1774
|
Thursday, August 30, 2018, 14:16 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#56, UC#24, and no target | Electrical Check |
Results of the electrical check with the spent Ta#56 attached, no target attached and the UC#24 attached. These test were performed on TM#4. |
Attachment 1: TM#4_Ta#56_Electrical_Check_Post_Beam_at_SHC.pdf
|
|
Attachment 2: TM#4_No_Target_Electrical_Check_Aug-29-2018.pdf
|
|
Attachment 3: TM#4_UC#24_Electrical_Check_SHC.pdf
|
|
1776
|
Tuesday, September 04, 2018, 09:57 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#24 | Module move |
TM#4 with UC#24 has been moved from the conditioning station to the east target station. |
1777
|
Thursday, September 06, 2018, 10:25 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#34, Ta#45,46,47, 50 | Spent Target Move |
Targets SiC#34 , Ta#45,46,47,50 have been moved from the spent target vault to the mini vault. |
1783
|
Friday, September 14, 2018, 09:39 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move |
TM#3 with no target has been moved from the north east silo to the conditioning station. |
1784
|
Tuesday, September 18, 2018, 12:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | UC#23 | Module move |
TM#2 with UC#23 has been moved from ITW to the south hot cell. The shield plug was also installed remotely as well. |
1785
|
Thursday, September 20, 2018, 08:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Check |
Results of the electrical check on TM#2 with no target after Chad cleaned out the bolt hole on the module where the target mounts. |
Attachment 1: Electrical_Chk_TM2_no_tgt_Sept-20-2018.pdf
|
|
1786
|
Thursday, September 20, 2018, 14:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | nSiC#1 | Electrical Check |
TM#2 with the nSiC#1 target had its check done on it at the south hot cell see attached for results. |
Attachment 1: Electrical_Chk_TM2_SHC_nSiC#1_Sept-20-2018.pdf
|
|
1787
|
Thursday, September 20, 2018, 14:36 |
Travis Cave | ITW | Standard Operation | TM2 | nSiC#1 | Module move |
TM#2 with nSiC#1 has been moved from the south hot cell to the west target station. |
1791
|
Monday, September 24, 2018, 14:50 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#23 | Spent Target Move |
The spent UC#23 target has been moved from the south hot cell to the spent target storage. It was placed in pail #170 and place in spot #4B in the vault. |
1796
|
Thursday, September 27, 2018, 13:58 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move |
TM#3 has been moved from the conditioning station to the centre east silo. This will be its new home after the silo switcher-roo. |
1798
|
Tuesday, October 02, 2018, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#24 | Module move |
TM#4 with UC#24 has been moved from the east target station to the south hot cell. |
1800
|
Friday, October 05, 2018, 14:41 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#24 | Spent Target Move |
UC#24 has been moved from the south hot cell to the spent target vault. The target is in pail #171 and placed in spot 4C. See attached PDF for details. |
Attachment 1: Target_Index_2018-10-05.pdf
|
|
1802
|
Tuesday, October 09, 2018, 13:46 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#57 | Module move |
TM#4 with Ta#57 has been moved from the conditioning station to the east target station. |
1804
|
Wednesday, October 10, 2018, 10:50 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#57 | Electrical Check |
The various electrical check done on TM#4 after the UC run and before the start of the Ta run. |
Attachment 1: TM#4_UC#24_Electrical_Check_SHC.pdf
|
|
Attachment 2: TM#4_Elec_Chk_No_Target_Oct-3-2018.pdf
|
|
Attachment 3: TM#4_Elec_Chk_SHC_Ta#57.pdf
|
|
1805
|
Monday, October 22, 2018, 14:05 |
Travis Cave | ITW | Repair | | | Module move |
ITW Exit #2 has been moved from the west station to the south hot cell for a bellows repair. |
1810
|
Friday, October 26, 2018, 09:44 |
Travis Cave | Conditioning Station | Standard Operation | | | Exit Module moved |
The west exit #2 module has been moved from the south hot cell to the conditioning station. |
1812
|
Tuesday, October 30, 2018, 10:50 |
Travis Cave | ITW | Standard Operation | TM2 | nSiC#1 | Modules moved |
Modules were moved, ITW EX2 was moved from the conditioning station to the west target station and TM#2 ,with nSiC#1, was moved from the west target station to the south hot cell. |
1813
|
Wednesday, October 31, 2018, 14:20 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | UC#25 | Module move |
TM#2 with UC#25 has been moved from the south hot cell to the conditioning station. |
1814
|
Wednesday, October 31, 2018, 14:23 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | nSiC#1 and UC#25 | Electrical Check |
TM#2 with targets nSiC#1 (old target) and UC#25 (new target) electrical check results. See attached for details. |
Attachment 1: Electrical_Chk__TM#2_nSiC#1_SHC_Post_Beam_Oct-31-2018.pdf
|
|
Attachment 2: Electrical_Chk_TM#2_UC#25_SHC_Oct-31-2018.pdf
|
|
1816
|
Monday, November 05, 2018, 08:24 |
Travis Cave | Spent Target Vault | Standard Operation | | nSiC#1 | Spent Target Move |
The spent nSiC#1 target has been moved from the south hot cell to the spent target vault. It was placed in pail #172 and placed in spot 7B. See attached PDF for vault details. |
Attachment 1: Target_Index_2018-11-02.pdf
|
|