ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  1131   Tuesday, November 24, 2015, 14:02 chad fisherSouth Hot-CellRepair  Left Manip repairelectronics package on left manip died
completely yesterday (it has been going for
a while).
  
  1132   Tuesday, November 24, 2015, 14:03 chad fisherSouth Hot-CellStandard OperationTM4 Ta#46Ta#46 has been removed from TM4.   
  1133   Wednesday, November 25, 2015, 11:52 Travis CaveSouth Hot-CellStandard OperationTM4Ta#46Module movedYesterday TM#4 with Ta#46 was moved from
the east station to the south hot cell.
  
  1135   Wednesday, November 25, 2015, 14:13 chad fisherSouth Hot-CellStandard OperationTM4UC#14UCx#14UCx#14 installed onto TM4. High current
fasteners torqued to 130 in lbs.
  
  1136   Wednesday, November 25, 2015, 14:16 chad fisherSouth Hot-CellRepair  Cell DeconCell (table) was systematically cleaned
with a swiffer and resulting piles of contaminated
waste placed in pail with spent Ta target.
 20151125_100512.jpg20151125_101620.jpg 
  1147   Wednesday, December 02, 2015, 10:41 chad fisherSouth Hot-CellRepair  Drum Clean-up #2Another drum of waste was removed from
the south hot cell this morning. This drum
contained one 5 gal steel pail (damaged),
  
  1151   Friday, January 08, 2016, 09:29 chad fisherSouth Hot-CellRepair  Window DeconEntered the hot cell to perform final decon
on the window. Initial swipes this morning
were 11000 c.p.m. on 44-2. After decon approximately
  
  1153   Friday, January 22, 2016, 14:24 David WangSouth Hot-CellStandard Operation  2016 Winter Shut Down Target Hall Schedule (sketch)Post a sketch of 2016 winter shut down
target hall schedule. see attachment 1,2
 UPDATE THE SCHEDULE ACCORDING
 2016_winter_shut_down__target_hall_schedule.pdf2016_winter_shut_down__target_hall_schedule.mpp2016_winter_shut_down__target_hall_schedule.pdf2016_winter_shut_down__target_hall_schedule.mpp 
  1167   Wednesday, March 16, 2016, 14:23 chad fisherSouth Hot-CellStandard OperationTM2SiC#32SiC#32 removal Target Module InspectionSiC#32 has been removed from TM2. Quick
inspection shows some troubling discoloration
on the water cooled connection blocks of
 20160316_141127.jpg20160316_141146.jpg 
  1168   Thursday, March 17, 2016, 14:57 David WangSouth Hot-CellRepairTM2 TM2 first round leak check in SHCChad and I finished the first round check
on Tm2 water lines.  The lines and spots
checked are: Target oven + and - (front side
  
  1172   Friday, March 18, 2016, 11:43 chad fisherSouth Hot-CellStandard Operation  SiC#32 dissectionSiC#32 has been open for inspection.  20160318_105519_1.jpg20160318_105311.jpg20160318_105248.jpg20160318_105428.jpg 
  1178   Wednesday, March 23, 2016, 11:00 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule movedTM#2 was moved into the south hot cell
by 08:30.
  
  1179   Wednesday, March 23, 2016, 11:32 David WangSouth Hot-CellRepairTM2 TM2 Helium spray leak check on GE and MSP lines at SHC  Chad and I did the helium spray
leak check on TM2 GE and MSP  water lines
at SHC this morning. We confirmed the GE
  
  1186   Friday, April 01, 2016, 11:41 Travis CaveSouth Hot-CellStandard OperationTM1UC#15Electrical CheckElectrical check of the target on TM#1,
target in question is UC#15. See PDF for
details.
 TM1_elec_chk_UC#15_SHC.PDF 
  1194   Wednesday, April 06, 2016, 09:37 Travis CaveSouth Hot-CellStandard OperationTM4UC#14module movedTM#4 with UC#14 has been moved from the
east target station to the south hot cell.
  
  1195   Wednesday, April 06, 2016, 14:03 chad fisherSouth Hot-CellStandard OperationTM4Ta#47UCx#14 removed Ta#47 installedUCx#14 has been removed from TM4 and Ta#47
installed. No marks on 9 pin connector on
UCx#14.
  
  1196   Wednesday, April 06, 2016, 14:52 Travis CaveSouth Hot-CellStandard OperationTM4UC#14, No Target, Ta#47Electrical CheckVarious electrical checks done on TM#4,
one of post beam UC#14, of no target and
with Ta#47. See PDFs for details.
 TM4_elec_chk_notgt_SHC.PDFTM4_elec_chk_Ta47_SHC.PDFTM4_elec_chk_UC14_SHC_postbeam.PDF 
  1224   Monday, May 09, 2016, 10:13 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule movedTM#3 was moved from the conditioning station
to the NE Silo. TM#2 was moved from the SW
Silo to the South hot cell.
  
  1225   Tuesday, May 10, 2016, 13:37 chad fisherSouth Hot-CellStandard OperationTM2Ta#48Ta#48 InstallationTa#48 has been installed onto TM2. Also
new window gaskets were installed.
High current fasteners were torqued
  
  1226   Tuesday, May 10, 2016, 13:54 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on window line and HS line.Chad and I leak checked the TM2 HS and
window lines after new target installation. 
The window line was very easy pumped down
  