Entry  Tuesday, July 28, 2015, 14:36, chad fisher, South Hot-Cell, Standard Operation, TM4, SiC#31, SiC#31 Autopsy 
Extraction electrode was removed from SiC#31 and target inspected.
Pictures of findings can be found at          https://documents.triumf.ca/docushare/dsweb/View/Collection-15131
 
Entry  Tuesday, July 28, 2015, 14:40, chad fisher, South Hot-Cell, Standard Operation, TM4, SiC#31 UCx#13, SiC#31 removed UCx#13 installed 20150727_115314.jpg
SiC#31 has been removed from TM4 and UCx#13 installed. UCx#13 connection to the 9 pin connector was VERY VERY tight to the tube heater insulator on both
the test jig and module.
 
Entry  Thursday, August 06, 2015, 11:40, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module moved 
TM#2 is now in the south hot cell
Entry  Monday, August 10, 2015, 14:07, Isaac Earle, South Hot-Cell, Repair, TM2, , TM2 Containment Box Removed 
The containment box was taken off TM2 in preparation for installation of a new coil line isolator.
ITA6272 and ITA6273 have been received from the Scintillator Shop.  ITA6274 should be ready by the end of today.
Entry  Thursday, August 13, 2015, 09:17, chad fisher, South Hot-Cell, Repair, TM2, , TM2 status 20150811_132709.jpg20150813_083255.jpg20150813_090814.jpg
Tuesday, August 11,  insulator ITA6272 was installed onto the "pin x" line (unused plasma electrode) and tested; it seems to have successfully
eliminated the shorts on that line.
Wednesday, August 12  "shunts" installed on tube heater and oven circuit and electrically  tested.
Entry  Thursday, August 13, 2015, 11:34, Travis Cave, South Hot-Cell, Standard Operation, TM2, Dummy Target, Electrical Check TM2_elechknotgtafterwidget.PDFTM2_elechknotgtshunt.PDFTM2_elecchkdummytgt.PDF
Electrical check of TM2 without target after that widget has installed, electrical check with the shunts on, electrical check with the dummy target installed.
Entry  Thursday, August 13, 2015, 13:46, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Status 
As previously mentioned, dump target installed with new mounting and high current fasteners.
Leak Check complete and ready to move to CS at 1:30
Entry  Thursday, August 20, 2015, 10:15, Travis Cave, South Hot-Cell, Standard Operation, TM2, Dummy Target, Module moved 
TM#2 is now in the south hot cell.
Entry  Friday, August 21, 2015, 11:38, Anders Mjos, South Hot-Cell, Repair, TM2, FEBIAD Test Target, Steerer wires found to be touching the gas lines 
Yesterday TM2 was inspected in the SHC. Spark marks were found both on the steerer wires and on the ANODE wire. The steerer wires (GND)  were touching
the gas lines (60kV). This is likely the cause of the sparking observed at the Conditioning Station (e-log).
Photos are available on DocuShare
Entry  Tuesday, August 25, 2015, 13:54, Grant Minor, South Hot-Cell, Repair, TM2, ZrC#7, TM2 - Electrical / HV Short Repair and Current Status (ZrC target) TM2_Loose_Wires_Touching_Febiad_Gas_Line_notes_21Aug2015.jpgTM2_Wire_Bundle_Clear_of_Febiad_Gas_Line_notes_25Aug2015.jpg
Hello all, 

TM2's first performance in the Conditioning Station with the new source  tray was not great, with sparking and HV degradation beginning to occur
Entry  Wednesday, August 26, 2015, 09:20, Travis Cave, South Hot-Cell, Standard Operation, TM2, ZrC #7, Electrical Check TM2_elec_chk_ZrC7_SHC.PDF
Electrical check of TM#2 with ZrC #7 installed
Entry  Wednesday, August 26, 2015, 10:55, chad fisher, South Hot-Cell, Repair, TM2, ZrC#7, New wiring and target 20150826_090047.jpg
New wiring was installed yesterday as well as ZrC#7 which had its high current fasteners torqued to 130 in lbs.
 
Entry  Wednesday, September 09, 2015, 09:59, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, Module moved 
TM#1 has been moved from the south west silo to the south hot cell.
Entry  Thursday, September 10, 2015, 08:55, chad fisher, South Hot-Cell, Repair, TM1, , TM1 Window Leak Diag. P0000122.JPG
Vacuum leak check on the window line circuit of TM1 took place yesterday and again to confirm this morning. Both days the response to helium is in the
area of a soldered reduction fitting at the top of the containment box above and to the shutter side of the extraction column (see attached picture). To
verify this morning each joint in the system had a 1 second shot of helium and then timed for 1 minute to wait for a response. This area responded both
Entry  Thursday, September 10, 2015, 08:59, chad fisher, South Hot-Cell, Repair, , , Manipulator Mait. and field check Sept. 4 
Hot cell was entered for preventative mait. on left manip. field measurements around the cell were taken in prep. for window removal in January and left/south
light bulb changed.
Hottest item in the cell was the conductor block end of the TM4 febiad coil line. It was 70 mSv/H on contact and seemed to be the major source
Entry  Tuesday, September 15, 2015, 08:24, David Wang, South Hot-Cell, Repair, TM1, UCx 13, Leak check on TM1 window circuit soldering stems in service cap. 
I did a leak check on TM1 window circuit  2 soldering  stems in service cap.The round side panel was opened for the job. I sprayed helium on
the stems for 10 seconds. The leak detector got a tiny response(from 0.0xE-9 atm.cc/sec to 2.0xE-9 atm.cc/sec). The test  repeated again. The second
time, LD climbed  to 1.2xE-9atm.cc/sec. It looks like there is a very tiny leak on the stems soldering spots. But , this is not the same leak we found
Entry  Tuesday, September 15, 2015, 11:06, chad fisher, South Hot-Cell, Repair, TM1, , TM1 Window Gasket Replacement 
Replaced the custom silver gaskets on the entrance window panel of TM1 this morning...this has eliminated an sign of leak at this joint, however there
appears to still be a leak somewhere...a good distance from the vcr joints of the window as we are getting a drift response.
Chad sprayed helium to soldering stems in containment box which we suspected with leak last week. With 1second click  on helium, after 80
Entry  Thursday, September 17, 2015, 09:01, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, Module moved 
TM#1 has been moved from the south hot cell to the north east silo.
Entry  Tuesday, September 22, 2015, 11:35, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#13, Electrical Check TM4elecchkUC13postbeamSHC.PDFTM4_elecchk_totgt_with_IGLISline.PDF
TM#4 with UC#13 post beam electrical check. Also and electrical check was done without the target on.
Entry  Tuesday, September 22, 2015, 11:39, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#46, Electrical Check TM4Ta46elecchkSHC.PDF
TM#4 electrical check with Ta#46 attached.