Monday, September 23, 2019, 13:21, Travis Cave, Spent Target Vault, Standard Operation, , , Repacking of the targets.
|
All targets in the mini vault have been repackaged and are now ready to be loaded into F-308s. All the target pails have new numbers see attached
sheet for details. |
Thursday, September 19, 2019, 10:11, Travis Cave, Spent Target Vault, Standard Operation, , , Repacking of the targets.
|
Another target in the mini storage has been repackaged into the new pails. With one remaining to do which will be done on Monday. |
Wednesday, September 18, 2019, 14:28, Travis Cave, Spent Target Vault, Standard Operation, , , Repacking of the targets.
|
Three of the five targets in the mini storage have been repackaged into the stronger pail. |
Tuesday, September 17, 2019, 07:37, Carla Babcock, ITE, Development, TM2, ZrC#8, end of run HV investigations
|
Ramping up HV to ~30kV, encountered problems and had to drop back to 28kV. No response on IG1 or anything else during sparks. Lots of charging-type behaviour
on the bias current. Protons at 55uA
Tuesday, September 17, 2019, 02:02 : 15 mins with only 1 spark at 30kV so increased the bias |
Friday, September 13, 2019, 13:36, David Wang, ITW, Standard Operation, TM4, UCX27, TM4 conenction in ITW checklist
|
TM4 was connected in ITW this Tuesday. See attachment for checklist. |
Thursday, September 12, 2019, 09:26, David Wang, ITW, Repair, TM4, , ITW bad vacuum issue and trouble shoot.
|
ITW secondary vacuum was bad in last two days after TM4 was connected in ITW. Today when check the exit 2 module, I found a small needle valve on exit
2 module top was slightly opened for some reason in past months. The valve is closed . ITW vacuum is returned to normal status. |
Tuesday, September 10, 2019, 14:04, David Wang, ITW, Standard Operation, , , ITW water interlock check.
|
ITW water interlock check is finished. Everything is good. |
Tuesday, September 10, 2019, 10:10, Adam Newsome, ITW, Standard Operation, TM4, UC#27, TM4 Move
|
TM4 has been moved from the Conditioning Station to ITW with UC#27 target. |
Tuesday, September 10, 2019, 08:25, David Wang, Conditioning Station, Standard Operation, TM4, UCx27, Argan vent TCS.
|
TCS is argon vented. TM4 is disconnected at TCS. |
Monday, September 09, 2019, 06:38, David Wang, Conditioning Station, Standard Operation, TM4, UCx27, HS and window line leak check.
|
TM4 HS and window line are helium pressure checked at TCS. 70 psi helium 5 minutes. No response @1.2XE-8 atm.cc/sec. They are leak free. |
Thursday, September 05, 2019, 14:26, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#27, Electrical Check
|
The results of the electrical check of TM#4 with UC#27 attached to it. |
Thursday, September 05, 2019, 14:26, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#27, Electrical Check
|
The results of the electrical check of TM#4 with UC#27 attached to it. |
Thursday, September 05, 2019, 14:18, Adam Newsome, South Hot-Cell, Standard Operation, TM4, UCx#27, TM4 Move
|
TM4 with UCx#27 target has been moved from the South Hot-Cell to the Conditioning Station. |
Thursday, September 05, 2019, 11:37, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#27, UCx#27 install
|
Dummy Ta target has been removed from TM4 and UCx#27 installed |
Wednesday, September 04, 2019, 13:53, chad fisher, South Hot-Cell, Repair, TM4, , TM3 CB to TM4
|
The TM3 containment box has been installed onto TM4. No issues, leak checked ok.
|
Tuesday, September 03, 2019, 10:49, Adam Newsome, South Hot-Cell, Standard Operation, TM4, , TM4 Move
|
TM4 has been moved from the Conditioning Station to the South Hot-Cell. |
Tuesday, September 03, 2019, 10:48, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move
|
TM3 has been moved from the South Hot-Cell to the Middle-East silo. |
Thursday, August 29, 2019, 12:54, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move
|
TM3 has been moved from the Middle-East silo to the South Hot Cell. |
Tuesday, August 27, 2019, 13:12, Adam Newsome, Safe Module Parking, Development, , , SMP Remote Control Wiring Inspection
|
The wiring for the SMP remote control module was inspected by Joel Semilla (TRIUMF electrician). The module was plugged in to verify there were no
issues. No changes were suggested, and then wiring was approved. |
Friday, August 23, 2019, 14:27, Isaac Earle, Safe Module Parking, Development, , , SMP camera video cabling installed and tested
|
Installation of the video lines for the SMP cameras was completed yesterday according to IRH1670 Rev B. All four cameras were confirmed to
be displaying properly in the crane control room. The cameras are powered from an outlet wired to circuit 35/37 on Panel #443 (located in the NHCSA).
This is independent from the power supply for other existing camera systems in the Target Hall. The SMP turntable was rotated through the full range |
|