Entry  Tuesday, November 06, 2018, 10:59, Travis Cave, ITW, Standard Operation, TM2, UC#25, Module move 

 TM#2 with UC#25 has been moved from the conditioning station to the west target station.

Entry  Tuesday, November 27, 2018, 11:05, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#57, Module move 

 TM#4 with Ta#57 has been moved from the east target station to the south hot cell.

Entry  Wednesday, November 28, 2018, 11:31, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#57 and UC#26, Electrical Check Elec_Chk_Ta57_Post_Beam_SHC_11-28-28.pdfElec_Chk_TM4_no_tgt_SHC_11-28-18.pdfElec_Chk_UC26_SHC_11-28-18.pdfElec_Chk_UC26_IGLIS_part_SHC_11-28-18.pdf

 Electrical check of TM#4 with the old Ta#57, no target and with new IG-LIS UC#26 target. See attached PDF for details.

Entry  Wednesday, November 28, 2018, 13:38, Travis Cave, Conditioning Station, Standard Operation, TM4, UC#26, Module move 

 TM#4 with UC#26 has been moved from the south hot cell to the conditioning station.

Entry  Friday, November 30, 2018, 10:28, Travis Cave, Spent Target Vault, Standard Operation, , Ta#57, Spent Target Move Target_Index_2018-11-30.pdf

 The spent Ta#57 target has been moved from the south hot cell to the spent target storage it was placed in pail 174 and placed in spot 8C in the vault. See attached PDF for details.

Entry  Tuesday, December 04, 2018, 10:26, Travis Cave, ITE, Standard Operation, TM4, UC#26, Module move 

 TM#4 with UC#26 has been moved from the conditioning station to the east target station.

Entry  Wednesday, January 09, 2019, 10:47, Travis Cave, South Hot-Cell, Standard Operation, TM2, UC#25, Module move 

 TM#4 with UC#25 has been moved from ITW to the south hot cell.

Entry  Wednesday, January 09, 2019, 13:08, Travis Cave, South Hot-Cell, Standard Operation, TM2, UC#25, Electrical Check Electrical_Chk_TM#2_UC#25_post_beam_Jan-09-2019.pdf

 Electrical check of the target module with the UC#25 attached after the beam run.

Entry  Thursday, January 10, 2019, 09:26, Travis Cave, Conditioning Station, Standard Operation, TM2, no target, Module move 

 TM#2 has been moved from the south hot cell to the conditioning station.

Entry  Friday, January 11, 2019, 11:26, Travis Cave, Spent Target Vault, Standard Operation, , UC#25, Spent Target Move Target_Index_2019-01-11.pdf

 The spent target in the south hot cell has been moved to the spent target vault. It was placed in pail 204 and placed in spot 6B. The pail is made of thicker steel and thus will not need to be repackaged later.  The ISAC spent target vault is full there is no more room for any more targets.

Entry  Thursday, February 14, 2019, 14:02, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move 

 TM#2 has been moved from the conditioning station to the south hot cell.

Entry  Tuesday, February 26, 2019, 10:33, Travis Cave, Conditioning Station, Standard Operation, TM2, no target, Module move 

 TM#2 with no source tray has been moved from the south hot cell to the conditioning station.

Entry  Friday, March 01, 2019, 10:23, Travis Cave, Spent Target Vault, Standard Operation, , , Source tray moved 

 The old TM#2 source tray and TM#4 optics tray have been removed from the vault and placed into the spent target storage on tray 9 which is meant for source trays.

Entry  Friday, March 15, 2019, 08:51, Travis Cave, Conditioning Station, Standard Operation, TM2, no target, Module move 

 TM#2 has been moved from the south hot cell to the conditioning station.

Entry  Wednesday, March 20, 2019, 11:19, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move 

 TM#2 has been moved from the conditioning station to the south hot cell.

Entry  Tuesday, March 26, 2019, 09:32, Travis Cave, Conditioning Station, Standard Operation, TM2, Dummy Target, Module move 

 TM#2 with a new source tray and the dummy target has been moved from the south hot cell to the conditioning station.

Entry  Tuesday, March 26, 2019, 11:10, Travis Cave, Conditioning Station, Standard Operation, TM2, Dummy Target, Electrical Check Electrical_Check_TM2_Dummy__Target_CS_Mar-26-2019.pdf

 Electrical Check of TM#2 with the dummy target attached.

Entry  Tuesday, March 26, 2019, 11:17, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Checks of TM#2 during the source tray change. Elecrictal_Check_TM#2_Old_source_Tray_Jan_11_2019.pdfElectrical_Check_TM#2_No_Source_Tray_Feb_25_2019.pdfElectrical_Check_TM#_New_source_Tray_Mar_22_2019.pdfElectrical_Check_TM#2_new_source_tray_Mar_25_2019.pdf

 The four electrical check done on TM#2 during the source tray change.

Entry  Thursday, April 18, 2019, 10:04, Travis Cave, South Hot-Cell, Maintenance, , Ta#50, SiC#34, Ta#46, Ta#47, and Ta#45, Target transfer from old pail to new pail. 

 Targets Ta#50 and SiC#34 have been transferred from their old pails to new ones. Ta#50 was done on April 12th 2019 it was moved from pail #148 to pail #200 and a new field measurement was done and found to be 3.57mSv/hr. SiC#34 was done on April 18th 2019 it was moved from pail #143 to pail # 206 and a new field measurement was done and found to be 2.20mSv/hr. Both measurements were done by the RAM that is mounted at the south hot cell.

 

April 24 2019

Target Ta#46 has now been transferred to a new pail with a number 207 from pail 143 it was 3.62 mSv/hr when removed from the south hot cell.

 

April 25 2019

Target Ta#47 has now been transferred to a new pail with a number 201 from pail 137 it was 2.25mSv/hr when removed from the south hot cell. The bag that the target was in has shown signs of degradation.

Target Ta#45 has now been transferred to a new pail with a number 202 from pail 124 it was 1.45mSv/hr when removed from the south hot cell. The bag that the target was in was destroyed. Also in the pail was a shutter, IMG Gauge, some altem parts, wire and bolts.

The extraction electrode from Ta#47 was added to this pail as it was left behind from last transfer.

Entry  Monday, April 29, 2019, 09:32, Travis Cave, Spent Target Vault, Standard Operation, , SiC#31,32 and UC#19,20,21, Spent targets moved to mini vault. 

 The following targets have been moved from the spent target vault to the mini vault:

#127 - SiC#31 (front)

#132 - SiC#32 

#145 - UC#19

#150 - UC#20

#159 - UC#21 (back) 