Entry  Thursday, February 14, 2019, 14:02, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move 
 TM#2 has been moved from the conditioning station to the south hot cell.
Entry  Tuesday, February 26, 2019, 10:33, Travis Cave, Conditioning Station, Standard Operation, TM2, no target, Module move 
 TM#2 with no source tray has been moved from the south hot cell to the conditioning station.
Entry  Friday, March 01, 2019, 10:23, Travis Cave, Spent Target Vault, Standard Operation, , , Source tray moved 
 The old TM#2 source tray and TM#4 optics tray have been removed from the vault and placed into the spent target storage on tray 9 which is meant
for source trays.
Entry  Friday, March 15, 2019, 08:51, Travis Cave, Conditioning Station, Standard Operation, TM2, no target, Module move 
 TM#2 has been moved from the south hot cell to the conditioning station.
Entry  Wednesday, March 20, 2019, 11:19, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move 
 TM#2 has been moved from the conditioning station to the south hot cell.
Entry  Tuesday, March 26, 2019, 09:32, Travis Cave, Conditioning Station, Standard Operation, TM2, Dummy Target, Module move 
 TM#2 with a new source tray and the dummy target has been moved from the south hot cell to the conditioning station.
Entry  Tuesday, March 26, 2019, 11:10, Travis Cave, Conditioning Station, Standard Operation, TM2, Dummy Target, Electrical Check Electrical_Check_TM2_Dummy__Target_CS_Mar-26-2019.pdf
 Electrical Check of TM#2 with the dummy target attached.
Entry  Tuesday, March 26, 2019, 11:17, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Checks of TM#2 during the source tray change. Elecrictal_Check_TM#2_Old_source_Tray_Jan_11_2019.pdfElectrical_Check_TM#2_No_Source_Tray_Feb_25_2019.pdfElectrical_Check_TM#_New_source_Tray_Mar_22_2019.pdfElectrical_Check_TM#2_new_source_tray_Mar_25_2019.pdf
 The four electrical check done on TM#2 during the source tray change.
Entry  Thursday, April 18, 2019, 10:04, Travis Cave, South Hot-Cell, Maintenance, , Ta#50, SiC#34, Ta#46, Ta#47, and Ta#45, Target transfer from old pail to new pail. 
 Targets Ta#50 and SiC#34 have been transferred from their old pails to new ones. Ta#50 was done on April 12th 2019 it was moved from pail #148
to pail #200 and a new field measurement was done and found to be 3.57mSv/hr. SiC#34 was done on April 18th 2019 it was moved from pail #143 to pail #
206 and a new field measurement was done and found to be 2.20mSv/hr. Both measurements were done by the RAM that is mounted at the south hot cell.
Entry  Monday, April 29, 2019, 09:32, Travis Cave, Spent Target Vault, Standard Operation, , SiC#31,32 and UC#19,20,21, Spent targets moved to mini vault. 
 The following targets have been moved from the spent target vault to the mini vault:
#127 - SiC#31 (front)
#132 - SiC#32 
Entry  Tuesday, April 30, 2019, 08:59, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#26, Module move 
 TM#4 with UC#26 has been moved from ITE to the south hot cell.
Entry  Tuesday, April 30, 2019, 11:19, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#26, Electrical Check Elec_CHk_UC26_SHC_post_beam.pdf
 Electrical check of TM#4 with UC#26 post beam at the south hot cell. See attached.
Entry  Wednesday, May 01, 2019, 09:34, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move 
 TM#4 has now been moved to the south west silo.
Entry  Wednesday, May 01, 2019, 10:45, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Electrical Check TM4_elec_chk_no_tgt_shc_may_1_2019.pdf
 Electrical check of the TM#4 with no target attached at the south hot cell before being moved to the south west silo.
Entry  Thursday, May 02, 2019, 09:37, Travis Cave, Spent Target Vault, Standard Operation, , UC#26, Spent Target Move Target_Index_2019-05-02.pdf
 The spent UC#26 target was moved from the south hot cell to the spent target vault. It was place in pail #209 and put in spot 1A in the vault and
was 2.42mSv/hr upon removal from the south hot cell.
Entry  Wednesday, May 08, 2019, 10:29, Travis Cave, South Hot-Cell, Standard Operation, , , Entrance module move 
 The entrance module has been moved from the west station to the south hot cell.
Entry  Monday, May 13, 2019, 09:55, Travis Cave, ITW, Standard Operation, , , Entrance module move 
 The West Entrance module has been moved from the south hot cell to the west target station.
Entry  Thursday, May 16, 2019, 14:35, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#58, Electrical Check Ta#58_TM2_SHC_electrical_chk_May_16_2019.pdfElectrical_Chk_TM2_no_target_May_15_2019_SHC.pdf
 Results of the electrical check of TM#2 without target and with the new Ta#58 target.
Entry  Friday, May 17, 2019, 10:47, Travis Cave, ITE, Standard Operation, TM2, Ta#58, Module move 
 TM#2 with Ta#58 has been moved from the south hot cell to the east target station.
Entry  Wednesday, May 22, 2019, 08:33, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, Module move 
 TM#1 has been moved from the north west silo to the conditioning station for the day it will be moved back to the silo tomorrow morning.