Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 39 of 141  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Datedown Author Category Type Module Target/Number Subject
  2057   Monday, February 03, 2020, 09:14 David WangITWStandard OperationTM4UCx 29TM4 UCx 29 disconnection checklist

TM4 has been disconnected in ITW. See attachment checklist.

Attachment 1: UCx29__disconnection_checklist.pdf
UCx29__disconnection_checklist.pdf UCx29__disconnection_checklist.pdf UCx29__disconnection_checklist.pdf
  2056   Monday, February 03, 2020, 09:10 David WangITWStandard OperationTM4 ITW TPs are switched off. started of ITW argon venting.

ITW is argon venting now.

Argon venting of ITW is done. It took about 4.0 to 4.5 hours to vent the ITW with 2-3 psi argon. The CG4 and CG4S showed 35 to 36 torr on epic page when mechanical gauge is 760torr in electrical. Argon gas bottle is closed in electrical room.

  2055   Thursday, January 30, 2020, 12:06 David WangITWStandard OperationTM4 ITW primary and secondary vacuum seals leak check.

Connected LD to ITW(TM4) TP1. Base LR 0.0Xe-9 atm.cc/sec. Base pressure 0.0Xe-4 torr. All ITW primary and secondary air to vacuum seals are helium spray checked. There is a 5XE-9 atm.cc/sec leak on  exit2 module top cover plate o-ring seal. The location is on west  side, south corner of the plate. Hi- vacuum resin are sprayed to leak area, and leak checked  again. The leak is gone.   The other seals on ITW vacuum vessel are good.

 

  2054   Thursday, January 30, 2020, 10:22 David WangITWStandard OperationTM4  TM4 water lines helium pressure leak check.

  TM4 internal water lines helium pressure leak check at ITW : 70psi helium 5 minutes on  each circuits. Base leak rate 0.0X E-9 atm.cc/sec. Base pressure 0.0X E-4torr. Only B line(Oven -) has a tiny 1.5Xe-9 atm.cc/sec response on LD during the check . All others all perfect good. 

  2053   Wednesday, January 29, 2020, 12:37 David WangITEStandard OperationTM2 ITE primary/secondary vacuum vessel leak check.

Leak check on ITE vacuum vessel is done. LD base leak rate 0.0XE-9atm.cc/sec. base pressure 0.0Xe-4torr. Sprayed helium on all ITE primary and secondary vacuum vessel seals(including TM2). No leak . Also,70psi helium  pressurized TM2 waterlines inside the module for each circuit 3 minutes. No leak on all operating TM2 waterlines.  

  2052   Monday, January 27, 2020, 10:40 David WangCoolingMaintenance  ITE/ITW supply water presuure on dump circuits.

With both stations in operation,ITE dump supply gauge reading is 27 psi. ITW is 20 Psi.  I adjusted ITW dump pressure to 25 psi by changing the return line side pressure relieve valve.

ITE full operation+ ITW no TM: ITE dump pressure 27psi, ITW dump pressure 27psi.

2019-01-30: Water only supply to 2A beam lines only on both side, No TM2 and TM4 in water loop.  ITE dump pressure 27psi, ITW dump pressure 27psi.

  2051   Friday, January 24, 2020, 08:19 David WangITWStandard OperationTM4 ITW water signal interlock check.

ITW water signal interlock check is done. Everything works fine. ITW 2A2 tank water signal is broken and is not ok on XT2A2  page. I will fix it next week.

  2050   Thursday, January 16, 2020, 09:37 Travis CaveConditioning StationStandard OperationTM3no targetModule move

 TM#3 has been moved from the conditioning station to the centre east silo.

  2049   Tuesday, January 14, 2020, 10:19 David WangConditioning StationStandard OperationTM3 TCS vacuum system is switched off.

TM3 TP1 and TP2 work  fine in past 4 days. During operation, The current draw on pumps were 0.7A to 0.8 A. TM3 will be moved back to silo tomorrow.

  2048   Tuesday, January 14, 2020, 10:12 David WangConditioning StationStandard OperationTM3 Helium spray leak check on TCS.

Using a long pole with a probe to spray helium on TCS vacuum seals and joints which are installed in  TCS service pit. No response has been found on leak detector during leak check. TCS is leak free.

  2047   Monday, January 13, 2020, 14:19 Travis CaveSpent Target VaultStandard Operation Ta#49 and Ta#52spent target repackaging and moved to mini vault.

 Targeta Ta#49 and Ta#52 have been repackaged anf moved to the mini vault. Ta#49 was taken out of pail number 146 and placed into pail 229. Ta#52 was taken out of pail number 152 and placed into pail 230.

  2046   Friday, January 10, 2020, 10:26 David WangITEStandard Operation  ITE water signal inerlock check.

ITE water  signal interlock   check is done.  Everything is good. It is a annual check we do in winter shut down time.

  2045   Thursday, January 09, 2020, 14:14 David WangConditioning StationStandard OperationTM3 Start of TCS roughing pump for TM3.

I started TCS roughing pump. TM3 TP1 and TP2 will be started tomorrow morning.

  2044   Thursday, January 09, 2020, 13:49 Travis CaveConditioning StationStandard OperationTM3no targetModule move

 TM#3 has been moved from the south west silo to the conditioning station.

  2043   Wednesday, January 08, 2020, 10:34 David WangAssembly/Bench TestDevelopment  Module lifting assembly ITA0490

The second module lifting assembly ITA0490 is moved into TH and installed onto TM3 . It will stay with TM3. I adjusted the  CofG on the assembly. It is same to the first lifting assembly we are using now. After adjustment, The installation of assembly on TM3 are smooth. 

  2042   Tuesday, January 07, 2020, 09:37 David WangITWStandard Operation  5 shielding blocks are moved out of ITW top.

5 shielding blocks are moved out of itw top.

  2041   Tuesday, January 07, 2020, 08:02 David WangCoolingStandard Operation  Switch on HALCW MP2

HALCW MP2 is switched on this morning after yesterday cooling tower maintenance. LALCW P5 and P6 pumps are started by isac operator  as well. The system is good so far.

  2040   Friday, January 03, 2020, 13:15 Adam NewsomeCraneRepair  Target Hall Crane PLC Module/Battery Replacement
The Target Hall Crane bridge and trolley motion was lost after a period of the crane having power disconnected over winter holidays. This is reported in the following e-log: https://elog.triumf.ca/TIS/RH-ISAC/2039. This issue is a duplicate of what happened in 2019 at this time: https://elog.triumf.ca/TIS/RH-ISAC/1845

It was determined from troubleshooting via PLC indicator lights that the memory battery had died during the power-off time, and because of this, the program stored was lost. Note that this is an anomaly - the battery should have lasted much longer than the shutoff duration of ~2 weeks.

The SLC500 module was replaced with a spare, which contained a new battery. The old SLC500 module is still functioning but the battery has been removed (spares will be ordered) - this module is stored in a cabinet drawer in the control room. It will need to be re-programmed if re-installed as the program was lost. The original program titled TargetHallCrane.RSS was downloaded to the module. The crane was tested in local mode and determined to be functioning.

The following links are resources for resolving this issue:
https://isaccontrols.wiki.triumf.ca/index.php/ISAC_Target_Hall_Crane
https://isaccontrols.wiki.triumf.ca/index.php/SHUTDOWN_2015_Tasks#ISAC_Target_Hall_Crane_Controls_DM_-_Completed
  2039   Thursday, January 02, 2020, 10:10 David WangCraneStandard Operation  TH crane issue.

Target hall crane does not work properly after TH crane main power is switched off during Christmas time in control room. I switched the main power back this morning. The only movement could be operated is crane rotation. Power is supplied crane. The control  on N-S, E-W and up-down movements do not work. We had the same problem last year. After trouble shooting, It was pointed to a PLC battery issue. Control group changed the battery and reloaded the program. I guess  the battery is drained out very fast for some reason. So, We face the same problem again this year.

Adam checked control room main power supply. I checked in TH crane again. The problem is still there. We can confirm this is the same issue like last year. 

  2038   Thursday, January 02, 2020, 09:55 David WangCoolingStandard Operation  I turned on HALC water pump MP2.

HALCW MP2 is switched onnow. There is a small amount of air trapped in system. The pump works fine.  Water level and system resistivity will be monitored for a while.

LALCW P5 and P6 are switched on  for cooling HALCW.  HALCW MP2 is in operation now.

ELOG V2.9.2-2455