ID Date Author Categorydown Type Module Target/Number Subject
  583   Monday, January 20, 2014, 13:40 maicodallavalleSpent Target VaultMaintenance F-308Empty F-308s

Four empty F-308s just arrived back at Triumf. I moved them  from shipping to the Remote Handling Shop for service and inspection. I will work on them when not busy with my other shutdown work. ( Cyclotron work)

  587   Wednesday, January 22, 2014, 15:00 Travis CaveSpent Target VaultStandard Operation UC#8Spent target move

UC#8 has been moved from the south hot cell to the vault storage. It was placed in pail 113 and placed in slot 8A of the vault. The field was 9.2mSv/hr upon removal from the south hot cell.

Attachment 1: Vault_Storage_January_22_2014.pdf
Vault_Storage_January_22_2014.pdf Vault_Storage_January_22_2014.pdf Vault_Storage_January_22_2014.pdf Vault_Storage_January_22_2014.pdf
  590   Monday, February 03, 2014, 14:45 Travis CaveSpent Target VaultStandard Operation  Spent targets to mini storage and the F-308s to the Target Hall

Targets NiO#1(101), Nb#5(85), TaC#1(92), and ZrC#5(81) have been moved from the storage vault and placed in the mini storage. The F-308 flasks have also been moved in to the target hall as well. The attached are the current statuses of both vaults.

Attachment 1: Vault_Storage_February_3_2014.pdf
Vault_Storage_February_3_2014.pdf Vault_Storage_February_3_2014.pdf Vault_Storage_February_3_2014.pdf Vault_Storage_February_3_2014.pdf
Attachment 2: Mini_Vault_Storage_February_3_2014.pdf
Mini_Vault_Storage_February_3_2014.pdf Mini_Vault_Storage_February_3_2014.pdf Mini_Vault_Storage_February_3_2014.pdf Mini_Vault_Storage_February_3_2014.pdf
  594   Wednesday, February 05, 2014, 14:12 Travis CaveSpent Target VaultStandard Operation  Targets moved from mini storage to F-308s

All targets in the mini storage (4) have been moved from there and placed into the F-308s and those have been moved to the mech services room.

  653   Wednesday, April 30, 2014, 12:03 Travis CaveSpent Target VaultStandard Operation 2A3 windowWindow now in vault

The 2A3 window now has a lid, and lift yolk on it and it has been installed in the spent target vault in spot 2A. The lid is a normal unmodified and has no sealant on it.

Attachment 1: Vault_Storage_April_30_2014.pdf
Vault_Storage_April_30_2014.pdf Vault_Storage_April_30_2014.pdf Vault_Storage_April_30_2014.pdf Vault_Storage_April_30_2014.pdf
  662   Wednesday, May 21, 2014, 13:56 Travis CaveSpent Target VaultStandard Operation  Spent target assay

All targets in the vault have been assayed and measured. Results will be posted soon.

  663   Wednesday, May 21, 2014, 13:56 Travis CaveSpent Target VaultStandard Operation  Spent target assay

All targets in the vault have been assayed and measured. Results will be posted soon.

Results of assay are now attached in a new layout.

Attachment 1: Vault_Storage_May_22_2014.pdf
Vault_Storage_May_22_2014.pdf Vault_Storage_May_22_2014.pdf Vault_Storage_May_22_2014.pdf Vault_Storage_May_22_2014.pdf
  664   Tuesday, May 27, 2014, 09:38 maicodallavalleSpent Target VaultMaintenance F-308 Maintenance F-308 Maintenance

All the F-308's can back from being certified at Nordion.  All of the F-308's have been serviced and are ready to be filled with spent targets.

  665   Tuesday, May 27, 2014, 09:42 maicodallavalleSpent Target VaultMaintenance  F-308 Maintenance

All of the serviced F-308's have been moved to the South Hot cell area.

  669   Friday, May 30, 2014, 09:41 Travis CaveSpent Target VaultStandard Operation Ta#42Spent target move

Ta#42 in pail #114 has been moved from the south hot cell to the spent target storage vault and place in spot 7B. The target was 277mSv/hr upon removal from the south hot cell. See attached PDF of vault status.

Attachment 1: Vault_Storage_May_30_2014.pdf
Vault_Storage_May_30_2014.pdf Vault_Storage_May_30_2014.pdf Vault_Storage_May_30_2014.pdf Vault_Storage_May_30_2014.pdf
  681   Thursday, June 12, 2014, 09:42 Travis CaveSpent Target VaultStandard Operation  Targets moved from mini storage to F-308s

Five targets have been moved from the spent target storage to the mini storage. The targets that were moved are UCx #'s 6,7,8 , SiC #28, and Nb #6.

Attachment 1: Vault_Storage_June_12_2014.pdf
Vault_Storage_June_12_2014.pdf Vault_Storage_June_12_2014.pdf Vault_Storage_June_12_2014.pdf Vault_Storage_June_12_2014.pdf
Attachment 2: Mini_Vault_Storage_June_12_2014.pdf
Mini_Vault_Storage_June_12_2014.pdf Mini_Vault_Storage_June_12_2014.pdf Mini_Vault_Storage_June_12_2014.pdf Mini_Vault_Storage_June_12_2014.pdf
  685   Tuesday, June 24, 2014, 11:33 maicodallavalleSpent Target VaultStandard Operation  F-308 Maintenance

Five F - 308 flasks containing five ISAC spent targets were moved from the anteroom into the south hot cell area. When the F - 308's were in the south hot cell area the rest of the bolts were installed on all the top covers. All the bolts were torqued and all the cable locks were also installed. All F - 308's  were then moved into the Active Services Area.

  742   Friday, September 05, 2014, 13:07 Travis CaveSpent Target VaultStandard Operation Ta#43Spent target move

Ta#43 has been moved from the south hot cell to the spent target vault. See attached PDF for details.

Attachment 1: Vault_Storage_September_5_2014.pdf
Vault_Storage_September_5_2014.pdf Vault_Storage_September_5_2014.pdf Vault_Storage_September_5_2014.pdf Vault_Storage_September_5_2014.pdf
  747   Friday, September 12, 2014, 14:21 Travis CaveSpent Target VaultStandard Operation  Spent target field measurements

Five of the ten target we want to measure the fields on were done today. We will finish up on Monday, and the spent target storage spreadsheet will be updated then.

  748   Monday, September 15, 2014, 11:23 Travis CaveSpent Target VaultStandard Operation  Spent target field measurements

Field measurements on the spent target has finished see the attached PDF for details.

Attachment 1: Vault_Storage_September_15_2014.pdf
Vault_Storage_September_15_2014.pdf Vault_Storage_September_15_2014.pdf Vault_Storage_September_15_2014.pdf Vault_Storage_September_15_2014.pdf
  757   Friday, September 26, 2014, 10:56 Travis CaveSpent Target VaultStandard Operation UC#10Spent target move

UC#10 has been moved from the south hot cell to the spent target vault. It was placed in Pail #119 and in slot 8B. For further details see attached PDF.

Attachment 1: Vault_Storage_September_26_2014.pdf
Vault_Storage_September_26_2014.pdf Vault_Storage_September_26_2014.pdf Vault_Storage_September_26_2014.pdf Vault_Storage_September_26_2014.pdf
  772   Tuesday, October 21, 2014, 14:53 Travis CaveSpent Target VaultStandard Operation ZrC#6Spent target move

ZrC#6 has been moved from the south hot cell and into storage. It was placed in pail 120 in slot 5C of the vault. For more details see PDF.

Attachment 1: Vault_Storage_October_21_2014.pdf
Vault_Storage_October_21_2014.pdf Vault_Storage_October_21_2014.pdf Vault_Storage_October_21_2014.pdf Vault_Storage_October_21_2014.pdf
  799   Friday, November 21, 2014, 10:40 Travis CaveSpent Target VaultStandard Operation Ta#44Spent target move

The spent Ta#44 target has been removed from the south hot cell, it was placed in pail #121 and placed in spot 4A of the storage vault. It was 276mSv/hr upon removal from the south hot cell.

Attachment 1: Vault_Storage_November_21_2014.pdf
Vault_Storage_November_21_2014.pdf Vault_Storage_November_21_2014.pdf Vault_Storage_November_21_2014.pdf Vault_Storage_November_21_2014.pdf
  802   Wednesday, November 26, 2014, 11:11 Travis CaveSpent Target VaultStandard Operation Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29Spent targets moved to mini storage

The following targets have been moved to the mini storage from the target storage vault:

  1. Ta#38
  2. Nb#7
  3. TiC#3
  4. SiC#29
  5. NiO#2

These target will be removed from the mini storage and placed into the F-308's on December 3rd.

  804   Monday, December 01, 2014, 12:05 maicodallavalleSpent Target VaultMaintenance  F-308 Maintenance

F-308's have been serviced and are ready to be filled with spent targets. F-308's witch were serviced are #6,#13,#15,#16,and #19.