1022
|
Tuesday, July 28, 2015, 14:36 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#31 | SiC#31 Autopsy | Extraction electrode was removed from SiC#31
and target inspected.
Pictures of findings can be found |
|
1023
|
Tuesday, July 28, 2015, 14:40 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#31 UCx#13 | SiC#31 removed UCx#13 installed | SiC#31 has been removed from TM4 and UCx#13
installed. UCx#13 connection to the 9 pin
connector was VERY VERY tight to the tube |
|
1030
|
Thursday, August 06, 2015, 11:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved | TM#2 is now in the south hot cell |
|
1032
|
Monday, August 10, 2015, 14:07 |
Isaac Earle | South Hot-Cell | Repair | TM2 | | TM2 Containment Box Removed | The containment box was taken off TM2 in
preparation for installation of a new coil
line isolator. |
|
1033
|
Thursday, August 13, 2015, 09:17 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 status | Tuesday, August 11, insulator ITA6272
was installed onto the "pin x"
line (unused plasma electrode) and tested; |
|
1034
|
Thursday, August 13, 2015, 11:34 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Dummy Target | Electrical Check | Electrical check of TM2 without target
after that widget has installed, electrical
check with the shunts on, electrical check |
|
1035
|
Thursday, August 13, 2015, 13:46 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Status | As previously mentioned, dump target installed
with new mounting and high current fasteners.
Leak Check complete and ready to |
|
1042
|
Thursday, August 20, 2015, 10:15 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Dummy Target | Module moved | TM#2 is now in the south hot cell. |
|
1045
|
Friday, August 21, 2015, 11:38 |
Anders Mjos | South Hot-Cell | Repair | TM2 | FEBIAD Test Target | Steerer wires found to be touching the gas lines | Yesterday TM2 was inspected in the SHC.
Spark marks were found both on the steerer
wires and on the ANODE wire. The steerer |
|
1046
|
Tuesday, August 25, 2015, 13:54 |
Grant Minor | South Hot-Cell | Repair | TM2 | ZrC#7 | TM2 - Electrical / HV Short Repair and Current Status (ZrC target) | Hello all,
TM2's first performance in the Conditioning |
|
1047
|
Wednesday, August 26, 2015, 09:20 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC #7 | Electrical Check | Electrical check of TM#2 with ZrC #7 installed |
|
1049
|
Wednesday, August 26, 2015, 10:55 |
chad fisher | South Hot-Cell | Repair | TM2 | ZrC#7 | New wiring and target | New wiring was installed yesterday as well
as ZrC#7 which had its high current fasteners
torqued to 130 in lbs. |
|
1064
|
Wednesday, September 09, 2015, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved | TM#1 has been moved from the south west
silo to the south hot cell. |
|
1065
|
Thursday, September 10, 2015, 08:55 |
chad fisher | South Hot-Cell | Repair | TM1 | | TM1 Window Leak Diag. | Vacuum leak check on the window line circuit
of TM1 took place yesterday and again to
confirm this morning. Both days the response |
|
1066
|
Thursday, September 10, 2015, 08:59 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Mait. and field check Sept. 4 | Hot cell was entered for preventative mait.
on left manip. field measurements around
the cell were taken in prep. for window removal |
|
1068
|
Tuesday, September 15, 2015, 08:24 |
David Wang | South Hot-Cell | Repair | TM1 | UCx 13 | Leak check on TM1 window circuit soldering stems in service cap. | I did a leak check on TM1 window circuit
2 soldering stems in service cap.The
round side panel was opened for the job. |
|
1069
|
Tuesday, September 15, 2015, 11:06 |
chad fisher | South Hot-Cell | Repair | TM1 | | TM1 Window Gasket Replacement | Replaced the custom silver gaskets on the
entrance window panel of TM1 this morning...this
has eliminated an sign of leak at this joint, |
|
1070
|
Thursday, September 17, 2015, 09:01 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved | TM#1 has been moved from the south hot
cell to the north east silo. |
|
1073
|
Tuesday, September 22, 2015, 11:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#13 | Electrical Check | TM#4 with UC#13 post beam electrical check.
Also and electrical check was done without
the target on. |
|
1074
|
Tuesday, September 22, 2015, 11:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#46 | Electrical Check | TM#4 electrical check with Ta#46 attached. |
|