Entry  Tuesday, November 30, 2021, 12:51, David Wang, ITE, Standard Operation, TM4, Ta#63., Tm4 has been connected in ITE.  from_my_cellphone_2598_647.jpgfrom_my_cellphone_2598_648.jpgfrom_my_cellphone_2598_649.jpgfrom_my_cellphone_2598_650.jpg
TM4 has been connected in ITE. See attachment for checklist.
Entry  Thursday, January 20, 2022, 11:09, Travis Cave, Spent Target Vault, Standard Operation, , Ta#63, Spent Target Move Target_Index_2022-01-20.pdf
The spent Ta#63 has been moved from the north hot cell to the spent target vault. It was place in pail#266 and 
placed in spot #3B of the vault. see attached PDF for more details.
Entry  Thursday, July 08, 2021, 11:36, David Wang, Conditioning Station, Standard Operation, TM4, Ta#62, Remotely remove TM4(Ta#62) from SHC to TCS. 
Remotely remove TM4 (ta# 62) from SHC to TCS.  The moving is smooth. 
Entry  Thursday, July 08, 2021, 11:45, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#62, TM4 Ta#62 leak check and lectrical check result at SHC and TCS.  Ta#62_Tm4_elecrical_check_and_leak_check_result_at_SHC.pdf
At SHC: HS line no leak . electrical check result is fine. At TCS: helium pressurized HS line to 70psi, 3 minutes. LD  leak rate 0.0xE-9atm.cc/sec
, no response. 
Entry  Friday, July 30, 2021, 16:19, Carla Babcock, ITE, Repair, TM4, Ta#62, Electrical issues on Ta62 
TLDR: TBHT voltage too high and rising too quickly with TGHT current - voltage
limited. TGHT power supply tripped breakers somehow. ITE:EL not outputting voltage.
 
Entry  Friday, September 17, 2021, 14:28, Travis Cave, Spent Target Vault, Standard Operation, , Ta#62, Spent Target Move Target_Index_2021-09-17.pdf
 The spent Ta#62 target along with 2A2M19 were placed in pail #256 and placed in spot 7A of the spent target vault. See attached PDF for vault details.
Entry  Thursday, November 05, 2020, 10:48, Travis Cave, ITE, Standard Operation, TM4, Ta#61, Module move 
 TM#4 with Ta#61 has been moved from the south hot cell to the east target station.
Entry  Friday, January 08, 2021, 09:40, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#61, Module move 
 TM#4 with Ta#61 has been moved from the east target station to the south hot cell.
Entry  Wednesday, August 26, 2020, 09:52, David Wang, South Hot-Cell, Standard Operation, TM2, Ta#60, Ta#60 target electrical check and leak check at SHC. Ta_60_electrical_checklist.pdf
Electrical check and leak check at SHC. NO leak. electrical check ok.   Before target on, A is short to PQ, RU is short to HS ( 60KV bias)
as we measured before. 
Entry  Thursday, August 27, 2020, 08:21, David Wang, Conditioning Station, Standard Operation, TM2, Ta#60, Helium pressure check on TM2 HS line at TCS. 
Helium pressurize on TM2 HS line at TCS is done.    Base LR is 0.0X E-9 atm.cc/sec.  70 psi helium 3 minutes.   No response.   Also, The TCS vacuum pumping
down over night is good. 
Entry  Thursday, August 27, 2020, 09:42, Anders Mjos, Conditioning Station, Maintenance, TM2, Ta#60, Refilled TK2 
Refilled TCS:TK2 from 10 in to 22 in using the newly installed valve.
Entry  Friday, September 11, 2020, 11:25, Travis Cave, ITW, Standard Operation, TM2, Ta#60, Module move 
 Both the west entrance module and TM#2 with Ta#60 have been moved back into ITW.
Entry  Friday, October 16, 2020, 10:36, Travis Cave, ITW, Standard Operation, TM2, Ta#60, Module move 
 TM#2 with Ta#60 is now in the south hot cell.
Entry  Tuesday, October 01, 2019, 14:38, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#59, Electrical Check TM2_no_target_SHC_elec_chk_Oct-1-2019.pdfTM2_Ta59_SHC_elec_chk_Oct-1-2019.pdf
 The results of the electrical check on TM#2 with the Ta#59 target and without before the target was mounted on the module.
Entry  Tuesday, November 05, 2019, 10:19, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#59, Module move 
 TM#2 with Ta#59 has been moved from the ITE to the south hot cell.
Entry  Tuesday, November 05, 2019, 14:27, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#59, Electrical Check Elec_Chk_TM2_with_Ta59_post_beam_SHC_Nov_05_2019.pdfElec_Chk_TM2_SHC_no_target_Nov_5_2019.pdf
 Results of the electrical check of TM#2 with the old Ta#59 target and target free.
Entry  Tuesday, November 12, 2019, 10:07, Travis Cave, Spent Target Vault, Standard Operation, , Ta#59, Spent Target Move Target_Index_2019-11-08.pdf
 The spent Ta#59 was moved from the south hot cell to the spent target vault. See the attached for details.
Entry  Wednesday, August 14, 2019, 11:43, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#58 and no target., Results of electrical checks post beam at the south hot cell. TM2_elec_chk_Ta58_post_beam_shc.pdfTM2_Elec_chk_no_tgt_shc_Aug-14-2019.pdf
 Here are the results of the electrical done at the south hot cell post beam of with the Ta#58 target attached and with just the module no target
attached.
Entry  Thursday, May 16, 2019, 12:31, chad fisher, South Hot-Cell, Standard Operation, TM2, Ta#58, Ta #58 installed 
Ta #58 has been installed onto TM2. All new silver plated high current fasteners. All torqued to 130 in lbs.
Entry  Thursday, May 16, 2019, 14:35, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#58, Electrical Check Ta#58_TM2_SHC_electrical_chk_May_16_2019.pdfElectrical_Chk_TM2_no_target_May_15_2019_SHC.pdf
 Results of the electrical check of TM#2 without target and with the new Ta#58 target.