ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  348   Wednesday, May 15, 2013, 16:51 Bevan MossConditioning StationStandard OperationTM3No Source TrayRepeat of HV Test The HV test completed on Monday was
repeated today over a much longer time period.
By taking longer there was slightly less
 150502013_TM3_No_Source_Tray.xlsx 
  349   Wednesday, May 15, 2013, 17:32 Bevan MossConditioning StationStandard OperationTM3 TM3 in place but not connected To confirm that the sparking was
coming from the module rather than the conditioning
station TM3 was grounded and the conditioning
 15052013_TM3_in_place_but_not_connected.xlsx 
  350   Wednesday, May 15, 2013, 18:12 Bevan MossConditioning StationStandard OperationTM3No source trayHV test repeat After discussion with Friedhelm it
was decided to continue trying to condition
the module today before moving it tomorrow.
 15052013_TM3_HV_test_repeat.xlsx 
  352   Friday, May 17, 2013, 12:02 Travis CaveConditioning StationStandard OperationTM3 module moveTM#3 with no target or source trays has
been moved from the conditioning station
to the NE silo.
  
  354   Tuesday, May 21, 2013, 11:52 Bevan MossConditioning StationStandard OperationTM3No Source TrayMay 16th Long HV conditioningOn May 16th 2013 the module was HV conditioned
all day. As a result the maximum stable voltage
has been increased to about 47kV (~4kV more
 16052013_TM3_long_HV_conditioning.xlsx 
  378   Thursday, June 13, 2013, 09:18 chad fisherSouth Hot-CellRepairTM3 Source Tray/Extraction Column RemovalTM3 Rev 2 source tray/extraction column
insertion into its storage was completed
yesterday and it was then removed from the
  
  380   Tuesday, June 18, 2013, 14:00 chad fisherSouth Hot-CellDevelopmentTM3 Mock-up testing / water block connectionsThe testing of the mock-up and tooling
has commenced.
Source tray mock-up has been driven
  
  381   Wednesday, June 19, 2013, 08:15 chad fisherSouth Hot-CellDevelopmentTM3 Mock up water block connectionsAll water block connections on the mock-up
have bben achieved. It is now ready for leak
checking.
 20130619_080806[1].jpg20130619_080808[1].jpg 
  383   Friday, June 21, 2013, 09:26 chad fisherSouth Hot-CellDevelopmentTM3 Mock-up Leak Check ResultsThe Mock-up has been leak tested after
the remote connection of the water blocks
and is leak tight!
  
  391   Tuesday, July 02, 2013, 09:37 chad fisherSouth Hot-CellDevelopmentTM3 TM3 Rev.2 Source Tray DisposalTm3 Rev.2 source tary has been transfered
to the vault tunnel storage.
  
  395   Wednesday, July 03, 2013, 10:43 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target and no source tray
was moved from the north east silo to the
south hot cell the move went well.
  
  397   Friday, July 05, 2013, 09:22 chad fisherSouth Hot-CellRepairTM3 Service Tray Water Block InspectionI have inspected the service tray water
block and suggest that they SHOULD be cleaned/polished
before we install the new source tray.
  
  398   Friday, July 05, 2013, 10:02 Bevan MossConditioning StationStandard OperationTM3No source trayTM3 module move to TCSTM3 has been moved from the south hot cell
to the conditioning station. David and I
completed the move. All went well.
  
  401   Wednesday, July 17, 2013, 08:29 David WangConditioning StationDevelopmentTM3 TM3 leak check in CS without source tray.Leak checked TM3 without source tray in
CS this morning. The CS and TM3 vacuum: IG1(top
of the TM3 service cap)4.9x E-7Torr, IG2(diagnostic
  
  402   Wednesday, July 17, 2013, 10:10 David WangConditioning StationDevelopmentTM3 CS cooling and vacuum system have been turned off CS water cooling and vacuum system have
been turned off at 10:00 AM this morning.The
TM3 will be disconnected and moved to silo
  
  403   Thursday, July 18, 2013, 10:08 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 with no target and no source tray
has been moved from the conditioning station
to the north east silo, move went well.
  
  404   Monday, July 22, 2013, 15:52 Bevan MossConditioning StationStandard OperationTM3No Source TrayHV testing update   I have fallen behind on the
HV testing that has been completed on TM3.
Data can be found on docushare in the TM3
  
  418   Wednesday, August 14, 2013, 11:50 Travis CaveSouth Hot-CellMaintenanceTM3 module moveTM#3 and its new source tray have been
both moved into the south hot cell.
  
  420   Thursday, August 15, 2013, 09:32 chad fisherSouth Hot-CellRepairTM3 TM3 source tray installation status 
The installation of the module
side water block jig has been successful.
 
During
  
  423   Wednesday, August 21, 2013, 20:36 Grant MinorSouth Hot-CellRepairTM3 TM3 module-side water block sealing surface inspection (post polishing)The water block sealing surfaces on the
module-side of TM3 were polished this week
by Chad Fisher, using his air-ratchet controlled
 TM3_final_water_block_polishing_16-048.JPGTM3_final_water_block_polishing_16-031.JPG 