1995
|
Tuesday, October 01, 2019, 14:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#59 | Electrical Check | The results of the electrical check
on TM#2 with the Ta#59 target and without
before the target was mounted on the module. |
|
1994
|
Tuesday, October 01, 2019, 10:22 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | ZrC#8 Removed Ta#59 installed | ZrC#8 has been removed from TM2. Upon removal
of the high current tube heater bolts it
was noticed that the tube was broken. Also |
|
1993
|
Tuesday, October 01, 2019, 09:23 |
Don Jackson | ITE | Maintenance | TM2 | ZrC #8 | 60KV Common Connections | 1 Jumpers between 60KV common and FEBIAD
lines were connected in an unusual way.
This should of had no impact on the ZrC run |
|
1992
|
Monday, September 30, 2019, 14:05 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | Electrical Check | Results of the electrical check on
TM#2 with ZrC#8 post beam. |
|
1991
|
Monday, September 30, 2019, 11:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | Module move | TM#2 with ZrC#8 has been moved from
the east station to the south hot cell. |
|
1990
|
Monday, September 30, 2019, 11:27 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum vessel modifications completed | The SMP vacuum vessel welds were reinforced
to match the specifications on IRH1710 Rev
D. In addition a tube stub was added |
|
1989
|
Monday, September 23, 2019, 13:21 |
Travis Cave | Spent Target Vault | Standard Operation | | | Repacking of the targets. | All targets in the mini vault have
been repackaged and are now ready to be loaded
into F-308s. All the target pails have new |
|
1988
|
Thursday, September 19, 2019, 10:11 |
Travis Cave | Spent Target Vault | Standard Operation | | | Repacking of the targets. | Another target in the mini storage
has been repackaged into the new pails. With
one remaining to do which will be done on |
|
1987
|
Wednesday, September 18, 2019, 14:28 |
Travis Cave | Spent Target Vault | Standard Operation | | | Repacking of the targets. | Three of the five targets in the
mini storage have been repackaged into the
stronger pail. |
|
1986
|
Tuesday, September 17, 2019, 07:37 |
Carla Babcock | ITE | Development | TM2 | ZrC#8 | end of run HV investigations | Ramping up HV to ~30kV, encountered problems
and had to drop back to 28kV. No response
on IG1 or anything else during sparks. Lots |
|
1985
|
Friday, September 13, 2019, 13:36 |
David Wang | ITW | Standard Operation | TM4 | UCX27 | TM4 conenction in ITW checklist | TM4 was connected in ITW this Tuesday.
See attachment for checklist. |
|
1984
|
Thursday, September 12, 2019, 09:26 |
David Wang | ITW | Repair | TM4 | | ITW bad vacuum issue and trouble shoot. | ITW secondary vacuum was bad in last two
days after TM4 was connected in ITW. Today
when check the exit 2 module, I found a small |
|
1983
|
Tuesday, September 10, 2019, 14:04 |
David Wang | ITW | Standard Operation | | | ITW water interlock check. | ITW water interlock check is finished.
Everything is good. |
|
1982
|
Tuesday, September 10, 2019, 10:10 |
Adam Newsome | ITW | Standard Operation | TM4 | UC#27 | TM4 Move | TM4 has been moved from the Conditioning
Station to ITW with UC#27 target. |
|
1981
|
Tuesday, September 10, 2019, 08:25 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx27 | Argan vent TCS. | TCS is argon vented. TM4 is disconnected
at TCS. |
|
1980
|
Monday, September 09, 2019, 06:38 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx27 | HS and window line leak check. | TM4 HS and window line are helium pressure
checked at TCS. 70 psi helium 5 minutes.
No response @1.2XE-8 atm.cc/sec. They are |
|
1979
|
Thursday, September 05, 2019, 14:26 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#27 | Electrical Check | The results of the electrical check
of TM#4 with UC#27 attached to it. |
|
1978
|
Thursday, September 05, 2019, 14:26 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#27 | Electrical Check | The results of the electrical check
of TM#4 with UC#27 attached to it. |
|
1977
|
Thursday, September 05, 2019, 14:18 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | UCx#27 | TM4 Move | TM4 with UCx#27 target has been moved from
the South Hot-Cell to the Conditioning Station.
|
|
1976
|
Thursday, September 05, 2019, 11:37 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#27 | UCx#27 install | Dummy Ta target has been removed from TM4
and UCx#27 installed |
|