1015
|
Monday, July 27, 2015, 14:37 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#13 | Module moved | TM#4 has been moved from the east target
station (morning with SiC#31), and moved
to the conditioning station from the south |
|
1021
|
Tuesday, July 28, 2015, 14:31 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#13 | Electrical Check | TM#4 with UC#13 electrical check at the
conditioning station under vacuum. See attached
PDF. |
|
1025
|
Wednesday, July 29, 2015, 08:59 |
Travis Cave | ITE | Standard Operation | TM4 | UC#13 | Module moved | TM#4 with UC#13 has been moved from the
conditioning station to the east target station. |
|
1027
|
Thursday, July 30, 2015, 14:05 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#31 | Spent target moved | SiC#31 has been moved to the spent target
vault. It is in pail #127 and placed in spot
3C of the vault is was 489mSv/hr when removed |
|
1029
|
Thursday, August 06, 2015, 10:26 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Measurments and Assays | All targets but one ( SiC#31 went in last
week) have been measured or assayed. See
attached PDF for the details. |
|
1030
|
Thursday, August 06, 2015, 11:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved | TM#2 is now in the south hot cell |
|
1034
|
Thursday, August 13, 2015, 11:34 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Dummy Target | Electrical Check | Electrical check of TM2 without target
after that widget has installed, electrical
check with the shunts on, electrical check |
|
1036
|
Thursday, August 13, 2015, 14:36 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | Dummy Target | Module moved | TM#2 with the dummy target has been moved
to the conditioning station. |
|
1042
|
Thursday, August 20, 2015, 10:15 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Dummy Target | Module moved | TM#2 is now in the south hot cell. |
|
1043
|
Thursday, August 20, 2015, 11:00 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | Dummy Target | Electrical Check | TM#2 electrical check at the conditioning
station. All pumps were off but the module
was not vented. |
|
1047
|
Wednesday, August 26, 2015, 09:20 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC #7 | Electrical Check | Electrical check of TM#2 with ZrC #7 installed |
|
1050
|
Wednesday, August 26, 2015, 11:12 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | ZrC #7 | Module moved | TM#2 with ZrC#7 has been moved to the conditioning
station from the south hot cell. |
|
1054
|
Thursday, August 27, 2015, 08:43 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | ZrC #7 | Electrical Check | Electrical check of TM#2 at the conditioning
station under vacuum. The resistance value
of the target to 60kV common is a bit lower |
|
1057
|
Tuesday, September 01, 2015, 10:32 |
Travis Cave | ITW | Standard Operation | TM2 | ZrC #7 | Module moved | TM#2 with ZrC#7 has been moved from the
conditioning station to the west target
station. |
|
1064
|
Wednesday, September 09, 2015, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved | TM#1 has been moved from the south west
silo to the south hot cell. |
|
1070
|
Thursday, September 17, 2015, 09:01 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved | TM#1 has been moved from the south hot
cell to the north east silo. |
|
1072
|
Tuesday, September 22, 2015, 11:12 |
Travis Cave | ITE | Standard Operation | TM4 | UC#13 | Module moved | TM#4 with UC#13 has been moved from the
east target station to the south hot cell. |
|
1073
|
Tuesday, September 22, 2015, 11:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#13 | Electrical Check | TM#4 with UC#13 post beam electrical check.
Also and electrical check was done without
the target on. |
|
1074
|
Tuesday, September 22, 2015, 11:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#46 | Electrical Check | TM#4 electrical check with Ta#46 attached. |
|
1076
|
Wednesday, September 23, 2015, 08:38 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#46 | Module moved | TM#4 with Ta#46 has been moved from the
south hot cell to the conditioning station. |
|