1911
|
Tuesday, April 30, 2019, 08:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#26 | Module move | TM#4 with UC#26 has been moved from
ITE to the south hot cell. |
|
1912
|
Tuesday, April 30, 2019, 11:19 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#26 | Electrical Check | Electrical check of TM#4 with UC#26
post beam at the south hot cell. See attached. |
|
1914
|
Wednesday, May 01, 2019, 09:34 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move | TM#4 has now been moved to the south
west silo. |
|
1915
|
Wednesday, May 01, 2019, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical Check | Electrical check of the TM#4 with
no target attached at the south hot cell
before being moved to the south west silo. |
|
1916
|
Thursday, May 02, 2019, 09:37 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#26 | Spent Target Move | The spent UC#26 target was moved
from the south hot cell to the spent target
vault. It was place in pail #209 and put |
|
1917
|
Wednesday, May 08, 2019, 10:29 |
Travis Cave | South Hot-Cell | Standard Operation | | | Entrance module move | The entrance module has been moved
from the west station to the south hot cell. |
|
1919
|
Monday, May 13, 2019, 09:55 |
Travis Cave | ITW | Standard Operation | | | Entrance module move | The West Entrance module has been
moved from the south hot cell to the west
target station. |
|
1923
|
Thursday, May 16, 2019, 14:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#58 | Electrical Check | Results of the electrical check of
TM#2 without target and with the new Ta#58
target. |
|
1924
|
Friday, May 17, 2019, 10:47 |
Travis Cave | ITE | Standard Operation | TM2 | Ta#58 | Module move | TM#2 with Ta#58 has been moved from
the south hot cell to the east target station. |
|
1926
|
Wednesday, May 22, 2019, 08:33 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Module move | TM#1 has been moved from the north
west silo to the conditioning station for
the day it will be moved back to the silo |
|
1929
|
Thursday, May 23, 2019, 08:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module move | TM#1 has been moved from the south
hot cell to the northwest silo. |
|
1930
|
Thursday, May 23, 2019, 11:22 |
Travis Cave | South Hot-Cell | Maintenance | | | Removing garbage from the south hot cell. | A 55 Gal. drum was remotely lowered
into the south hot cell. It was then filled
with compressable waste. Then the drum was |
|
1931
|
Friday, May 24, 2019, 09:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move | TM#4 has been moved from the south
west silo to the south hot cell. |
|
1933
|
Thursday, June 06, 2019, 10:01 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target, no source Tray | Electrical Check | Results from the electrical check
of TM#4 at the south hot cell with no source
tray. R&U are shorted and when meggered |
|
1934
|
Friday, June 07, 2019, 08:56 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | no target | Module move | TM#4 has been moved from the south
hot cell to the conditioning station. |
|
1937
|
Monday, June 10, 2019, 14:13 |
Travis Cave | Spent Target Vault | Standard Operation | | | Old TM#4 source tray moved | The old TM#4 source tray in the south
hot cell was moved to the spent target vault.
The tray had a low of 7.5mSv/hr to a high |
|
1941
|
Thursday, June 13, 2019, 09:09 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target and no source tray | Module move | TM#4 has been moved from the conditioning
station to the south hot cell. The module
has no source tray. |
|
1951
|
Tuesday, July 16, 2019, 08:44 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | no target | Module move | TM4 has been moved from the conditioning
station to the south west silo. Module was
placed with the turbo pump facing south which |
|
1962
|
Wednesday, August 14, 2019, 11:43 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#58 and no target. | Results of electrical checks post beam at the south hot cell. | Here are the results of the electrical
done at the south hot cell post beam of with
the Ta#58 target attached and with just the |
|
1964
|
Thursday, August 15, 2019, 09:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | Electrical Check | Electrical of TM#2 with ZrC#8 at
the south hot cell. See attached for details. |
|