1608
|
Wednesday, August 30, 2017, 11:37 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#52 | Spent Target move | The spent Ta#52 target has been moved from
the south hot cell to the spent target vault.
See attached PDF for details. |
|
|
1486
|
Tuesday, April 11, 2017, 11:30 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#51 | Electrical Check | Electrical check performed on TM#2 with
Ta#51, see attached PDF. |
|
|
1487
|
Tuesday, April 11, 2017, 14:02 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | Ta#51 | module moved | TM#2 with Ta#51 has been moved from the
south hot cell to the conditioning station. |
|
|
1496
|
Thursday, April 13, 2017, 11:44 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | Ta#51 | Conditioning Ta#51 | Thursday, April 13, 2017, 11:43:
Water package started. |
|
|
1908
|
Thursday, April 18, 2019, 10:04 |
Travis Cave | South Hot-Cell | Maintenance | | Ta#50, SiC#34, Ta#46, Ta#47, and Ta#45 | Target transfer from old pail to new pail. | Targets Ta#50 and SiC#34 have been
transferred from their old pails to new ones.
Ta#50 was done on April 12th 2019 it was |
|
|
1429
|
Friday, January 27, 2017, 08:46 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#50 | Ta#50 Removed | Ta#50 has been was removed from TM4 on
Wednesday, January 25th. |
|
|
1388
|
Wednesday, November 02, 2016, 09:12 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#50 | module moved | TM#4 with Ta#50 has been moved from the
south hot cell to the conditioning station. |
|
|
1394
|
Tuesday, November 08, 2016, 10:23 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#50 | module moved | TM#4 with Ta#50 has been moved to the east
target station. |
|
|
1428
|
Friday, January 27, 2017, 08:44 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | Ta#50 | UCx #18 - Ta Feibiad Dummy installed. Target Change Waterline interference | On Tuesday, January 24th UCx#18 was removed
from TM2 and Ta febiad dummy installed. I
encountered the same issue mounting the new |
|
|
2047
|
Monday, January 13, 2020, 14:19 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#49 and Ta#52 | spent target repackaging and moved to mini vault. | Targeta Ta#49 and Ta#52 have been
repackaged anf moved to the mini vault. Ta#49
was taken out of pail number 146 and placed |
|
|
1334
|
Wednesday, August 24, 2016, 11:06 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#49 | module moved and electrical check | TM#2 with Ta#49 has had its electrical
check and was moved to the conditioning station.
see the attached pdf for the electrical check |
|
|
1336
|
Wednesday, August 24, 2016, 14:42 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | Ta#49 | Conditioning | Wednesday, August 24, 2016, 14:42: RGA
on
Wednesday, August 24, 2016, 20:27: |
|
|
1342
|
Tuesday, August 30, 2016, 10:35 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#49 | module moved | TM#2 with Ta#49 has been moved to the west
target station from the conditioning station. |
|
|
1369
|
Tuesday, October 11, 2016, 10:36 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#49 | module moved | TM#2 with Ta#49 has been moved from the
west target station to the south hot cell. |
|
|
1373
|
Thursday, October 20, 2016, 10:45 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#49 | Spent Target move | Ta#49 has been removed from the south hot
cell and placed in the storage vault. It
is in pail 146 and in spot 6A. |
|
|
1376
|
Friday, October 21, 2016, 15:10 |
Anders Mjos | South Hot-Cell | Repair | TM2 | Ta#49 | Stuck TGHT clamp bolt removal | During target removal on Wednesday October
12th, the left target heater conductor bolt
(ITD0058) could not be removed. The bolt |
|
|
2159
|
Friday, October 30, 2020, 09:02 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#48,51,54 SiC#35, and UC#25 | Repacking of the targets. | Targets Ta#48,51,54 SiC#35,
and UC#25 were repacked and placed in the
mini vault. In the following order back to |
|
|
1274
|
Wednesday, July 06, 2016, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#48 and SiC#33 | Electrical Check | Electrical check done on TM#2 with Ta#48,
no target and SiC#33 the short on the coils
to 60kV is still present it is on the R-U |
|
|
1225
|
Tuesday, May 10, 2016, 13:37 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | Ta#48 | Ta#48 Installation | Ta#48 has been installed onto TM2. Also
new window gaskets were installed.
High current fasteners were torqued |
|
|
1227
|
Tuesday, May 10, 2016, 14:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#48 | Electrical Check | Electrical check of TM#2 with Ta#48 attached.
See the attached PDF for details. |
|