with the dummy target attached.

Attachment 1: Electrical_Check_TM2_Dummy__Target_CS_Mar-26-2019.pdf
Electrical_Check_TM2_Dummy__Target_CS_Mar-26-2019.pdf
  1900   Tuesday, March 26, 2019, 11:17 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Checks of TM#2 during the source tray change.

 The four electrical check done on TM#2 during the source tray change.

Attachment 1: Elecrictal_Check_TM#2_Old_source_Tray_Jan_11_2019.pdf
Elecrictal_Check_TM#2_Old_source_Tray_Jan_11_2019.pdf
Attachment 2: Electrical_Check_TM#2_No_Source_Tray_Feb_25_2019.pdf
Electrical_Check_TM#2_No_Source_Tray_Feb_25_2019.pdf
Attachment 3: Electrical_Check_TM#_New_source_Tray_Mar_22_2019.pdf
Electrical_Check_TM#_New_source_Tray_Mar_22_2019.pdf
Attachment 4: Electrical_Check_TM#2_new_source_tray_Mar_25_2019.pdf
Electrical_Check_TM#2_new_source_tray_Mar_25_2019.pdf
  1908   Thursday, April 18, 2019, 10:04 Travis CaveSouth Hot-CellMaintenance Ta#50, SiC#34, Ta#46, Ta#47, and Ta#45Target transfer from old pail to new pail.

 Targets Ta#50 and SiC#34 have been transferred from their old pails to new ones. Ta#50 was done on April 12th 2019 it was moved from pail #148 to pail #200 and a new field measurement was done and found to be 3.57mSv/hr. SiC#34 was done on April 18th 2019 it was moved from pail #143 to pail # 206 and a new field measurement was done and found to be 2.20mSv/hr. Both measurements were done by the RAM that is mounted at the south hot cell.

 

April 24 2019

Target Ta#46 has now been transferred to a new pail with a number 207 from pail 143 it was 3.62 mSv/hr when removed from the south hot cell.

 

April 25 2019

Target Ta#47 has now been transferred to a new pail with a number 201 from pail 137 it was 2.25mSv/hr when removed from the south hot cell. The bag that the target was in has shown signs of degradation.

Target Ta#45 has now been transferred to a new pail with a number 202 from pail 124 it was 1.45mSv/hr when removed from the south hot cell. The bag that the target was in was destroyed. Also in the pail was a shutter, IMG Gauge, some altem parts, wire and bolts.

The extraction electrode from Ta#47 was added to this pail as it was left behind from last transfer.

  1910   Monday, April 29, 2019, 09:32 Travis CaveSpent Target VaultStandard Operation SiC#31,32 and UC#19,20,21Spent targets moved to mini vault.

 The following targets have been moved from the spent target vault to the mini vault:

#127 - SiC#31 (front)

#132 - SiC#32 

#145 - UC#19

#150 - UC#20

#159 - UC#21 (back) 

  1911   Tuesday, April 30, 2019, 08:59 Travis CaveSouth Hot-CellStandard OperationTM4UC#26Module move

 TM#4 with UC#26 has been moved from ITE to the south hot cell.

  1912   Tuesday, April 30, 2019, 11:19 Travis CaveSouth Hot-CellStandard OperationTM4UC#26Electrical Check

 Electrical check of TM#4 with UC#26 post beam at the south hot cell. See attached.

Attachment 1: Elec_CHk_UC26_SHC_post_beam.pdf
Elec_CHk_UC26_SHC_post_beam.pdf
  1914   Wednesday, May 01, 2019, 09:34 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move

 TM#4 has now been moved to the south west silo.

  1915   Wednesday, May 01, 2019, 10:45 Travis CaveSouth Hot-CellStandard OperationTM4no targetElectrical Check

 Electrical check of the TM#4 with no target attached at the south hot cell before being moved to the south west silo.

Attachment 1: TM4_elec_chk_no_tgt_shc_may_1_2019.pdf
TM4_elec_chk_no_tgt_shc_may_1_2019.pdf
  1916   Thursday, May 02, 2019, 09:37 Travis CaveSpent Target VaultStandard Operation UC#26Spent Target Move

 The spent UC#26 target was moved from the south hot cell to the spent target vault. It was place in pail #209 and put in spot 1A in the vault and was 2.42mSv/hr upon removal from the south hot cell.

Attachment 1: Target_Index_2019-05-02.pdf
Target_Index_2019-05-02.pdf Target_Index_2019-05-02.pdf
  1917   Wednesday, May 08, 2019, 10:29 Travis CaveSouth Hot-CellStandard Operation  Entrance module move

 The entrance module has been moved from the west station to the south hot cell.

  1919   Monday, May 13, 2019, 09:55 Travis CaveITWStandard Operation  Entrance module move

 The West Entrance module has been moved from the south hot cell to the west target station.

  1923   Thursday, May 16, 2019, 14:35 Travis CaveSouth Hot-CellStandard OperationTM2Ta#58Electrical Check

 Results of the electrical check of TM#2 without target and with the new Ta#58 target.

Attachment 1: Ta#58_TM2_SHC_electrical_chk_May_16_2019.pdf
Ta#58_TM2_SHC_electrical_chk_May_16_2019.pdf
Attachment 2: Electrical_Chk_TM2_no_target_May_15_2019_SHC.pdf
Electrical_Chk_TM2_no_target_May_15_2019_SHC.pdf
  1924   Friday, May 17, 2019, 10:47 Travis CaveITEStandard OperationTM2Ta#58Module move

 TM#2 with Ta#58 has been moved from the south hot cell to the east target station.

  1926   Wednesday, May 22, 2019, 08:33 Travis CaveConditioning StationStandard OperationTM1no targetModule move

 TM#1 has been moved from the north west silo to the conditioning station for the day it will be moved back to the silo tomorrow morning.