  RH-ISAC, Page 39 of 141  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Module Target/Numberdown Subject
  2281   Tuesday, November 30, 2021, 12:51 David WangITEStandard OperationTM4Ta#63.Tm4 has been connected in ITE.

TM4 has been connected in ITE. See attachment for checklist.

Attachment 1: from_my_cellphone_2598_647.jpg
from_my_cellphone_2598_647.jpg
Attachment 2: from_my_cellphone_2598_648.jpg
from_my_cellphone_2598_648.jpg
Attachment 3: from_my_cellphone_2598_649.jpg
from_my_cellphone_2598_649.jpg
Attachment 4: from_my_cellphone_2598_650.jpg
from_my_cellphone_2598_650.jpg
  2297   Thursday, January 20, 2022, 11:09 Travis CaveSpent Target VaultStandard Operation Ta#63Spent Target Move
The spent Ta#63 has been moved from the north hot cell to the spent target vault. It was place in pail#266 and 
placed in spot #3B of the vault. see attached PDF for more details.
Attachment 1: Target_Index_2022-01-20.pdf
Target_Index_2022-01-20.pdf
  2232   Thursday, July 08, 2021, 11:36 David WangConditioning StationStandard OperationTM4Ta#62Remotely remove TM4(Ta#62) from SHC to TCS.

Remotely remove TM4 (ta# 62) from SHC to TCS.  The moving is smooth.

  2233   Thursday, July 08, 2021, 11:45 David WangSouth Hot-CellStandard OperationTM4Ta#62TM4 Ta#62 leak check and lectrical check result at SHC and TCS.

At SHC: HS line no leak . electrical check result is fine. At TCS: helium pressurized HS line to 70psi, 3 minutes. LD  leak rate 0.0xE-9atm.cc/sec , no response.

Attachment 1: Ta#62_Tm4_elecrical_check_and_leak_check_result_at_SHC.pdf
Ta#62_Tm4_elecrical_check_and_leak_check_result_at_SHC.pdf
  2236   Friday, July 30, 2021, 16:19 Carla BabcockITERepairTM4Ta#62Electrical issues on Ta62
TLDR: TBHT voltage too high and rising too quickly with TGHT current - voltage limited. TGHT power supply tripped breakers somehow. ITE:EL not outputting voltage.

 

A short between feedthroughs A and P developed at the end of the p2n run in this module, and was fixed by Chad prying apart the lines in the source tray with a long teflon bar. We did not take the containment box off to fix it properly for reasons of time and also potential damage to the containment box. This seemed to fix it and David measured around 13MOhms between A-P when the module was installed in ITE. To make sure we could recover if the short reappeared during the run, David did not connect the P/Q feedthrough to HV common on the module top as usual, but it was connected in the electrical room. I also unhooked the busbar from the coil power supply.

When trying to start the TGHT ramp up, it was discovered that ITE:TGHT had a fault in its readback circuit, which was showing negative voltages. Not sure how this happened, since the power supply was not used for the previous p2n run, maybe an HV spark? This supply was replaced with the spare (SN 1161-9894).

When TGHT and TBHT were able to be ramped up, we found that the tube heater voltage was increasing too much with the target current. Normally the rate of increase is about 0.0004 V per amp on TGHT. This time it was 0.004 V/A. This was causing the TBHT to be voltage limited, which I thought could be related to the AP short. So I re-wired it such that the P feedthrough (#7 in the electrical room) was disconnected from everything except it was tied to feedthrough A (#1) using a 100 Ohm resistor. This should prevent it from floating and also prevent current from going through. See documentation in the Target Records folder (https://documents.triumf.ca/docushare/dsweb/Get/Document-204373/July272021_ITETM4_electricalissues.pdf).

During the subsequent ramp up, the TGHT power supply tripped the breakers when it was at 500A, 8V. The cause of this is still uncertain, and the TBHT voltage issue persisted after the wiring change. In the interest of time we decided to stay conservative on the currents used and continue to run like this. It may also be possible that the copper block which is supposed to reference TBHT negative to HV common is not attached.

Finally ITE:EL is still not working. It shows a value on the front of the PSU but doesn't draw enough current and doesn't affect the beam. We are running without it and it will hopefully be fixed on the Aug. 4 maintenance day.

These electrical issues bear some resemblance to those with Ta61, but I don't think we ever determined the cause there.

  2247   Friday, September 17, 2021, 14:28 Travis CaveSpent Target VaultStandard Operation Ta#62Spent Target Move

 The spent Ta#62 target along with 2A2M19 were placed in pail #256 and placed in spot 7A of the spent target vault. See attached PDF for vault details.

Attachment 1: Target_Index_2021-09-17.pdf
Target_Index_2021-09-17.pdf Target_Index_2021-09-17.pdf Target_Index_2021-09-17.pdf
  2162   Thursday, November 05, 2020, 10:48 Travis CaveITEStandard OperationTM4Ta#61Module move

 TM#4 with Ta#61 has been moved from the south hot cell to the east target station.

  2177   Friday, January 08, 2021, 09:40 Travis CaveSouth Hot-CellStandard OperationTM4Ta#61Module move

 TM#4 with Ta#61 has been moved from the east target station to the south hot cell.

  2138   Wednesday, August 26, 2020, 09:52 David WangSouth Hot-CellStandard OperationTM2Ta#60Ta#60 target electrical check and leak check at SHC.

Electrical check and leak check at SHC. NO leak. electrical check ok.   Before target on, A is short to PQ, RU is short to HS ( 60KV bias) as we measured before.

Attachment 1: Ta_60_electrical_checklist.pdf
Ta_60_electrical_checklist.pdf
  2139   Thursday, August 27, 2020, 08:21 David WangConditioning StationStandard OperationTM2Ta#60Helium pressure check on TM2 HS line at TCS.

Helium pressurize on TM2 HS line at TCS is done.    Base LR is 0.0X E-9 atm.cc/sec.  70 psi helium 3 minutes.   No response.   Also, The TCS vacuum pumping down over night is good. 

  2140   Thursday, August 27, 2020, 09:42 Anders MjosConditioning StationMaintenanceTM2Ta#60Refilled TK2

Refilled TCS:TK2 from 10 in to 22 in using the newly installed valve.

  2144   Friday, September 11, 2020, 11:25 Travis CaveITWStandard OperationTM2Ta#60Module move

 Both the west entrance module and TM#2 with Ta#60 have been moved back into ITW.

  2155   Friday, October 16, 2020, 10:36 Travis CaveITWStandard OperationTM2Ta#60Module move

 TM#2 with Ta#60 is now in the south hot cell.

  1995   Tuesday, October 01, 2019, 14:38 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Electrical Check

 The results of the electrical check on TM#2 with the Ta#59 target and without before the target was mounted on the module.

Attachment 1: TM2_no_target_SHC_elec_chk_Oct-1-2019.pdf
TM2_no_target_SHC_elec_chk_Oct-1-2019.pdf
Attachment 2: TM2_Ta59_SHC_elec_chk_Oct-1-2019.pdf
TM2_Ta59_SHC_elec_chk_Oct-1-2019.pdf
  2021   Tuesday, November 05, 2019, 10:19 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Module move

 TM#2 with Ta#59 has been moved from the ITE to the south hot cell.

  2024   Tuesday, November 05, 2019, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Electrical Check

 Results of the electrical check of TM#2 with the old Ta#59 target and target free.

Attachment 1: Elec_Chk_TM2_with_Ta59_post_beam_SHC_Nov_05_2019.pdf
Elec_Chk_TM2_with_Ta59_post_beam_SHC_Nov_05_2019.pdf
Attachment 2: Elec_Chk_TM2_SHC_no_target_Nov_5_2019.pdf
Elec_Chk_TM2_SHC_no_target_Nov_5_2019.pdf
  2028   Tuesday, November 12, 2019, 10:07 Travis CaveSpent Target VaultStandard Operation Ta#59Spent Target Move

 The spent Ta#59 was moved from the south hot cell to the spent target vault. See the attached for details.

Attachment 1: Target_Index_2019-11-08.pdf
Target_Index_2019-11-08.pdf Target_Index_2019-11-08.pdf
  1962   Wednesday, August 14, 2019, 11:43 Travis CaveSouth Hot-CellStandard OperationTM2Ta#58 and no target.Results of electrical checks post beam at the south hot cell.

 Here are the results of the electrical done at the south hot cell post beam of with the Ta#58 target attached and with just the module no target attached.

Attachment 1: TM2_elec_chk_Ta58_post_beam_shc.pdf
TM2_elec_chk_Ta58_post_beam_shc.pdf
Attachment 2: TM2_Elec_chk_no_tgt_shc_Aug-14-2019.pdf
TM2_Elec_chk_no_tgt_shc_Aug-14-2019.pdf
  1922   Thursday, May 16, 2019, 12:31 chad fisherSouth Hot-CellStandard OperationTM2Ta#58Ta #58 installed

Ta #58 has been installed onto TM2. All new silver plated high current fasteners. All torqued to 130 in lbs.

  1923   Thursday, May 16, 2019, 14:35 Travis CaveSouth Hot-CellStandard OperationTM2Ta#58Electrical Check

 Results of the electrical check of TM#2 without target and with the new Ta#58 target.

Attachment 1: Ta#58_TM2_SHC_electrical_chk_May_16_2019.pdf
Ta#58_TM2_SHC_electrical_chk_May_16_2019.pdf
Attachment 2: Electrical_Chk_TM2_no_target_May_15_2019_SHC.pdf
Electrical_Chk_TM2_no_target_May_15_2019_SHC.pdf