  ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  1379   Monday, October 24, 2016, 12:22 chad fisherSouth Hot-CellRepair  TM2 Insulator replacementconductor insulators itd0053 and 54 have
been replaced on TM2. All fasteners (1/4-20
x 1 1/4 vented) torqued to 60 in lbs.
  
  1380   Monday, October 24, 2016, 14:44 chad fisherSouth Hot-CellStandard OperationTM2SiC#35SiC#35 installedSic#35 has been installed onto TM2. High
current fasteners torqued to 130 in lbs.
Mating of the 9 pin connector was
 20161024_141155.jpg 
  1381   Monday, October 24, 2016, 14:54 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on HS line.Chad and I did the leak check on TM2 heat
shield line. LD base leak rate:0.0xE-9atm.cc/sec.
Base pressure:0.0X E-9 torr. The line is
  
  1382   Monday, October 24, 2016, 14:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical ChecksResults of the electrical check of TM#2
with no target after the repair and with
the SiC#35 mounted on the module.
 TM2_elechk_notgt_SHC_repair.PDFTM2_elechk_SiC35_SHC.PDF 
  1387   Tuesday, November 01, 2016, 14:58 David WangSouth Hot-CellStandard OperationTM4 SHC, TM4 leak check on HS line.Chad and I did a leak check on TM4 HS line
with new Ta target installed. Base leak rate
0.0xE-9 atm.cc/sec. base pressure 0.0XE-4.  
  
  1398   Tuesday, November 22, 2016, 10:45 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35module movedTM#2 with the old SiC #35 has been moved
from ITW to the south hot cell.
  
  1399   Tuesday, November 22, 2016, 11:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical CheckElectrical check of TM#2 with the SiC#35 
post beam run. See attached PDF for details.
 TM2_elechk_SiC35_postbeam.PDF 
  1402   Wednesday, November 23, 2016, 14:25 Travis CaveSouth Hot-CellStandard OperationTM2UC#18Electrical CheckResults of TM#2 with UC#18 electrical at
the south hot cell. See attached PDF for
details.
 TM2_elechk_UC18_SHC.PDF 
  1403   Wednesday, November 23, 2016, 16:10 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on HS line.Chad and I leak checked TM2 HS line with
new UCx target installed. Helium spray 
2 seconds on each joint and 10seconds flushing
  
  1428   Friday, January 27, 2017, 08:44 chad fisherSouth Hot-CellStandard OperationTM2Ta#50UCx #18 - Ta Feibiad Dummy installed. Target Change Waterline interferenceOn Tuesday, January 24th UCx#18 was removed
from TM2 and Ta febiad dummy installed. I
encountered the same issue mounting the new
 TM2_Waterline_interference.jpg 
  1429   Friday, January 27, 2017, 08:46 chad fisherSouth Hot-CellStandard OperationTM4Ta#50 Ta#50 RemovedTa#50 has been was removed from TM4 on
Wednesday, January 25th.
  
  1430   Friday, January 27, 2017, 08:50 chad fisherSouth Hot-CellStandard Operation  UCx#18 and Ta#50 autopsy and spent target moveOn Thursday, January 26th UCx#18 and Ta#50
were inspected and packaged into spent target
pails, move to storage vault.
  
  1439   Wednesday, February 15, 2017, 12:07 chad fisherSouth Hot-CellMaintenance  Manipulator 'Z' motion cable replacement preparation statusAaron and I completed assembling (re-assembling)
the clean spare on Tuesday, February 14th
to assist in determining a procedure for
 20170215_113609.jpg 
  1441   Monday, February 27, 2017, 14:23 chad fisherSouth Hot-CellRepair  Manip. 'Z' motion cable run throughAaron and I successfully completed a run
through on the procedure to replace the 'Z'
motion cable. I will be writing up the procedure
  
  1448   Friday, March 10, 2017, 09:19 chad fisherSouth Hot-CellStandard Operation  South Hot Cell Field MeasurementsThe fields in the hot cell have been measured
by means of a pole monitor through the tool
port. Field was measured to be 25 uSv/h.
  
  1449   Tuesday, March 14, 2017, 07:34 chad fisherSouth Hot-CellMaintenance  Hot Cell FieldsI have re-measured the fields in the hot
cell. Fields at shield door Al cover are
101 uSv\h, in cell at the east manipulator
  
  1450   Tuesday, March 14, 2017, 11:46 chad fisherSouth Hot-CellMaintenance  'Z' motion cable dry runDid a dry run with the latest procedure
with Dan Mcdonald. Elapsed time was approximately
30 min.
  
  1451   Wednesday, March 15, 2017, 07:45 chad fisherSouth Hot-CellMaintenance  South Hot Cell FieldsI have moved the suspected "hot"
items in the hot cell and placed them under
some lead bricks. I have re-measured the
  
  1453   Thursday, March 16, 2017, 12:24 chad fisherSouth Hot-CellMaintenance  West 'Z' motion cable replacementThe west 'Z' motion cable on the east manipulator
has successfully been replaced. The job took
slightly less than an hour (including inspection
  
  1457   Wednesday, March 22, 2017, 14:05 Travis CaveSouth Hot-CellStandard OperationTM2test targetmodule movedTM#2 has been moved from the east target
station to the south hot cell.
  