ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  1818   Tuesday, November 06, 2018, 10:59 Travis CaveITWStandard OperationTM2UC#25Module move TM#2 with UC#25 has been moved from
the conditioning station to the west target
station.
  
  1827   Tuesday, November 27, 2018, 11:05 Travis CaveSouth Hot-CellStandard OperationTM4Ta#57Module move TM#4 with Ta#57 has been moved from
the east target station to the south hot
cell.
  
  1831   Wednesday, November 28, 2018, 11:31 Travis CaveSouth Hot-CellStandard OperationTM4Ta#57 and UC#26Electrical Check Electrical check of TM#4 with the
old Ta#57, no target and with new IG-LIS
UC#26 target. See attached PDF for details.
 Elec_Chk_Ta57_Post_Beam_SHC_11-28-28.pdfElec_Chk_TM4_no_tgt_SHC_11-28-18.pdfElec_Chk_UC26_SHC_11-28-18.pdfElec_Chk_UC26_IGLIS_part_SHC_11-28-18.pdf 
  1832   Wednesday, November 28, 2018, 13:38 Travis CaveConditioning StationStandard OperationTM4UC#26Module move TM#4 with UC#26 has been moved from
the south hot cell to the conditioning station.
  
  1834   Friday, November 30, 2018, 10:28 Travis CaveSpent Target VaultStandard Operation Ta#57Spent Target Move The spent Ta#57 target has been moved
from the south hot cell to the spent target
storage it was placed in pail 174 and placed
 Target_Index_2018-11-30.pdf 
  1835   Tuesday, December 04, 2018, 10:26 Travis CaveITEStandard OperationTM4UC#26Module move TM#4 with UC#26 has been moved from
the conditioning station to the east target
station.
  
  1850   Wednesday, January 09, 2019, 10:47 Travis CaveSouth Hot-CellStandard OperationTM2UC#25Module move TM#4 with UC#25 has been moved from
ITW to the south hot cell.
  
  1851   Wednesday, January 09, 2019, 13:08 Travis CaveSouth Hot-CellStandard OperationTM2UC#25Electrical Check Electrical check of the target module
with the UC#25 attached after the beam run.
 Electrical_Chk_TM#2_UC#25_post_beam_Jan-09-2019.pdf 
  1853   Thursday, January 10, 2019, 09:26 Travis CaveConditioning StationStandard OperationTM2no targetModule move TM#2 has been moved from the south
hot cell to the conditioning station.
  
  1855   Friday, January 11, 2019, 11:26 Travis CaveSpent Target VaultStandard Operation UC#25Spent Target Move The spent target in the south hot
cell has been moved to the spent target vault.
It was placed in pail 204 and placed in spot
 Target_Index_2019-01-11.pdf 
  1867   Thursday, February 14, 2019, 14:02 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move TM#2 has been moved from the conditioning
station to the south hot cell.
  
  1877   Tuesday, February 26, 2019, 10:33 Travis CaveConditioning StationStandard OperationTM2no targetModule move TM#2 with no source tray has been
moved from the south hot cell to the conditioning
station.
  
  1880   Friday, March 01, 2019, 10:23 Travis CaveSpent Target VaultStandard Operation  Source tray moved The old TM#2 source tray and TM#4
optics tray have been removed from the vault
and placed into the spent target storage
  
  1892   Friday, March 15, 2019, 08:51 Travis CaveConditioning StationStandard OperationTM2no targetModule move TM#2 has been moved from the south
hot cell to the conditioning station.
  
  1895   Wednesday, March 20, 2019, 11:19 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move TM#2 has been moved from the conditioning
station to the south hot cell.
  
  1898   Tuesday, March 26, 2019, 09:32 Travis CaveConditioning StationStandard OperationTM2Dummy TargetModule move TM#2 with a new source tray and the
dummy target has been moved from the south
hot cell to the conditioning station.
  
  1899   Tuesday, March 26, 2019, 11:10 Travis CaveConditioning StationStandard OperationTM2Dummy TargetElectrical Check Electrical Check of TM#2 with the
dummy target attached.
 Electrical_Check_TM2_Dummy__Target_CS_Mar-26-2019.pdf 
  1900   Tuesday, March 26, 2019, 11:17 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Checks of TM#2 during the source tray change. The four electrical check done on
TM#2 during the source tray change.
 Elecrictal_Check_TM#2_Old_source_Tray_Jan_11_2019.pdfElectrical_Check_TM#2_No_Source_Tray_Feb_25_2019.pdfElectrical_Check_TM#_New_source_Tray_Mar_22_2019.pdfElectrical_Check_TM#2_new_source_tray_Mar_25_2019.pdf 
  1908   Thursday, April 18, 2019, 10:04 Travis CaveSouth Hot-CellMaintenance Ta#50, SiC#34, Ta#46, Ta#47, and Ta#45Target transfer from old pail to new pail. Targets Ta#50 and SiC#34 have been
transferred from their old pails to new ones.
Ta#50 was done on April 12th 2019 it was
  
  1910   Monday, April 29, 2019, 09:32 Travis CaveSpent Target VaultStandard Operation SiC#31,32 and UC#19,20,21Spent targets moved to mini vault. The following targets have been moved
from the spent target vault to the mini vault:
#127 - SiC#31 (front)
  