Monday, July 13, 2015, 11:31, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, Module moved
|
TM#1 has been moved back to the south west silo from the conditioning station. |
Tuesday, July 14, 2015, 08:42, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module moved
|
TM#2, no target, has been moved from the north east silo to the south hot cell. |
Tuesday, July 21, 2015, 09:21, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Check Failed
|
TM#2 has failed the electrical check see attached pdf for details. |
Wednesday, July 22, 2015, 11:31, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Check
|
Electrical check done on TM#2 around the 25th of June 2015, this was before the coil line leak was found. |
Friday, July 24, 2015, 14:41, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module moved
|
TM#2 has been moved from the south hot cell to north east silo. |
Monday, July 27, 2015, 12:12, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#31, Electrical Check 
|
Electrical check of TM#4 post beam with target (SiC#31) on and module without target on. There is a short between the target and EE when the target is on and when the target was removed short went away. See the PDF for details. |
Monday, July 27, 2015, 13:38, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#13, Electrical Check
|
Electrical check of TM#4 with UC#13 at the south hot cell. See PDF for details. |
Monday, July 27, 2015, 14:37, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#13, Module moved
|
TM#4 has been moved from the east target station (morning with SiC#31), and moved to the conditioning station from the south hot cell with UC#13 on it. |
Tuesday, July 28, 2015, 14:31, Travis Cave, Conditioning Station, Standard Operation, TM4, UC#13, Electrical Check
|
TM#4 with UC#13 electrical check at the conditioning station under vacuum. See attached PDF. |
Wednesday, July 29, 2015, 08:59, Travis Cave, ITE, Standard Operation, TM4, UC#13, Module moved
|
TM#4 with UC#13 has been moved from the conditioning station to the east target station. |
Thursday, July 30, 2015, 14:05, Travis Cave, Spent Target Vault, Standard Operation, , SiC#31, Spent target moved
|
SiC#31 has been moved to the spent target vault. It is in pail #127 and placed in spot 3C of the vault is was 489mSv/hr when removed from the south hot cell. See attached pdf for vault status |
Thursday, August 06, 2015, 10:26, Travis Cave, Spent Target Vault, Standard Operation, , , Spent Target Measurments and Assays
|
All targets but one ( SiC#31 went in last week) have been measured or assayed. See attached PDF for the details. |
Thursday, August 06, 2015, 11:40, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module moved
|
TM#2 is now in the south hot cell |
Thursday, August 13, 2015, 11:34, Travis Cave, South Hot-Cell, Standard Operation, TM2, Dummy Target, Electrical Check  
|
Electrical check of TM2 without target after that widget has installed, electrical check with the shunts on, electrical check with the dummy target installed. |
Thursday, August 13, 2015, 14:36, Travis Cave, Conditioning Station, Standard Operation, TM2, Dummy Target, Module moved
|
TM#2 with the dummy target has been moved to the conditioning station. |
Thursday, August 20, 2015, 10:15, Travis Cave, South Hot-Cell, Standard Operation, TM2, Dummy Target, Module moved
|
TM#2 is now in the south hot cell. |
Thursday, August 20, 2015, 11:00, Travis Cave, Conditioning Station, Standard Operation, TM2, Dummy Target, Electrical Check
|
TM#2 electrical check at the conditioning station. All pumps were off but the module was not vented. |
Wednesday, August 26, 2015, 09:20, Travis Cave, South Hot-Cell, Standard Operation, TM2, ZrC #7, Electrical Check
|
Electrical check of TM#2 with ZrC #7 installed |
Wednesday, August 26, 2015, 11:12, Travis Cave, Conditioning Station, Standard Operation, TM2, ZrC #7, Module moved
|
TM#2 with ZrC#7 has been moved to the conditioning station from the south hot cell. |
Thursday, August 27, 2015, 08:43, Travis Cave, Conditioning Station, Standard Operation, TM2, ZrC #7, Electrical Check
|
Electrical check of TM#2 at the conditioning station under vacuum. The resistance value of the target to 60kV common is a bit lower then what it was at the south hot cell. |
|